### Copyright 2018 California Department of Transportation. All rights reserved. closureID | logNumber | requestDateTime | requestEpoch | startDateTime | startEpoch | endDateTime | endEpoch | isEndDateIndefinite | beginCounty | endCounty | route | trafficFlowDirection | beginRouteSuffix | beginPostmilePrefix | beginPostmile | beginAlignment | beginDirection | beginLatitude | beginLongitude | beginMilepost | beginLocationName | beginFreeFormDescription | endRouteSuffix | endPostmilePrefix | endPostmile | endAlignment | endDirection | endLatitude | endLongitude | endMilepost | endLocationName | endFreeFormDescription | facility | typeOfClosure | durationOfClosure | typeOfWork | estimatedDelay | lanesClosed | totalExistingLanes | isCode1097 | code1097DateTime | code1097Epoch | isCode1098 | code1098DateTime | code1098Epoch | isCode1022 | code1022DateTime | code1022Epoch | isCHINReportable C1SA | 1 | 2025-01-13 08:26:48 | 1736785608 | 2025-01-20 06:01:00 | 1737381660 | 2025-01-20 13:59:00 | 1737410340 | N | Orange | Orange | 1 | NB | | | 17.43 | | | 33.613139 | -117.891514 | | Jamboree Rd | | | | 18.07 | | | 33.616186 | -117.908206 | | Bayside Dr | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | Y | 2025-01-20 09:01:29 | 1737392489 | N | | | N | | | N C1JA | 28 | 2025-01-14 13:22:02 | 1736889722 | 2025-01-20 08:01:00 | 1737388860 | 2025-01-20 14:59:00 | 1737413940 | N | Orange | Orange | 1 | SB | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 8.21 | | | 33.529402 | -117.772121 | 4.294 | Agate St | Ruby St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 23 | 2025-01-14 13:21:31 | 1736889691 | 2025-01-20 08:01:29 | 1737388889 | 2025-01-20 14:59:29 | 1737413969 | N | Orange | Orange | 1 | SB | | | 10.16 | | | 33.54718 | -117.796847 | 6.244 | Wave St | Ledroit St | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 6 | 2025-01-14 13:16:42 | 1736889402 | 2025-01-20 08:01:39 | 1737388899 | 2025-01-20 14:59:39 | 1737413979 | N | Orange | Orange | 1 | NB | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 10.16 | | | 33.547267 | -117.796819 | 6.244 | Wave St | Ledroit St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | Y | 2025-01-20 08:01:31 | 1737388891 | Y | 2025-01-20 14:49:46 | 1737413386 | N | | | Y C90FA | 26 | 2025-01-13 04:38:37 | 1736771917 | 2025-01-20 09:01:00 | 1737392460 | 2025-01-20 14:59:00 | 1737413940 | N | Orange | Orange | 90 | EB | | | 5.331 | | | 33.911032 | -117.885496 | | State College Blvd | | | | 5.331 | | | 33.910988 | -117.885464 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Striping Operation | 1 | 1, 2, 3 | 3 | N | | | N | | | Y | 2025-01-20 08:29:27 | 1737390567 | Y C1LA | 11 | 2025-01-16 14:10:06 | 1737065406 | 2025-01-20 09:01:00 | 1737392460 | 2025-01-20 14:59:00 | 1737413940 | N | Orange | Orange | 1 | SB | | | 5.73 | | | 33.500948 | -117.743359 | 1.814 | 3RD AVE | Closure starts at 5th Ave. | | | 5.5 | | | 33.499444 | -117.741971 | 1.584 | 7th Ave / Circle Dr | Closure ends at 7th Ave. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | Y | 2025-01-20 09:00:59 | 1737392459 | Y | 2025-01-20 14:45:18 | 1737413118 | N | | | Y C1SA | 16 | 2025-01-13 08:29:04 | 1736785744 | 2025-01-20 09:01:00 | 1737392460 | 2025-01-20 15:30:00 | 1737415800 | N | Orange | Orange | 1 | SB | | | 18.07 | | | 33.616223 | -117.902259 | | Bayside Dr | | | | 17.43 | | | 33.613221 | -117.894152 | 28.814 | Jamboree Rd | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | Y | 2025-01-20 09:01:29 | 1737392489 | N | | | N | | | N C90FA | 36 | 2025-01-13 19:29:01 | 1736825341 | 2025-01-20 09:01:00 | 1737392460 | 2025-01-20 14:59:00 | 1737413940 | N | Orange | Orange | 90 | EB | | | 6.58 | | | 33.910889 | -117.869691 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.910987 | -117.862862 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, 1, 2, 3 | 3 | N | | | N | | | Y | 2025-01-20 08:29:27 | 1737390567 | Y C57MA | 16 | 2025-01-13 19:32:41 | 1736825561 | 2025-01-20 09:01:00 | 1737392460 | 2025-01-20 14:59:00 | 1737413940 | N | Orange | Orange | 57 | SB | | | 19.86 | | EB | 33.911135 | -117.886347 | 9.211 | Imperial Hwy, Hwy 90 | | | | 19.86 | | SB | 33.908491 | -117.88291 | 9.402 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | Y | 2025-01-20 08:29:27 | 1737390567 | N C405MC | 2 | 2025-01-16 15:50:20 | 1737071420 | 2025-01-20 09:01:00 | 1737392460 | 2025-01-20 15:01:00 | 1737414060 | N | Orange | Orange | 405 | NB | | | 13.78 | | | 33.705441 | -117.954355 | 13.55 | Brookhurst St | | | | 14.82 | | | 33.716026 | -117.966943 | 14.59 | Warner Ave | NB 405 Fwy | Mainline | Lane | Standard | Permit Work | | RShoulder | 5 | N | | | N | | | N | | | N C90FA | 41 | 2025-01-13 19:31:00 | 1736825460 | 2025-01-20 09:01:00 | 1737392460 | 2025-01-20 14:59:00 | 1737413940 | N | Orange | Orange | 90 | WB | | | 6.58 | | | 33.911212 | -117.858815 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911143 | -117.864477 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3 | 3 | N | | | N | | | Y | 2025-01-20 08:29:27 | 1737390567 | Y C57MA | 11 | 2025-01-13 04:44:48 | 1736772288 | 2025-01-20 09:01:00 | 1737392460 | 2025-01-20 14:59:00 | 1737413940 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Alternating Lanes | Standard | Striping Operation | 1 | L T Lane 1, 1, R T Lane 1 | 3 | N | | | N | | | Y | 2025-01-20 08:29:26 | 1737390566 | N C1SA | 26 | 2025-01-13 08:31:13 | 1736785873 | 2025-01-20 09:01:12 | 1737392472 | 2025-01-20 15:30:12 | 1737415812 | N | Orange | Orange | 1 | NB | | | 24.72 | | | 33.656826 | -118.001371 | 20.814 | MAIN ST (DOWN TOWN) | | | | 25.72 | | | 33.666651 | -118.015045 | 28.814 | 10th st | 17th Street | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1SA | 11 | 2025-01-13 08:28:14 | 1736785694 | 2025-01-20 09:01:12 | 1737392472 | 2025-01-20 15:30:12 | 1737415812 | N | Orange | Orange | 1 | NB | | | 32.72 | | | 33.74105 | -118.095638 | 25.41 | Seal Beach Blvd | | | | 33.72 | | | 33.749903 | -118.105868 | 28.814 | Orange / Los Angeles County Line | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1JA | 1 | 2025-01-14 13:15:20 | 1736889320 | 2025-01-20 09:01:18 | 1737392478 | 2025-01-20 15:59:18 | 1737417558 | N | Orange | Orange | 1 | NB | | | 8.21 | | | 33.529474 | -117.772042 | 4.294 | Agate St | Ruby St | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | N | | | N | | | N | | | Y C1LA | 1 | 2025-01-16 13:38:20 | 1737063500 | 2025-01-20 09:01:18 | 1737392478 | 2025-01-20 14:59:18 | 1737413958 | N | Orange | Orange | 1 | NB | | | 6.47 | | | 33.508465 | -117.750123 | 2.554 | Aliso Way | Closure starts at Camel Pt. | | | 7.35 | | | 33.52085 | -117.761361 | 3.434 | Nyes Pl | Closure ends at Hinkle | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | Y | 2025-01-20 09:00:58 | 1737392458 | Y | 2025-01-20 14:45:18 | 1737413118 | N | | | Y P39GA | 11 | 2025-01-13 16:50:22 | 1736815822 | 2025-01-20 09:01:19 | 1737392479 | 2025-01-20 14:59:19 | 1737413959 | N | Orange | Orange | 39 | NB | | | 22.66 | | | 33.939034 | -117.934656 | 20.88 | Harbor Blvd | West of Harbor Blvd. | | | 23.2 | | | 33.939055 | -117.933084 | | End County | Harbor Blvd. | Conventional Hwy | Lane | Standard | Permit Work | | L T Lane 2, R T Lane 1 | 2 | N | | | N | | | N | | | N C1SA | 6 | 2025-01-13 08:27:26 | 1736785646 | 2025-01-20 09:01:24 | 1737392484 | 2025-01-20 15:30:24 | 1737415824 | N | Orange | Orange | 1 | NB | | | 29.89 | | | 33.728225 | -118.082819 | 22.58 | Warner Ave | Phillips St | | | 32.72 | | | 33.740818 | -118.095271 | 28.814 | Seal Beach Blvd | | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | Y | 2025-01-20 09:01:29 | 1737392489 | N | | | N | | | Y P1BA | 1 | 2025-01-13 12:34:50 | 1736800490 | 2025-01-20 09:01:48 | 1737392508 | 2025-01-20 14:59:48 | 1737413988 | N | Orange | Orange | 1 | NB | | | 19.41 | | | 33.616967 | -117.917324 | 15.504 | Tustin Ave | | | | 19.41 | | | 33.617589 | -117.918868 | 15.504 | Tustin Ave | | Conventional Hwy | Lane | Standard | Permit Work | 5 | 3 | 3 | Y | 2025-01-20 09:00:09 | 1737392409 | Y | 2025-01-20 14:22:18 | 1737411738 | N | | | N P39GA | 18 | 2025-01-15 13:36:55 | 1736977015 | 2025-01-20 09:01:52 | 1737392512 | 2025-01-20 11:59:52 | 1737403192 | N | Orange | Orange | 39 | NB | | | 20.17 | | | 33.930897 | -117.967736 | 18.39 | La Habra Blvd | South of La Habra Blvd. (Phase 1) | | | 20.17 | | | 33.93185 | -117.967747 | 18.39 | La Habra Blvd | | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1 | 3 | Y | 2025-01-20 09:14:05 | 1737393245 | Y | 2025-01-20 11:55:59 | 1737402959 | N | | | N C1SA | 31 | 2025-01-13 08:31:56 | 1736785916 | 2025-01-20 09:01:55 | 1737392515 | 2025-01-20 15:30:55 | 1737415855 | N | Orange | Orange | 1 | SB | | | 25.72 | | | 33.665092 | -118.013153 | 21.814 | 10th st | 17th street | | | 24.72 | | | 33.656989 | -118.00192 | 28.814 | MAIN ST (DOWN TOWN) | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1LA | 6 | 2025-01-16 13:40:57 | 1737063657 | 2025-01-20 09:01:55 | 1737392515 | 2025-01-20 14:59:55 | 1737413995 | N | Orange | Orange | 1 | SB | | | 6.47 | | | 33.505337 | -117.746863 | 2.554 | Aliso Way | Bluff Dr. is where closure starts | | | 5.73 | | | 33.5049 | -117.746412 | 1.814 | 3RD AVE | Closure ends south of Bluff. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | Y | 2025-01-20 09:00:59 | 1737392459 | Y | 2025-01-20 14:45:18 | 1737413118 | N | | | Y C1SA | 21 | 2025-01-13 08:29:58 | 1736785798 | 2025-01-20 09:01:57 | 1737392517 | 2025-01-20 15:30:57 | 1737415857 | N | Orange | Orange | 1 | SB | | | 32.72 | | | 33.740761 | -118.095344 | 25.41 | Seal Beach Blvd | | | | 31.5 | | | 33.727877 | -118.082549 | 28.814 | Warner Ave | Phillips St | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y P39GA | 23 | 2025-01-15 13:46:19 | 1736977579 | 2025-01-20 12:01:17 | 1737403277 | 2025-01-20 14:59:17 | 1737413957 | N | Orange | Orange | 39 | SB | | | 20.17 | | | 33.934507 | -117.968052 | 18.39 | La Habra Blvd | North of La Habra Blvd. (Phase 2) | | | 20.17 | | | 33.931872 | -117.967966 | 18.39 | La Habra Blvd | South of La Habra Blvd. | Conventional Hwy | Lane | Standard | Permit Work | | 3, R T Lane 1 | 3 | Y | 2025-01-20 12:06:35 | 1737403595 | Y | 2025-01-20 14:00:00 | 1737410400 | N | | | N C5IC | 12 | 2024-12-26 16:09:10 | 1735258150 | 2025-01-20 20:01:08 | 1737432068 | 2025-01-21 04:59:08 | 1737464348 | N | Orange | Orange | 5 | SB | | | 24.99 | | | 33.690068 | -117.768724 | | Jeffrey Rd | | | | 23.94 | | | 33.675839 | -117.756964 | | Sand Cyn Rd | | Mainline | Lane | Standard | Miscellaneous Work | | 5 | 5 | N | | | N | | | N | | | N C73XA | 27 | 2024-12-26 16:26:13 | 1735259173 | 2025-01-20 20:01:10 | 1737432070 | 2025-01-21 04:59:10 | 1737464350 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C73XA | 37 | 2024-12-26 16:28:44 | 1735259324 | 2025-01-20 20:01:41 | 1737432101 | 2025-01-21 04:59:41 | 1737464381 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C5LA | 3 | 2025-01-15 11:17:45 | 1736968665 | 2025-01-20 20:01:43 | 1737432103 | 2025-01-21 01:59:43 | 1737453583 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1 | 4 | Y | 2025-01-20 19:50:46 | 1737431446 | N | | | N | | | N C73XA | 53 | 2025-01-16 14:04:57 | 1737065097 | 2025-01-20 20:01:55 | 1737432115 | 2025-01-21 04:59:55 | 1737464395 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C73XA | 45 | 2025-01-16 14:03:59 | 1737065039 | 2025-01-20 20:01:56 | 1737432116 | 2025-01-21 04:59:56 | 1737464396 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 47 | 2025-01-15 16:26:25 | 1736987185 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | SB | | | 9.44 | | SB | 33.726671 | -117.837023 | | Edinger Ave | | | | 9.44 | | SB | 33.726671 | -117.837023 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Sign Work | | All | 2 | Y | 2025-01-20 21:36:47 | 1737437807 | N | | | N | | | N C55DA | 60 | 2025-01-15 17:01:34 | 1736989294 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | N/A | | | 7.85 | | WB | 33.708467 | -117.851332 | | Dyer Rd | | | | 7.85 | | | 33.708467 | -117.851332 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C55NA | 25 | 2025-01-14 14:20:36 | 1736893236 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | NB | | | 6.12 | | NB | 33.686378 | -117.864111 | | John Wayne Airport | | | | 6.12 | | NB | 33.686467 | -117.864154 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55NA | 29 | 2025-01-14 14:26:26 | 1736893586 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 64 | 2025-01-15 17:01:45 | 1736989305 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | N/A | | | 7.85 | | EB | 33.708668 | -117.85086 | | Dyer Rd | | | | 7.85 | | | 33.708668 | -117.85086 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C55NA | 37 | 2025-01-16 14:56:02 | 1737068162 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | SB | | | 5.32 | | | 33.679784 | -117.879634 | | Baker St | | | | 4.02 | | | 33.665955 | -117.895056 | | Mesa Dr | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | Y | 2025-01-20 22:40:31 | 1737441631 | N | | | N | | | N C55DA | 16 | 2025-01-08 15:51:24 | 1736380284 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | SB | | | 9.44 | | SB | 33.727599 | -117.834717 | | Costa Mesa Frwy, Rte 55 | | | | 9.44 | | SB | 33.727555 | -117.83476 | | Edinger Ave | | Off Ramp | Full | Standard | Concrete Pour | | All | 2 | Y | 2025-01-20 21:36:47 | 1737437807 | N | | | N | | | N C405IC | 1 | 2025-01-16 17:18:52 | 1737076732 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | Y | 2025-01-20 22:10:37 | 1737439837 | N | | | N | | | N C55DA | 72 | 2025-01-16 13:24:41 | 1737062681 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | N/A | | | 7.85 | | SB | 33.709078 | -117.85211 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.709078 | -117.85211 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C55DA | 68 | 2025-01-16 13:24:27 | 1737062667 | 2025-01-20 21:01:00 | 1737435660 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | N/A | | | 7.85 | | NB | 33.70902 | -117.852051 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.70902 | -117.852051 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C73XA | 57 | 2025-01-16 14:07:03 | 1737065223 | 2025-01-20 21:01:01 | 1737435661 | 2025-01-21 03:59:01 | 1737460741 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C73XA | 23 | 2024-12-26 16:26:05 | 1735259165 | 2025-01-20 21:01:02 | 1737435662 | 2025-01-21 04:59:02 | 1737464342 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55DA | 48 | 2025-01-15 16:58:07 | 1736989087 | 2025-01-20 21:01:04 | 1737435664 | 2025-01-21 04:59:04 | 1737464344 | N | Orange | Orange | 55 | SB | | | 6.99 | | SB | 33.699652 | -117.863456 | | Macarthur Blvd | | | | 6.99 | | SB | 33.699652 | -117.863456 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C73XA | 2 | 2024-12-26 13:54:06 | 1735250046 | 2025-01-20 21:01:04 | 1737435664 | 2025-01-21 04:59:04 | 1737464344 | N | Orange | Orange | 73 | SB | | | 26.5 | | SB | 33.679925 | -117.880395 | | Baker St | | | | 26.5 | | SB | 33.679916 | -117.880411 | | RTE. 73 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | Y | 2025-01-20 20:54:24 | 1737435264 | N | | | N | | | N C55DA | 56 | 2025-01-15 17:00:13 | 1736989213 | 2025-01-20 21:01:10 | 1737435670 | 2025-01-21 04:59:10 | 1737464350 | N | Orange | Orange | 55 | NB | | | 6.99 | | WB | 33.697575 | -117.859759 | | Macarthur Blvd | Macarthur Blvd NB on ramp (MA4Line) | | | 6.99 | | NB | 33.697535 | -117.859727 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | Y | 2025-01-20 22:26:09 | 1737440769 | N | | | N | | | N C73XA | 49 | 2025-01-16 14:04:14 | 1737065054 | 2025-01-20 21:01:11 | 1737435671 | 2025-01-21 03:59:11 | 1737460751 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 52 | 2025-01-15 16:59:17 | 1736989157 | 2025-01-20 21:01:15 | 1737435675 | 2025-01-21 04:59:15 | 1737464355 | N | Orange | Orange | 55 | NB | | | 6.99 | | EB | 33.698204 | -117.861068 | | Macarthur Blvd | Macarthur Blvd NB Loop on ramp (MA5 Line) | | | 6.99 | | NB | 33.698204 | -117.861133 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | Y | 2025-01-20 21:36:47 | 1737437807 | N | | | N | | | N C55NA | 12 | 2024-12-26 14:30:19 | 1735252219 | 2025-01-20 21:01:17 | 1737435677 | 2025-01-21 04:59:17 | 1737464357 | N | Orange | Orange | 55 | SB | | | 4.74 | | SB | 33.6778 | -117.881528 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | SB | 33.67355 | -117.886206 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 34 | 2025-01-14 15:12:20 | 1736896340 | 2025-01-20 21:01:17 | 1737435677 | 2025-01-21 04:59:17 | 1737464357 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55NA | 17 | 2024-12-26 15:30:20 | 1735255820 | 2025-01-20 21:01:18 | 1737435678 | 2025-01-21 04:59:18 | 1737464358 | N | Orange | Orange | 55 | NB | | | 10.98 | | NB | 33.741007 | -117.833684 | 10.792 | Costa Mesa Frwy, Rte 55 | | | | 10.98 | | NB | 33.741007 | -117.833692 | 95.252 | Fourth St/ Irvine Blvd | | Off Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55DA | 22 | 2025-01-14 15:05:22 | 1736895922 | 2025-01-20 21:01:19 | 1737435679 | 2025-01-21 04:59:19 | 1737464359 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | Y | 2025-01-20 22:47:18 | 1737442038 | N | | | N | | | N C405MA | 5 | 2025-01-14 13:54:21 | 1736891661 | 2025-01-20 21:01:19 | 1737435679 | 2025-01-21 04:59:19 | 1737464359 | N | Orange | Orange | 405 | NB | | | 8.74 | | NB | 33.686947 | -117.865954 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | SB | 33.686912 | -117.865938 | 8.51 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C133ZA | 2 | 2025-01-14 13:56:22 | 1736891782 | 2025-01-20 21:01:20 | 1737435680 | 2025-01-21 04:59:20 | 1737464360 | N | Orange | Orange | 133 | SB | | | 9.565 | | SB | 33.680719 | -117.749618 | 9.579 | Laguna Cyn Frwy, Rte 133 | | | | 9.565 | | NB | 33.680717 | -117.749615 | 9.579 | Santa Ana Frwy, Rte 5 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405CA | 51 | 2025-01-13 20:18:26 | 1736828306 | 2025-01-20 21:01:26 | 1737435686 | 2025-01-21 04:59:26 | 1737464366 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 4, 5, RShoulder | 5 | N | | | N | | | N | | | N C73XA | 12 | 2024-12-26 14:56:28 | 1735253788 | 2025-01-20 21:01:26 | 1737435686 | 2025-01-21 04:59:26 | 1737464366 | N | Orange | Orange | 73 | NB | | | 26.581 | | NB | 33.670641 | -117.883362 | | RTE. 73 | | | | 26.581 | | SB | 33.670573 | -117.883338 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | Y | 2025-01-20 22:18:40 | 1737440320 | N | | | N | | | Y C405MA | 1 | 2025-01-14 12:57:30 | 1736888250 | 2025-01-20 21:01:28 | 1737435688 | 2025-01-21 04:59:28 | 1737464368 | N | Orange | Orange | 405 | SB | | | 8.74 | | SB | 33.687112 | -117.879621 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.687085 | -117.879573 | 8.51 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5IC | 7 | 2024-12-26 15:35:33 | 1735256133 | 2025-01-20 21:01:30 | 1737435690 | 2025-01-21 04:59:30 | 1737464370 | N | Orange | Orange | 5 | NB | | | 30.28 | | NB | 33.739449 | -117.829518 | 102.335 | Santa Ana Fwy, Freeway I-5 | | | | 30.28 | | NB | 33.739369 | -117.829459 | 95.252 | Route 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 33 | 2024-12-26 16:28:35 | 1735259315 | 2025-01-20 21:01:33 | 1737435693 | 2025-01-21 04:59:33 | 1737464373 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55NA | 7 | 2024-12-26 14:25:41 | 1735251941 | 2025-01-20 21:01:39 | 1737435699 | 2025-01-21 04:59:39 | 1737464379 | N | Orange | Orange | 55 | NB | | | 4.74 | | NB | 33.67044 | -117.889523 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | NB | 33.670387 | -117.889553 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 7 | 2024-12-26 14:27:44 | 1735252064 | 2025-01-20 21:01:41 | 1737435701 | 2025-01-21 04:59:41 | 1737464381 | N | Orange | Orange | 73 | NB | | | 9.44 | | NB | 33.670498 | -117.889478 | | RTE. 73 | | | | 9.44 | | NB | 33.670481 | -117.889456 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405MA | 9 | 2025-01-14 14:18:45 | 1736893125 | 2025-01-20 21:01:42 | 1737435702 | 2025-01-21 04:59:42 | 1737464382 | N | Orange | Orange | 405 | NB | | | 8.74 | | NB | 33.686966 | -117.865938 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.686946 | -117.865905 | 9.579 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55NA | 2 | 2024-12-26 14:11:45 | 1735251105 | 2025-01-20 21:01:43 | 1737435703 | 2025-01-21 04:59:43 | 1737464383 | N | Orange | Orange | 55 | NB | | | 4.737 | | NB | 33.66815 | -117.892307 | 0 | Costa Mesa Frwy, Rte 55 | | | | 4.737 | | SB | 33.668114 | -117.892308 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | Y | 2025-01-20 23:58:48 | 1737446328 | N | | | N | | | Y C5IC | 2 | 2024-12-26 15:09:50 | 1735254590 | 2025-01-20 21:01:48 | 1737435708 | 2025-01-21 04:59:48 | 1737464388 | N | Orange | Orange | 5 | SB | | | 23.19 | | SB | 33.680593 | -117.749709 | 95.189 | Santa Ana Fwy, Freeway I-5 | | | | 23.19 | | NB | 33.68057 | -117.749716 | 95.252 | Route 133 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405CA | 39 | 2025-01-13 20:16:51 | 1736828211 | 2025-01-20 21:01:51 | 1737435711 | 2025-01-21 05:59:51 | 1737467991 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 4, RShoulder | 4 | N | | | N | | | N | | | N C405CA | 27 | 2025-01-13 20:13:52 | 1736828032 | 2025-01-20 21:01:51 | 1737435711 | 2025-01-21 04:59:51 | 1737464391 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV | 4 | Y | 2025-01-20 22:18:10 | 1737440290 | N | | | N | | | N C5IC | 20 | 2025-01-16 17:28:58 | 1737077338 | 2025-01-20 21:01:55 | 1737435715 | 2025-01-21 04:59:55 | 1737464395 | N | Orange | Orange | 5 | NB | | | 21.304 | | NB | 33.638633 | -117.729853 | 93.303 | Santa Ana Fwy, Freeway I-5 | | | | 21.304 | | NB | 33.638615 | -117.729837 | 93.366 | 405/5 JCT | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 17 | 2024-12-26 15:00:01 | 1735254001 | 2025-01-20 21:01:59 | 1737435719 | 2025-01-21 04:59:59 | 1737464399 | N | Orange | Orange | 73 | SB | | | 26.581 | | SB | 33.668498 | -117.881491 | | RTE. 73 | | | | 26.581 | | SB | 33.668409 | -117.881469 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C57AA | 4 | 2025-01-14 15:11:58 | 1736896318 | 2025-01-20 22:01:00 | 1737439260 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 57 | SB | | | 17.57 | | | 33.877863 | -117.880518 | 6.921 | Nutwood Ave | | | | 14.78 | | | 33.8379 | -117.876235 | 4.131 | Lincoln Ave | | Mainline | Lane | Standard | Striping Operation | | HOV, 1, 2 | 4 | Y | 2025-01-20 22:05:30 | 1737439530 | N | | | N | | | Y C55NA | 33 | 2025-01-14 14:26:38 | 1736893598 | 2025-01-20 22:01:00 | 1737439260 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C405IC | 5 | 2025-01-16 17:19:02 | 1737076742 | 2025-01-20 22:01:00 | 1737439260 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | Y | 2025-01-20 22:10:37 | 1737439837 | N | | | N | | | Y C1JA | 11 | 2025-01-14 13:19:08 | 1736889548 | 2025-01-20 22:01:06 | 1737439266 | 2025-01-21 04:59:06 | 1737464346 | N | Orange | Orange | 1 | NB | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 10.16 | | | 33.547267 | -117.796819 | 6.244 | Wave St | Ledroit St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C5LA | 23 | 2025-01-15 11:24:09 | 1736969049 | 2025-01-20 22:01:07 | 1737439267 | 2025-01-21 05:59:07 | 1737467947 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.76 | Crown Valley Pkwy | | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.842 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | Y | 2025-01-20 21:59:30 | 1737439170 | N | | | N | | | N C405CA | 43 | 2025-01-13 20:17:10 | 1736828230 | 2025-01-20 22:01:09 | 1737439269 | 2025-01-21 04:59:09 | 1737464349 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C405CA | 31 | 2025-01-13 20:14:10 | 1736828050 | 2025-01-20 22:01:10 | 1737439270 | 2025-01-21 04:59:10 | 1737464350 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N P57EA | 2 | 2025-01-13 16:55:22 | 1736816122 | 2025-01-20 22:01:19 | 1737439279 | 2025-01-21 04:59:19 | 1737464359 | N | Orange | Orange | 57 | N/A | | | 12.54 | | EB | 33.805764 | -117.883051 | 1.849 | Katella Ave | East of Howell Ave. (Stage 1F) | | | 12.54 | | | 33.805764 | -117.883051 | 1.806 | Orange Frwy, Rte 57 | East of Douglass Rd. | Surface Street | Lane | Standard | Permit Work | | 1, 2 | 3 | Y | 2025-01-20 22:22:04 | 1737440524 | N | | | N | | | N C5LA | 31 | 2025-01-15 11:28:27 | 1736969307 | 2025-01-20 22:01:25 | 1737439285 | 2025-01-21 05:59:25 | 1737467965 | N | Orange | Orange | 5 | SB | | | 12.94 | | SB | 33.547257 | -117.673473 | 84.92 | Avery Pkwy | | | | 12.94 | | SB | 33.547257 | -117.673473 | 85.002 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | Y | 2025-01-20 21:59:30 | 1737439170 | N | | | N | | | N C55DA | 38 | 2025-01-14 15:12:31 | 1736896351 | 2025-01-20 22:01:28 | 1737439288 | 2025-01-21 03:59:28 | 1737460768 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 26 | 2025-01-14 15:05:38 | 1736895938 | 2025-01-20 22:01:36 | 1737439296 | 2025-01-21 03:59:36 | 1737460776 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | Y | 2025-01-20 22:47:19 | 1737442039 | N | | | N | | | Y C1JA | 15 | 2025-01-14 13:19:41 | 1736889581 | 2025-01-20 22:01:39 | 1737439299 | 2025-01-21 04:59:39 | 1737464379 | N | Orange | Orange | 1 | NB | | | 8.21 | | | 33.529474 | -117.772042 | 4.294 | Agate St | Ruby St | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 33 | 2025-01-14 13:22:45 | 1736889765 | 2025-01-20 22:01:43 | 1737439303 | 2025-01-21 07:59:43 | 1737475183 | N | Orange | Orange | 1 | SB | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 8.21 | | | 33.529402 | -117.772121 | 4.294 | Agate St | Ruby St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C405CA | 55 | 2025-01-13 20:18:45 | 1736828325 | 2025-01-20 22:01:44 | 1737439304 | 2025-01-21 04:59:44 | 1737464384 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 3, 4, 5, RShoulder | 5 | N | | | N | | | N | | | Y C1JA | 19 | 2025-01-14 13:20:50 | 1736889650 | 2025-01-20 22:01:48 | 1737439308 | 2025-01-21 07:59:48 | 1737475188 | N | Orange | Orange | 1 | SB | | | 10.16 | | | 33.54718 | -117.796847 | 6.244 | Wave St | Ledroit St | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C5MA | 1 | 2025-01-06 12:13:03 | 1736194383 | 2025-01-20 23:01:01 | 1737442861 | 2025-01-21 04:59:01 | 1737464341 | N | Orange | Orange | 5 | NB | | | 28.25 | | NB | 33.725239 | -117.802745 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | Y | 2025-01-20 23:01:39 | 1737442899 | N C5MA | 11 | 2025-01-06 12:19:09 | 1736194749 | 2025-01-20 23:01:07 | 1737442867 | 2025-01-21 04:59:07 | 1737464347 | N | Orange | Orange | 5 | SB | | | 29.61 | | SB | 33.741509 | -117.836571 | 101.602 | Santa Ana Fwy, Freeway I-5 | | | | 29.61 | | | 33.73749 | -117.825956 | 101.602 | Newport Ave | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | Y | 2025-01-20 23:01:40 | 1737442900 | N | | | N | | | N C405CA | 35 | 2025-01-13 20:14:24 | 1736828064 | 2025-01-20 23:01:23 | 1737442883 | 2025-01-21 03:59:23 | 1737460763 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C405CA | 47 | 2025-01-13 20:17:25 | 1736828245 | 2025-01-20 23:01:25 | 1737442885 | 2025-01-21 03:59:25 | 1737460765 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C55DA | 42 | 2025-01-14 15:12:44 | 1736896364 | 2025-01-20 23:01:42 | 1737442902 | 2025-01-21 02:59:42 | 1737457182 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C405CA | 66 | 2025-01-13 20:26:45 | 1736828805 | 2025-01-20 23:01:44 | 1737442904 | 2025-01-21 04:59:44 | 1737464384 | N | Orange | Orange | 405 | NB | | | 5.62 | | SB | 33.671023 | -117.821426 | 5.39 | Culver Dr | cu3 | | | 5.62 | | NB | 33.670646 | -117.825486 | 5.39 | San Diego Frwy, Rte 405 | | On Ramp | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | N C55DA | 30 | 2025-01-14 15:05:55 | 1736895955 | 2025-01-20 23:01:53 | 1737442913 | 2025-01-21 02:59:53 | 1737457193 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C5LA | 7 | 2025-01-15 11:17:56 | 1736968676 | 2025-01-20 23:01:54 | 1737442914 | 2025-01-21 01:59:54 | 1737453594 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1, 2 | 4 | Y | 2025-01-20 22:47:01 | 1737442021 | N | | | N | | | Y C5MA | 6 | 2025-01-06 12:15:58 | 1736194558 | 2025-01-20 23:01:56 | 1737442916 | 2025-01-21 04:59:56 | 1737464396 | N | Orange | Orange | 5 | SB | | | 28.25 | | SB | 33.7283 | -117.808281 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C405CA | 63 | 2025-01-13 20:26:00 | 1736828760 | 2025-01-20 23:01:59 | 1737442919 | 2025-01-21 04:59:59 | 1737464399 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.659473 | -117.776333 | 2.65 | Sand Canyon Ave | scd3 | | | 2.88 | | NB | 33.659578 | -117.780573 | 2.65 | San Diego Frwy, Rte 405 | | On Ramp | Full | Standard | Electrical Work | | All | 2 | N | | | N | | | N | | | N C405CA | 59 | 2025-01-13 20:22:52 | 1736828572 | 2025-01-20 23:59:00 | 1737446340 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 405 | NB | | | 1.8 | | NB | 33.651638 | -117.759285 | 1.57 | San Diego Frwy, Rte 405 | | | | 1.8 | | SB | 33.651866 | -117.761055 | 1.57 | Laguna Frwy, Rte 133 | c4 | Connector | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | Y C405EA | 9 | 2025-01-14 14:54:00 | 1736895240 | 2025-01-20 23:59:00 | 1737446340 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 405 | NB | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y C55NA | 21 | 2025-01-14 13:58:29 | 1736891909 | 2025-01-20 23:59:00 | 1737446340 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 55 | NB | | | 5.99 | | NB | 33.682922 | -117.876241 | | Costa Mesa Frwy, Rte 55 | | | | 5.99 | | SB | 33.682924 | -117.876229 | 9.579 | San Diego Frwy, Rte 405 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405EA | 10 | 2025-01-14 14:57:34 | 1736895454 | 2025-01-20 23:59:00 | 1737446340 | 2025-01-21 04:59:00 | 1737464340 | N | Orange | Orange | 405 | SB | | | 23.98 | | SB | 33.787777 | -118.095965 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.789498 | -118.088734 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y C5LA | 27 | 2025-01-15 11:24:48 | 1736969088 | 2025-01-21 02:01:00 | 1737453660 | 2025-01-21 05:59:00 | 1737467940 | N | Orange | Orange | 5 | SB | | | 12.94 | | SB | 33.55031 | -117.67299 | 84.92 | Santa Ana Fwy, Freeway I-5 | | | | 12.94 | | SB | 33.55031 | -117.67299 | 85.842 | Avery Pkwy | | Off Ramp | Full | Standard | Striping Operation | | All | 4 | N | | | N | | | N | | | N C5LA | 35 | 2025-01-15 11:29:15 | 1736969355 | 2025-01-21 02:01:13 | 1737453673 | 2025-01-21 05:59:13 | 1737467953 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.791 | Santa Ana Fwy, Freeway I-5 | | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.002 | Crown Valley Pkwy | | Off Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C5LA | 12 | 2025-01-15 11:18:48 | 1736968728 | 2025-01-21 02:01:46 | 1737453706 | 2025-01-21 04:59:46 | 1737464386 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C5LA | 17 | 2025-01-15 11:19:00 | 1736968740 | 2025-01-21 02:01:58 | 1737453718 | 2025-01-21 05:59:58 | 1737467998 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C1JA | 29 | 2025-01-14 13:22:02 | 1736889722 | 2025-01-21 08:01:00 | 1737475260 | 2025-01-21 14:59:00 | 1737500340 | N | Orange | Orange | 1 | SB | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 8.21 | | | 33.529402 | -117.772121 | 4.294 | Agate St | Ruby St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 24 | 2025-01-14 13:21:31 | 1736889691 | 2025-01-21 08:01:29 | 1737475289 | 2025-01-21 14:59:29 | 1737500369 | N | Orange | Orange | 1 | SB | | | 10.16 | | | 33.54718 | -117.796847 | 6.244 | Wave St | Ledroit St | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 7 | 2025-01-14 13:16:42 | 1736889402 | 2025-01-21 08:01:39 | 1737475299 | 2025-01-21 14:59:39 | 1737500379 | N | Orange | Orange | 1 | NB | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 10.16 | | | 33.547267 | -117.796819 | 6.244 | Wave St | Ledroit St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | N | | | N | | | N | | | Y C39EA | 2 | 2025-01-13 13:44:32 | 1736804672 | 2025-01-21 08:30:00 | 1737477000 | 2025-01-21 15:30:00 | 1737502200 | N | Orange | Orange | 39 | NB | | | 11.18 | | | 33.810162 | -117.993112 | 11.18 | Cerritos Ave | | | | 11.68 | | | 33.817432 | -117.993184 | 11.68 | Ball Rd | | Conventional Hwy | Lane | Standard | Utility Work | | 1, 2 | 4 | N | | | N | | | N | | | Y C90FA | 27 | 2025-01-13 04:39:01 | 1736771941 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:59:00 | 1737500340 | N | Orange | Orange | 90 | EB | | | 5.331 | | | 33.911032 | -117.885496 | | State College Blvd | | | | 5.331 | | | 33.910988 | -117.885464 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Striping Operation | 1 | 1, 2, 3 | 3 | N | | | N | | | N | | | Y M55CA | 1 | 2025-01-13 12:40:20 | 1736800820 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:01:00 | 1737496860 | N | Orange | Orange | 55 | N/A | | R | 5.51 | | EB | 33.682173 | -117.877966 | 5.34 | Paularino Ave | | | R | 5.51 | | | 33.682173 | -117.877966 | 5.34 | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Bridge Work | 0 | 2 | 2 | N | | | N | | | N | | | N M5BA | 3 | 2025-01-16 12:19:42 | 1737058782 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:01:00 | 1737496860 | N | Orange | Orange | 5 | SB | | R | 26.583 | | WB | 33.710187 | -117.783726 | 98.626 | Culver Dr | | | R | 26.583 | | SB | 33.708493 | -117.781056 | 98.626 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Sign Work | 5 | All | 1 | N | | | N | | | N | | | N M91EA | 1 | 2025-01-16 12:23:42 | 1737059022 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:30:00 | 1737498600 | N | Orange | Orange | 91 | EB | | R | .01 | | | 33.861893 | -118.041764 | 14.749 | Rte 91 - L.A./OC. County Line | | | | 5.258 | | | 33.854133 | -117.889548 | 23.631 | State College Blvd | | Mainline | Moving | Standard | Sweeping Operation | | Median, LShoulder, HOV | 4 | N | | | N | | | N | | | N M57NA | 1 | 2025-01-02 09:17:05 | 1735838225 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 13:30:00 | 1737495000 | N | Orange | Orange | 57 | NB | | | 12.54 | | | 33.80587 | -117.880191 | 1.806 | Katella Ave | | | | 16.39 | | | 33.861739 | -117.877275 | 5.656 | Orangethorpe Ave | | Mainline | Moving | Standard | Sweeping Operation | | HOV | 5 | N | | | N | | | N | | | N M57NA | 2 | 2025-01-02 09:21:50 | 1735838510 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 13:30:00 | 1737495000 | N | Orange | Orange | 57 | SB | | | 16.39 | | | 33.861582 | -117.877369 | 5.741 | Orangethorpe Ave | | | | 12.54 | | | 33.806183 | -117.880362 | 1.891 | Katella Ave | | Mainline | Moving | Standard | Sweeping Operation | | HOV | 5 | N | | | N | | | N | | | N C1LA | 12 | 2025-01-16 14:10:06 | 1737065406 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:59:00 | 1737500340 | N | Orange | Orange | 1 | SB | | | 5.73 | | | 33.500948 | -117.743359 | 1.814 | 3RD AVE | Closure starts at 5th Ave. | | | 5.5 | | | 33.4994 | -117.741967 | 1.584 | 7th Ave / Circle Dr | Closure ends at 7th Ave. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y C90FA | 32 | 2025-01-13 19:22:15 | 1736824935 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:59:00 | 1737500340 | N | Orange | Orange | 90 | WB | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3 | 3 | N | | | N | | | N | | | Y P39GA | 16 | 2025-01-14 12:21:33 | 1736886093 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:59:00 | 1737500340 | N | Orange | Orange | 39 | NB | | | 9.17 | | | 33.781245 | -117.992728 | 9.17 | Lampson Ave | | | | 9.67 | | | 33.788371 | -117.992868 | 9.67 | Chapman Ave | | Conventional Hwy | Lane | Standard | Permit Work | | 4 | 4 | N | | | N | | | N | | | N C90FA | 42 | 2025-01-13 19:31:13 | 1736825473 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:59:00 | 1737500340 | N | Orange | Orange | 90 | WB | | | 6.58 | | | 33.911212 | -117.858815 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911143 | -117.864477 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3 | 3 | N | | | N | | | N | | | Y C1SA | 17 | 2025-01-13 08:29:04 | 1736785744 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 15:30:00 | 1737502200 | N | Orange | Orange | 1 | SB | | | 18.07 | | | 33.616223 | -117.902259 | | Bayside Dr | | | | 17.43 | | | 33.613221 | -117.894152 | 28.814 | Jamboree Rd | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N C90FA | 37 | 2025-01-13 19:29:14 | 1736825354 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:59:00 | 1737500340 | N | Orange | Orange | 90 | EB | | | 6.58 | | | 33.910889 | -117.869691 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.910987 | -117.862862 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, 1, 2, 3 | 3 | N | | | N | | | N | | | Y C57MA | 17 | 2025-01-13 19:32:53 | 1736825573 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:59:00 | 1737500340 | N | Orange | Orange | 57 | SB | | | 19.86 | | EB | 33.911135 | -117.886347 | 9.211 | Imperial Hwy, Hwy 90 | | | | 19.86 | | SB | 33.908491 | -117.88291 | 9.402 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C1SA | 2 | 2025-01-13 08:26:48 | 1736785608 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 13:59:00 | 1737496740 | N | Orange | Orange | 1 | NB | | | 17.43 | | | 33.613139 | -117.891514 | | Jamboree Rd | | | | 18.07 | | | 33.616186 | -117.908206 | | Bayside Dr | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N C405MC | 3 | 2025-01-16 15:50:37 | 1737071437 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 15:01:00 | 1737500460 | N | Orange | Orange | 405 | NB | | | 13.78 | | | 33.705441 | -117.954355 | 13.55 | Brookhurst St | | | | 14.82 | | | 33.716026 | -117.966943 | 14.59 | Warner Ave | NB 405 Fwy | Mainline | Lane | Standard | Permit Work | | RShoulder | 5 | N | | | N | | | N | | | N C57MA | 12 | 2025-01-13 04:45:09 | 1736772309 | 2025-01-21 09:01:00 | 1737478860 | 2025-01-21 14:59:00 | 1737500340 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Alternating Lanes | Standard | Striping Operation | 1 | L T Lane 1, 1, R T Lane 1 | 3 | N | | | N | | | N | | | N C1SA | 27 | 2025-01-13 08:31:13 | 1736785873 | 2025-01-21 09:01:12 | 1737478872 | 2025-01-21 15:30:12 | 1737502212 | N | Orange | Orange | 1 | NB | | | 24.72 | | | 33.656826 | -118.001371 | 20.814 | MAIN ST (DOWN TOWN) | | | | 25.72 | | | 33.666651 | -118.015045 | 28.814 | 10th st | 17th Street | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1SA | 12 | 2025-01-13 08:28:14 | 1736785694 | 2025-01-21 09:01:12 | 1737478872 | 2025-01-21 15:30:12 | 1737502212 | N | Orange | Orange | 1 | NB | | | 32.72 | | | 33.74105 | -118.095638 | 25.41 | Seal Beach Blvd | | | | 33.72 | | | 33.749903 | -118.105868 | 28.814 | Orange / Los Angeles County Line | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1JA | 2 | 2025-01-14 13:15:20 | 1736889320 | 2025-01-21 09:01:18 | 1737478878 | 2025-01-21 15:59:18 | 1737503958 | N | Orange | Orange | 1 | NB | | | 8.21 | | | 33.529474 | -117.772042 | 4.294 | Agate St | Ruby St | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | N | | | N | | | N | | | Y C1LA | 2 | 2025-01-16 13:38:21 | 1737063501 | 2025-01-21 09:01:18 | 1737478878 | 2025-01-21 14:59:18 | 1737500358 | N | Orange | Orange | 1 | NB | | | 6.47 | | | 33.508465 | -117.750123 | 2.554 | Aliso Way | Closure starts at Camel Pt. | | | 7.35 | | | 33.52085 | -117.761361 | 3.434 | Nyes Pl | Closure ends at Hinkle | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y P39GA | 12 | 2025-01-13 16:50:22 | 1736815822 | 2025-01-21 09:01:19 | 1737478879 | 2025-01-21 14:59:19 | 1737500359 | N | Orange | Orange | 39 | NB | | | 22.66 | | | 33.939034 | -117.934656 | 20.88 | Harbor Blvd | West of Harbor Blvd. | | | 23.2 | | | 33.939055 | -117.933084 | | End County | Harbor Blvd. | Conventional Hwy | Lane | Standard | Permit Work | | L T Lane 2, R T Lane 1 | 2 | N | | | N | | | N | | | N P57EA | 6 | 2025-01-15 14:10:24 | 1736979024 | 2025-01-21 09:01:21 | 1737478881 | 2025-01-21 14:59:21 | 1737500361 | N | Orange | Orange | 57 | SB | | | 17.57 | | | 33.878018 | -117.88121 | 6.921 | Nutwood Ave | | | | 17.57 | | SB | 33.874406 | -117.881097 | 6.921 | Orange Frwy, Rte 57 | E Chapman Ave. | On Ramp | Lane | Standard | Permit Work | | 2 | 2 | N | | | N | | | N | | | N P57EA | 10 | 2025-01-15 14:13:23 | 1736979203 | 2025-01-21 09:01:21 | 1737478881 | 2025-01-21 14:59:21 | 1737500361 | N | Orange | Orange | 57 | N/A | | | 17.57 | | WB | 33.878135 | -117.880635 | 6.879 | Nutwood Ave | | | | 17.57 | | | 33.878135 | -117.880635 | 6.879 | Orange Frwy, Rte 57 | | Surface Street | Lane | Standard | Permit Work | | L T Lane 1 | 2 | N | | | N | | | N | | | N M22AA | 1 | 2025-01-15 10:22:25 | 1736965345 | 2025-01-21 09:01:23 | 1737478883 | 2025-01-21 14:01:23 | 1737496883 | N | Orange | Orange | 22 | WB | | | 9.73 | | | 33.77908 | -117.890873 | | The City Dr | | | | 9.07 | | | 33.776989 | -117.900003 | | Haster St | | Mainline | Lane | Standard | Drainage Work | 5 | HOV | 4 | N | | | N | | | N | | | N C1SA | 7 | 2025-01-13 08:27:26 | 1736785646 | 2025-01-21 09:01:24 | 1737478884 | 2025-01-21 15:30:24 | 1737502224 | N | Orange | Orange | 1 | NB | | | 29.89 | | | 33.728225 | -118.082819 | 22.58 | Warner Ave | Phillips St | | | 32.72 | | | 33.740818 | -118.095271 | 28.814 | Seal Beach Blvd | | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y P1BA | 2 | 2025-01-13 12:34:50 | 1736800490 | 2025-01-21 09:01:48 | 1737478908 | 2025-01-21 14:59:48 | 1737500388 | N | Orange | Orange | 1 | NB | | | 19.41 | | | 33.616967 | -117.917324 | 15.504 | Tustin Ave | | | | 19.41 | | | 33.617589 | -117.918868 | 15.504 | Tustin Ave | | Conventional Hwy | Lane | Standard | Permit Work | 5 | 3 | 3 | N | | | N | | | N | | | N P39GA | 19 | 2025-01-15 13:36:55 | 1736977015 | 2025-01-21 09:01:52 | 1737478912 | 2025-01-21 11:59:52 | 1737489592 | N | Orange | Orange | 39 | NB | | | 20.17 | | | 33.930897 | -117.967736 | 18.39 | La Habra Blvd | South of La Habra Blvd. (Phase 1) | | | 20.17 | | | 33.93185 | -117.967747 | 18.39 | La Habra Blvd | | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1 | 3 | N | | | N | | | N | | | N C1SA | 32 | 2025-01-13 08:31:56 | 1736785916 | 2025-01-21 09:01:55 | 1737478915 | 2025-01-21 15:30:55 | 1737502255 | N | Orange | Orange | 1 | SB | | | 25.72 | | | 33.665092 | -118.013153 | 21.814 | 10th st | 17th street | | | 24.72 | | | 33.656989 | -118.00192 | 28.814 | MAIN ST (DOWN TOWN) | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1LA | 7 | 2025-01-16 13:40:58 | 1737063658 | 2025-01-21 09:01:55 | 1737478915 | 2025-01-21 14:59:55 | 1737500395 | N | Orange | Orange | 1 | SB | | | 6.47 | | | 33.505337 | -117.746863 | 2.554 | Aliso Way | Bluff Dr. is where closure starts | | | 5.73 | | | 33.5049 | -117.746412 | 1.814 | 3RD AVE | Closure ends south of Bluff. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y C1SA | 22 | 2025-01-13 08:29:58 | 1736785798 | 2025-01-21 09:01:57 | 1737478917 | 2025-01-21 15:30:57 | 1737502257 | N | Orange | Orange | 1 | SB | | | 32.72 | | | 33.740761 | -118.095344 | 25.41 | Seal Beach Blvd | | | | 31.5 | | | 33.727877 | -118.082549 | 28.814 | Warner Ave | Phillips St | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y P39GA | 24 | 2025-01-15 13:46:19 | 1736977579 | 2025-01-21 12:01:17 | 1737489677 | 2025-01-21 14:59:17 | 1737500357 | N | Orange | Orange | 39 | SB | | | 20.17 | | | 33.934507 | -117.968052 | 18.39 | La Habra Blvd | North of La Habra Blvd. (Phase 2) | | | 20.17 | | | 33.931872 | -117.967966 | 18.39 | La Habra Blvd | South of La Habra Blvd. | Conventional Hwy | Lane | Standard | Permit Work | | 3, R T Lane 1 | 3 | N | | | N | | | N | | | N P1IA | 1 | 2024-12-30 09:52:00 | 1735581120 | 2025-01-21 13:01:00 | 1737493260 | 2025-01-21 22:59:00 | 1737529140 | N | Orange | Orange | 1 | NB | | | 24.72 | | | 33.657124 | -118.001823 | 20.814 | MAIN ST (DOWN TOWN) | | | | 24.72 | | | 33.657186 | -118.001963 | 20.814 | MAIN ST (DOWN TOWN) | | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1 | 3 | N | | | N | | | N | | | N P1IA | 2 | 2024-12-30 09:54:13 | 1735581253 | 2025-01-21 13:01:00 | 1737493260 | 2025-01-21 22:59:00 | 1737529140 | N | Orange | Orange | 1 | SB | | | 24.72 | | | 33.657564 | -118.002606 | 20.814 | MAIN ST (DOWN TOWN) | | | | 24.72 | | | 33.657186 | -118.001963 | 20.814 | MAIN ST (DOWN TOWN) | | Conventional Hwy | Lane | Standard | Permit Work | | L T Lane 1 | 3 | N | | | N | | | N | | | N C5IC | 13 | 2024-12-26 16:09:10 | 1735258150 | 2025-01-21 20:01:08 | 1737518468 | 2025-01-22 04:59:08 | 1737550748 | N | Orange | Orange | 5 | SB | | | 24.99 | | | 33.690068 | -117.768724 | | Jeffrey Rd | | | | 23.94 | | | 33.675839 | -117.756964 | | Sand Cyn Rd | | Mainline | Lane | Standard | Miscellaneous Work | | 5 | 5 | N | | | N | | | N | | | N C73XA | 28 | 2024-12-26 16:26:13 | 1735259173 | 2025-01-21 20:01:10 | 1737518470 | 2025-01-22 04:59:10 | 1737550750 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C5FC | 12 | 2025-01-14 12:37:41 | 1736887061 | 2025-01-21 20:01:39 | 1737518499 | 2025-01-22 05:59:39 | 1737554379 | N | Orange | Orange | 5 | NB | | | 17.47 | | | 33.604633 | -117.6904 | 89.513 | Alicia Pkwy | | | | 18.69 | | | 33.614705 | -117.707387 | 90.752 | El Toro Rd | | Mainline | Lane | Standard | Landscape Work | | 5, Auxiliary | 5 | N | | | N | | | N | | | N C73XA | 38 | 2024-12-26 16:28:44 | 1735259324 | 2025-01-21 20:01:41 | 1737518501 | 2025-01-22 04:59:41 | 1737550781 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C5LA | 4 | 2025-01-15 11:17:45 | 1736968665 | 2025-01-21 20:01:43 | 1737518503 | 2025-01-22 01:59:43 | 1737539983 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N C73XA | 54 | 2025-01-16 14:04:57 | 1737065097 | 2025-01-21 20:01:55 | 1737518515 | 2025-01-22 04:59:55 | 1737550795 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C73XA | 46 | 2025-01-16 14:03:59 | 1737065039 | 2025-01-21 20:01:56 | 1737518516 | 2025-01-22 04:59:56 | 1737550796 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C57BA | 1 | 2025-01-08 00:20:12 | 1736324412 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 57 | NB | | | 20.35 | | | 33.912975 | -117.883077 | 9.616 | Lambert Rd | 2000' South of Birch St UC | | | 20.35 | | | 33.919363 | -117.880331 | 9.616 | Lambert Rd | 500' North of Birch St UC | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | HOV, 1, 2 | 6 | N | | | N | | | N | | | N C57BA | 2 | 2024-12-16 15:14:00 | 1734390840 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 57 | SB | | | 20.35 | | | 33.924157 | -117.880288 | 9.616 | Lambert Rd | 2000' North of Birch St UC | | | 20.35 | | | 33.916247 | -117.881876 | 9.616 | Lambert Rd | 500' South of Birch St UC | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C55DA | 61 | 2025-01-15 17:01:34 | 1736989294 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | N/A | | | 7.85 | | WB | 33.708467 | -117.851332 | | Dyer Rd | | | | 7.85 | | | 33.708467 | -117.851332 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C55NA | 26 | 2025-01-14 14:20:36 | 1736893236 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | NB | | | 6.12 | | NB | 33.686378 | -117.864111 | | John Wayne Airport | | | | 6.12 | | NB | 33.686467 | -117.864154 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55NA | 30 | 2025-01-14 14:26:26 | 1736893586 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 65 | 2025-01-15 17:01:45 | 1736989305 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | N/A | | | 7.85 | | EB | 33.708668 | -117.85086 | | Dyer Rd | | | | 7.85 | | | 33.708668 | -117.85086 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C55NA | 38 | 2025-01-16 14:56:02 | 1737068162 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | SB | | | 5.32 | | | 33.679784 | -117.879634 | | Baker St | | | | 4.02 | | | 33.665955 | -117.895056 | | Mesa Dr | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 17 | 2025-01-08 15:51:24 | 1736380284 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | SB | | | 9.44 | | SB | 33.727599 | -117.834878 | | Costa Mesa Frwy, Rte 55 | | | | 9.44 | | SB | 33.727492 | -117.834856 | | Edinger Ave | | Off Ramp | Full | Standard | Sign Work | | All | 2 | N | | | N | | | N | | | N C405IC | 2 | 2025-01-16 17:18:52 | 1737076732 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 73 | 2025-01-16 13:24:41 | 1737062681 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | N/A | | | 7.85 | | SB | 33.709078 | -117.85211 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.709078 | -117.85211 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C55DA | 69 | 2025-01-16 13:24:27 | 1737062667 | 2025-01-21 21:01:00 | 1737522060 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | N/A | | | 7.85 | | NB | 33.70902 | -117.852051 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.70902 | -117.852051 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C73XA | 58 | 2025-01-16 14:07:03 | 1737065223 | 2025-01-21 21:01:01 | 1737522061 | 2025-01-22 03:59:01 | 1737547141 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C73XA | 24 | 2024-12-26 16:26:05 | 1735259165 | 2025-01-21 21:01:02 | 1737522062 | 2025-01-22 04:59:02 | 1737550742 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55DA | 76 | 2025-01-17 15:24:06 | 1737156246 | 2025-01-21 21:01:03 | 1737522063 | 2025-01-22 04:59:03 | 1737550743 | N | Orange | Orange | 55 | N/A | | | 9.44 | | SB | 33.716885 | -117.844043 | | Edinger Ave | Ritchey ST | | | 9.44 | | | 33.716885 | -117.844043 | | Costa Mesa Frwy, Rte 55 | From N of wright st to S of Edinger Ave | Surface Street | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C55DA | 49 | 2025-01-15 16:58:07 | 1736989087 | 2025-01-21 21:01:04 | 1737522064 | 2025-01-22 04:59:04 | 1737550744 | N | Orange | Orange | 55 | SB | | | 6.99 | | SB | 33.699652 | -117.863456 | | Macarthur Blvd | | | | 6.99 | | SB | 33.699652 | -117.863456 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C73XA | 3 | 2024-12-26 13:54:06 | 1735250046 | 2025-01-21 21:01:04 | 1737522064 | 2025-01-22 04:59:04 | 1737550744 | N | Orange | Orange | 73 | SB | | | 26.5 | | SB | 33.679925 | -117.880395 | | Baker St | | | | 26.5 | | SB | 33.679916 | -117.880411 | | RTE. 73 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55DA | 57 | 2025-01-15 17:00:13 | 1736989213 | 2025-01-21 21:01:10 | 1737522070 | 2025-01-22 04:59:10 | 1737550750 | N | Orange | Orange | 55 | NB | | | 6.99 | | WB | 33.697575 | -117.859759 | | Macarthur Blvd | Macarthur Blvd NB on ramp (MA4Line) | | | 6.99 | | NB | 33.697535 | -117.859727 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C73XA | 50 | 2025-01-16 14:04:14 | 1737065054 | 2025-01-21 21:01:11 | 1737522071 | 2025-01-22 03:59:11 | 1737547151 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 53 | 2025-01-15 16:59:18 | 1736989158 | 2025-01-21 21:01:15 | 1737522075 | 2025-01-22 04:59:15 | 1737550755 | N | Orange | Orange | 55 | NB | | | 6.99 | | EB | 33.698204 | -117.861068 | | Macarthur Blvd | Macarthur Blvd NB Loop on ramp (MA5 Line) | | | 6.99 | | NB | 33.698204 | -117.861133 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55NA | 13 | 2024-12-26 14:30:19 | 1735252219 | 2025-01-21 21:01:17 | 1737522077 | 2025-01-22 04:59:17 | 1737550757 | N | Orange | Orange | 55 | SB | | | 4.74 | | SB | 33.6778 | -117.881528 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | SB | 33.67355 | -117.886206 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 35 | 2025-01-14 15:12:20 | 1736896340 | 2025-01-21 21:01:17 | 1737522077 | 2025-01-22 04:59:17 | 1737550757 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55NA | 18 | 2024-12-26 15:30:20 | 1735255820 | 2025-01-21 21:01:18 | 1737522078 | 2025-01-22 04:59:18 | 1737550758 | N | Orange | Orange | 55 | NB | | | 10.98 | | NB | 33.741007 | -117.833684 | 10.792 | Costa Mesa Frwy, Rte 55 | | | | 10.98 | | NB | 33.741007 | -117.833692 | 95.252 | Fourth St/ Irvine Blvd | | Off Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55DA | 23 | 2025-01-14 15:05:22 | 1736895922 | 2025-01-21 21:01:19 | 1737522079 | 2025-01-22 04:59:19 | 1737550759 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C405MA | 6 | 2025-01-14 13:54:21 | 1736891661 | 2025-01-21 21:01:19 | 1737522079 | 2025-01-22 04:59:19 | 1737550759 | N | Orange | Orange | 405 | NB | | | 8.74 | | NB | 33.686947 | -117.865954 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | SB | 33.686912 | -117.865938 | 8.51 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C133ZA | 3 | 2025-01-14 13:56:23 | 1736891783 | 2025-01-21 21:01:20 | 1737522080 | 2025-01-22 04:59:20 | 1737550760 | N | Orange | Orange | 133 | SB | | | 9.565 | | SB | 33.680719 | -117.749618 | 9.579 | Laguna Cyn Frwy, Rte 133 | | | | 9.565 | | NB | 33.680717 | -117.749615 | 9.579 | Santa Ana Frwy, Rte 5 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 79 | 2025-01-17 15:25:27 | 1737156327 | 2025-01-21 21:01:25 | 1737522085 | 2025-01-22 04:59:25 | 1737550765 | N | Orange | Orange | 55 | N/A | | | 6.99 | | EB | 33.698013 | -117.860472 | | Macarthur Blvd | | | | 6.99 | | | 33.698013 | -117.860472 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C405CA | 52 | 2025-01-13 20:18:26 | 1736828306 | 2025-01-21 21:01:26 | 1737522086 | 2025-01-22 04:59:26 | 1737550766 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 4, 5, RShoulder | 5 | N | | | N | | | N | | | N C73XA | 13 | 2024-12-26 14:56:28 | 1735253788 | 2025-01-21 21:01:26 | 1737522086 | 2025-01-22 04:59:26 | 1737550766 | N | Orange | Orange | 73 | NB | | | 26.581 | | NB | 33.670641 | -117.883362 | | RTE. 73 | | | | 26.581 | | SB | 33.670573 | -117.883338 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405MA | 2 | 2025-01-14 12:57:30 | 1736888250 | 2025-01-21 21:01:28 | 1737522088 | 2025-01-22 04:59:28 | 1737550768 | N | Orange | Orange | 405 | SB | | | 8.74 | | SB | 33.687112 | -117.879621 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.687085 | -117.879573 | 8.51 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5IC | 8 | 2024-12-26 15:35:33 | 1735256133 | 2025-01-21 21:01:30 | 1737522090 | 2025-01-22 04:59:30 | 1737550770 | N | Orange | Orange | 5 | NB | | | 30.28 | | NB | 33.739449 | -117.829518 | 102.335 | Santa Ana Fwy, Freeway I-5 | | | | 30.28 | | NB | 33.739369 | -117.829459 | 95.252 | Route 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 34 | 2024-12-26 16:28:35 | 1735259315 | 2025-01-21 21:01:33 | 1737522093 | 2025-01-22 04:59:33 | 1737550773 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55DA | 13 | 2025-01-08 15:50:36 | 1736380236 | 2025-01-21 21:01:34 | 1737522094 | 2025-01-22 04:59:34 | 1737550774 | N | Orange | Orange | 55 | SB | | | 9.96 | | SB | 33.730323 | -117.834116 | | Mcfadden St | | | | 9.96 | | SB | 33.730323 | -117.834116 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Concrete Pour | | All | 2 | N | | | N | | | N | | | N C55NA | 8 | 2024-12-26 14:25:41 | 1735251941 | 2025-01-21 21:01:39 | 1737522099 | 2025-01-22 04:59:39 | 1737550779 | N | Orange | Orange | 55 | NB | | | 4.74 | | NB | 33.67044 | -117.889523 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | NB | 33.670387 | -117.889553 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 8 | 2024-12-26 14:27:44 | 1735252064 | 2025-01-21 21:01:41 | 1737522101 | 2025-01-22 04:59:41 | 1737550781 | N | Orange | Orange | 73 | NB | | | 9.44 | | NB | 33.670498 | -117.889478 | | RTE. 73 | | | | 9.44 | | NB | 33.670481 | -117.889456 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405MA | 10 | 2025-01-14 14:18:45 | 1736893125 | 2025-01-21 21:01:42 | 1737522102 | 2025-01-22 04:59:42 | 1737550782 | N | Orange | Orange | 405 | NB | | | 8.74 | | NB | 33.686966 | -117.865938 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.686946 | -117.865905 | 9.579 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55NA | 3 | 2024-12-26 14:11:45 | 1735251105 | 2025-01-21 21:01:43 | 1737522103 | 2025-01-22 04:59:43 | 1737550783 | N | Orange | Orange | 55 | NB | | | 4.737 | | NB | 33.66815 | -117.892307 | 0 | Costa Mesa Frwy, Rte 55 | | | | 4.737 | | SB | 33.668114 | -117.892308 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5IC | 3 | 2024-12-26 15:09:50 | 1735254590 | 2025-01-21 21:01:48 | 1737522108 | 2025-01-22 04:59:48 | 1737550788 | N | Orange | Orange | 5 | SB | | | 23.19 | | SB | 33.680593 | -117.749709 | 95.189 | Santa Ana Fwy, Freeway I-5 | | | | 23.19 | | NB | 33.68057 | -117.749716 | 95.252 | Route 133 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 82 | 2025-01-17 15:26:52 | 1737156412 | 2025-01-21 21:01:49 | 1737522109 | 2025-01-22 04:59:49 | 1737550789 | N | Orange | Orange | 55 | NB | | | 6.99 | | NB | 33.695964 | -117.863695 | | Costa Mesa Frwy, Rte 55 | | | | 6.99 | | NB | 33.695852 | -117.863721 | | Macarthur Blvd | | Off Ramp | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C405CA | 40 | 2025-01-13 20:16:51 | 1736828211 | 2025-01-21 21:01:51 | 1737522111 | 2025-01-22 05:59:51 | 1737554391 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | RShoulder, 4 | 4 | N | | | N | | | N | | | N C405CA | 28 | 2025-01-13 20:13:52 | 1736828032 | 2025-01-21 21:01:51 | 1737522111 | 2025-01-22 04:59:51 | 1737550791 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV | 4 | N | | | N | | | N | | | N C5IC | 21 | 2025-01-16 17:28:58 | 1737077338 | 2025-01-21 21:01:55 | 1737522115 | 2025-01-22 04:59:55 | 1737550795 | N | Orange | Orange | 5 | NB | | | 21.304 | | NB | 33.638633 | -117.729853 | 93.303 | Santa Ana Fwy, Freeway I-5 | | | | 21.304 | | NB | 33.638615 | -117.729837 | 93.366 | 405/5 JCT | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 18 | 2024-12-26 15:00:01 | 1735254001 | 2025-01-21 21:01:59 | 1737522119 | 2025-01-22 04:59:59 | 1737550799 | N | Orange | Orange | 73 | SB | | | 26.581 | | SB | 33.668498 | -117.881491 | | RTE. 73 | | | | 26.581 | | SB | 33.668409 | -117.881469 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C57MA | 8 | 2025-01-02 18:57:07 | 1735873027 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 57 | SB | | | 19.86 | | EB | 33.911135 | -117.886347 | 9.211 | Imperial Hwy, Hwy 90 | | | | 19.86 | | SB | 33.908491 | -117.88291 | 9.126 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C90FA | 8 | 2025-01-02 19:01:36 | 1735873296 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 90 | EB | | | 6.58 | | | 33.910889 | -117.869691 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.910987 | -117.862862 | 9.126 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C22HA | 3 | 2025-01-08 12:31:40 | 1736368300 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 22 | WB | | R | 12.88 | | | 33.777267 | -117.836312 | 14.451 | Tustin Ave | | | R | 11.83 | | | 33.775412 | -117.84986 | 13.391 | Glassell St / Grand aver | | Mainline | Lane | Standard | Highway Construction | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C22HA | 4 | 2025-01-08 12:32:13 | 1736368333 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 22 | WB | | R | 12.88 | | WB | 33.777726 | -117.83593 | 14.451 | Tustin Ave | | | R | 11.83 | | WB | 33.776737 | -117.840448 | 13.391 | Garden Grove Fwy, Rte. 22 | | On Ramp | Full | Standard | Highway Construction | | All | 2 | N | | | N | | | N | | | N C55NA | 34 | 2025-01-14 14:26:38 | 1736893598 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C90FA | 13 | 2025-01-02 19:05:35 | 1735873535 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 90 | WB | | | 6.58 | | | 33.911212 | -117.858815 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911143 | -117.864477 | 9.126 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C90FA | 18 | 2025-01-02 19:09:50 | 1735873790 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 90 | WB | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C90FA | 23 | 2025-01-02 19:15:59 | 1735874159 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 90 | N/A | | | 6.58 | | NB | 33.911537 | -117.863663 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911537 | -117.863663 | 9.402 | Imperial Hwy, Rte. 90 | | Surface Street | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, RShoulder, Sidewalk | 2 | N | | | N | | | N | | | N C405IC | 6 | 2025-01-16 17:19:02 | 1737076742 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C5LA | 41 | 2025-01-16 15:10:20 | 1737069020 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 05:59:00 | 1737554340 | N | Orange | Orange | 5 | NB | | | 12.49 | | | 33.537452 | -117.67447 | 84.501 | RTE. 73 | | | | 13.78 | | | 33.55926 | -117.673002 | 85.842 | Crown Valley Pkwy | | Mainline | Lane | Standard | Sign Work | | 4 | 4 | N | | | N | | | N | | | N C91WA | 4 | 2025-01-10 14:07:14 | 1736546834 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 91 | EB | | R | .848 | | NB | 33.855799 | -118.028491 | 15.587 | Valley View St | | | R | .848 | | EB | 33.855853 | -118.025959 | 16.581 | Artesia Frwy, Rte 91 | | On Ramp | Full | Standard | Sign Work | | All | 1 | N | | | N | | | N | | | N C91WA | 5 | 2025-01-10 14:11:34 | 1736547094 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 91 | EB | | R | .848 | | SB | 33.856138 | -118.028469 | 15.587 | Valley View St | | | R | .848 | | EB | 33.855866 | -118.025894 | 16.581 | Artesia Frwy, Rte 91 | | On Ramp | Full | Standard | Sign Work | | All | 1 | N | | | N | | | N | | | N C91WA | 17 | 2025-01-10 14:30:18 | 1736548218 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 91 | EB | | R | .848 | | | 33.856519 | -118.028443 | 15.587 | Valley View St | | | R | 1.842 | | | 33.855892 | -118.01147 | 16.581 | Knott Ave | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 4 | 4 | N | | | N | | | N | | | N C57MA | 3 | 2025-01-02 18:46:45 | 1735872405 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C90FA | 3 | 2025-01-02 18:51:51 | 1735872711 | 2025-01-21 22:01:00 | 1737525660 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 90 | EB | | | 5.19 | | | 33.911731 | -117.887813 | 8.014 | State College Blvd | | | | 5.331 | | | 33.910978 | -117.885507 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C1JA | 12 | 2025-01-14 13:19:08 | 1736889548 | 2025-01-21 22:01:06 | 1737525666 | 2025-01-22 04:59:06 | 1737550746 | N | Orange | Orange | 1 | NB | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 10.16 | | | 33.547267 | -117.796819 | 6.244 | Wave St | Ledroit St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C5LA | 24 | 2025-01-15 11:24:09 | 1736969049 | 2025-01-21 22:01:07 | 1737525667 | 2025-01-22 05:59:07 | 1737554347 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.76 | Crown Valley Pkwy | | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.842 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C405CA | 44 | 2025-01-13 20:17:10 | 1736828230 | 2025-01-21 22:01:09 | 1737525669 | 2025-01-22 04:59:09 | 1737550749 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C405CA | 32 | 2025-01-13 20:14:10 | 1736828050 | 2025-01-21 22:01:10 | 1737525670 | 2025-01-22 04:59:10 | 1737550750 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N P5FA | 6 | 2025-01-14 07:25:20 | 1736868320 | 2025-01-21 22:01:18 | 1737525678 | 2025-01-22 04:59:18 | 1737550758 | N | Orange | Orange | 5 | N/A | | | 23.94 | | SB | 33.678752 | -117.75716 | | Sand Cyn Rd | | | | 23.94 | | | 33.678752 | -117.75716 | | Santa Ana Fwy, Freeway I-5 | | Surface Street | Lane | Standard | Permit Work | 5 | L T Lane 1 | 3 | N | | | N | | | N | | | N P57EA | 3 | 2025-01-13 16:55:22 | 1736816122 | 2025-01-21 22:01:19 | 1737525679 | 2025-01-22 04:59:19 | 1737550759 | N | Orange | Orange | 57 | N/A | | | 12.54 | | EB | 33.805764 | -117.883051 | 1.849 | Katella Ave | East of Howell Ave. (Stage 1F) | | | 12.54 | | | 33.805764 | -117.883051 | 1.806 | Orange Frwy, Rte 57 | East of Douglass Rd. | Surface Street | Lane | Standard | Permit Work | | 1, 2 | 3 | N | | | N | | | N | | | N C5LA | 32 | 2025-01-15 11:28:27 | 1736969307 | 2025-01-21 22:01:25 | 1737525685 | 2025-01-22 05:59:25 | 1737554365 | N | Orange | Orange | 5 | SB | | | 12.94 | | SB | 33.547257 | -117.673473 | 84.92 | Avery Pkwy | | | | 12.94 | | SB | 33.547257 | -117.673473 | 85.002 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C55DA | 39 | 2025-01-14 15:12:31 | 1736896351 | 2025-01-21 22:01:28 | 1737525688 | 2025-01-22 03:59:28 | 1737547168 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y P5FA | 2 | 2025-01-14 07:24:29 | 1736868269 | 2025-01-21 22:01:28 | 1737525688 | 2025-01-22 04:59:28 | 1737550768 | N | Orange | Orange | 5 | N/A | | | 23.94 | | NB | 33.676518 | -117.759594 | | Sand Cyn Rd | | | | 23.94 | | | 33.676518 | -117.759594 | | Santa Ana Fwy, Freeway I-5 | | Surface Street | Lane | Standard | Permit Work | 5 | 3 | 3 | N | | | N | | | N | | | N P5FA | 10 | 2025-01-14 07:28:31 | 1736868511 | 2025-01-21 22:01:30 | 1737525690 | 2025-01-22 04:59:30 | 1737550770 | N | Orange | Orange | 5 | SB | | | 23.94 | | SB | 33.67841 | -117.759519 | | Santa Ana Fwy, Freeway I-5 | | | | 23.94 | | | 33.677727 | -117.758033 | | Sand Cyn Rd | | Off Ramp | Lane | Standard | Permit Work | 5 | L T Lane 2, R T Lane 2 | 1 | N | | | N | | | N | | | N C55DA | 27 | 2025-01-14 15:05:38 | 1736895938 | 2025-01-21 22:01:36 | 1737525696 | 2025-01-22 03:59:36 | 1737547176 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C1JA | 16 | 2025-01-14 13:19:41 | 1736889581 | 2025-01-21 22:01:39 | 1737525699 | 2025-01-22 04:59:39 | 1737550779 | N | Orange | Orange | 1 | NB | | | 8.21 | | | 33.529474 | -117.772042 | 4.294 | Agate St | Ruby St | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 34 | 2025-01-14 13:22:45 | 1736889765 | 2025-01-21 22:01:43 | 1737525703 | 2025-01-22 07:59:43 | 1737561583 | N | Orange | Orange | 1 | SB | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 8.21 | | | 33.529402 | -117.772121 | 4.294 | Agate St | Ruby St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C405CA | 56 | 2025-01-13 20:18:45 | 1736828325 | 2025-01-21 22:01:44 | 1737525704 | 2025-01-22 04:59:44 | 1737550784 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 3, 4, 5, RShoulder | 5 | N | | | N | | | N | | | Y C57AA | 1 | 2025-01-13 12:07:47 | 1736798867 | 2025-01-21 22:01:45 | 1737525705 | 2025-01-22 04:59:45 | 1737550785 | N | Orange | Orange | 57 | SB | | R | 22.55 | | | 33.945989 | -117.868735 | 11.901 | ORANGE-LA CO LINE | | | | 11.24 | | | 33.787909 | -117.880101 | .591 | Chapman Ave ( city of orange ) | | Mainline | Lane | Standard | Striping Operation | | HOV, 1, 2, 3 | 5 | N | | | N | | | N | | | Y C1JA | 20 | 2025-01-14 13:20:50 | 1736889650 | 2025-01-21 22:01:48 | 1737525708 | 2025-01-22 07:59:48 | 1737561588 | N | Orange | Orange | 1 | SB | | | 10.16 | | | 33.54718 | -117.796847 | 6.244 | Wave St | Ledroit St | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C57TA | 19 | 2025-01-13 13:23:52 | 1736803432 | 2025-01-21 22:01:50 | 1737525710 | 2025-01-22 04:59:50 | 1737550790 | N | Orange | Orange | 57 | SB | | | 21.78 | | NB/SB | 33.942971 | -117.873421 | 11.131 | Tonner Cyn Rd / BREA CYN | Loc 27 Off Ramp Brea Canyon | | | 21.78 | | SB | 33.940862 | -117.875589 | 4.866 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Bridge Work | | All | 1 | N | | | N | | | N | | | N C91WA | 18 | 2025-01-10 14:30:40 | 1736548240 | 2025-01-21 23:01:00 | 1737529260 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 91 | EB | | R | .848 | | | 33.856519 | -118.028443 | 15.587 | Valley View St | | | R | 1.842 | | | 33.855892 | -118.01147 | 16.581 | Knott Ave | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 3, 4 | 4 | N | | | N | | | N | | | Y C5MA | 2 | 2025-01-06 12:13:03 | 1736194383 | 2025-01-21 23:01:01 | 1737529261 | 2025-01-22 04:59:01 | 1737550741 | N | Orange | Orange | 5 | NB | | | 28.25 | | NB | 33.725239 | -117.802745 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5MA | 12 | 2025-01-06 12:19:09 | 1736194749 | 2025-01-21 23:01:07 | 1737529267 | 2025-01-22 04:59:07 | 1737550747 | N | Orange | Orange | 5 | SB | | | 29.61 | | SB | 33.741509 | -117.836571 | 101.602 | Santa Ana Fwy, Freeway I-5 | | | | 29.61 | | | 33.73749 | -117.825956 | 101.602 | Newport Ave | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5FC | 28 | 2025-01-14 12:41:20 | 1736887280 | 2025-01-21 23:01:18 | 1737529278 | 2025-01-22 04:59:18 | 1737550758 | N | Orange | Orange | 5 | NB | | | 17.47 | | WB | 33.606284 | -117.690224 | 89.513 | Alicia Pkwy | AP-6 - WB Alicia Pkwy to NB I-5 Fwy | | | 17.47 | | NB | 33.606677 | -117.693571 | 90.752 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | N C405CA | 36 | 2025-01-13 20:14:24 | 1736828064 | 2025-01-21 23:01:23 | 1737529283 | 2025-01-22 03:59:23 | 1737547163 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C405CA | 48 | 2025-01-13 20:17:25 | 1736828245 | 2025-01-21 23:01:25 | 1737529285 | 2025-01-22 03:59:25 | 1737547165 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C5FC | 24 | 2025-01-14 12:40:36 | 1736887236 | 2025-01-21 23:01:33 | 1737529293 | 2025-01-22 04:59:33 | 1737550773 | N | Orange | Orange | 5 | NB | | | 17.47 | | EB | 33.605205 | -117.690153 | 89.513 | Alicia Pkwy | AP-5: EB Alicia Pkwy to NB I-5 On Ramp | | | 17.47 | | NB | 33.604642 | -117.690389 | 90.752 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | N C55DA | 43 | 2025-01-14 15:12:44 | 1736896364 | 2025-01-21 23:01:42 | 1737529302 | 2025-01-22 02:59:42 | 1737543582 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C405CA | 67 | 2025-01-13 20:26:45 | 1736828805 | 2025-01-21 23:01:44 | 1737529304 | 2025-01-22 04:59:44 | 1737550784 | N | Orange | Orange | 405 | NB | | | 5.62 | | SB | 33.671023 | -117.821426 | 5.39 | Culver Dr | cu3 | | | 5.62 | | NB | 33.670646 | -117.825486 | 5.39 | San Diego Frwy, Rte 405 | | On Ramp | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | N C55DA | 31 | 2025-01-14 15:05:55 | 1736895955 | 2025-01-21 23:01:53 | 1737529313 | 2025-01-22 02:59:53 | 1737543593 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C5LA | 8 | 2025-01-15 11:17:56 | 1736968676 | 2025-01-21 23:01:54 | 1737529314 | 2025-01-22 01:59:54 | 1737539994 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C5FC | 20 | 2025-01-14 12:39:57 | 1736887197 | 2025-01-21 23:01:55 | 1737529315 | 2025-01-22 04:59:55 | 1737550795 | N | Orange | Orange | 5 | NB | | | 17.47 | | NB | 33.602551 | -117.68657 | 89.513 | Santa Ana Fwy, Freeway I-5 | AP-4 NB I-5 to Alicia Pkwy Off Ramp | | | 17.47 | | NB | 33.604633 | -117.6904 | 90.752 | Alicia Pkwy | | Off Ramp | Full | Standard | Pavement Repair | | All | 1 | N | | | N | | | N | | | N C5MA | 7 | 2025-01-06 12:15:58 | 1736194558 | 2025-01-21 23:01:56 | 1737529316 | 2025-01-22 04:59:56 | 1737550796 | N | Orange | Orange | 5 | SB | | | 28.25 | | SB | 33.7283 | -117.808281 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5FC | 16 | 2025-01-14 12:38:00 | 1736887080 | 2025-01-21 23:01:58 | 1737529318 | 2025-01-22 04:59:58 | 1737550798 | N | Orange | Orange | 5 | NB | | | 17.47 | | | 33.604633 | -117.6904 | 89.513 | Alicia Pkwy | | | | 18.69 | | | 33.614705 | -117.707387 | 90.752 | El Toro Rd | | Mainline | Lane | Standard | Landscape Work | | 4, 5, Auxiliary | 5 | N | | | N | | | N | | | N C405CA | 64 | 2025-01-13 20:26:00 | 1736828760 | 2025-01-21 23:01:59 | 1737529319 | 2025-01-22 04:59:59 | 1737550799 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.659473 | -117.776333 | 2.65 | Sand Canyon Ave | scd3 | | | 2.88 | | NB | 33.659578 | -117.780573 | 2.65 | San Diego Frwy, Rte 405 | | On Ramp | Full | Standard | Electrical Work | | All | 2 | N | | | N | | | N | | | N C405CA | 60 | 2025-01-13 20:22:52 | 1736828572 | 2025-01-21 23:59:00 | 1737532740 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 405 | NB | | | 1.8 | | NB | 33.651661 | -117.759306 | 1.57 | San Diego Frwy, Rte 405 | | | | 1.8 | | SB | 33.651866 | -117.761055 | 1.57 | Laguna Frwy, Rte 133 | c4 | Connector | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | Y C55NA | 22 | 2025-01-14 13:58:29 | 1736891909 | 2025-01-21 23:59:00 | 1737532740 | 2025-01-22 04:59:00 | 1737550740 | N | Orange | Orange | 55 | NB | | | 5.99 | | NB | 33.682922 | -117.876241 | | Costa Mesa Frwy, Rte 55 | | | | 5.99 | | SB | 33.682924 | -117.876229 | 9.579 | San Diego Frwy, Rte 405 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405EA | 6 | 2025-01-13 11:18:12 | 1736795892 | 2025-01-21 23:59:10 | 1737532750 | 2025-01-22 04:59:10 | 1737550750 | N | Orange | Orange | 405 | NB | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y C405EA | 3 | 2025-01-13 11:17:22 | 1736795842 | 2025-01-21 23:59:20 | 1737532760 | 2025-01-22 04:59:20 | 1737550760 | N | Orange | Orange | 405 | SB | | | 23.98 | | SB | 33.787777 | -118.095965 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.789498 | -118.088734 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y C91WA | 19 | 2025-01-10 14:31:22 | 1736548282 | 2025-01-22 00:01:00 | 1737532860 | 2025-01-22 03:59:00 | 1737547140 | N | Orange | Orange | 91 | EB | | R | .848 | | | 33.856519 | -118.028443 | 15.587 | Valley View St | | | R | 1.842 | | | 33.855892 | -118.01147 | 16.581 | Knott Ave | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C5LA | 28 | 2025-01-15 11:24:48 | 1736969088 | 2025-01-22 02:01:00 | 1737540060 | 2025-01-22 05:59:00 | 1737554340 | N | Orange | Orange | 5 | SB | | | 12.94 | | SB | 33.55031 | -117.67299 | 84.92 | Santa Ana Fwy, Freeway I-5 | | | | 12.94 | | SB | 33.55031 | -117.67299 | 85.842 | Avery Pkwy | | Off Ramp | Full | Standard | Striping Operation | | All | 4 | N | | | N | | | N | | | N C5LA | 36 | 2025-01-15 11:29:15 | 1736969355 | 2025-01-22 02:01:13 | 1737540073 | 2025-01-22 05:59:13 | 1737554353 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.791 | Santa Ana Fwy, Freeway I-5 | | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.002 | Crown Valley Pkwy | | Off Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C5LA | 13 | 2025-01-15 11:18:48 | 1736968728 | 2025-01-22 02:01:46 | 1737540106 | 2025-01-22 04:59:46 | 1737550786 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C57TA | 9 | 2025-01-13 13:19:51 | 1736803191 | 2025-01-22 02:01:48 | 1737540108 | 2025-01-22 04:59:48 | 1737550788 | N | Orange | Orange | 57 | SB | | | 19.86 | | | 33.908607 | -117.882794 | 9.211 | Imperial Hwy, Hwy 90 | Loc 23-24 SB | | | 18.34 | | | 33.901244 | -117.880963 | 4.866 | Yorba linda Blvd | | Mainline | Lane | Standard | Bridge Work | | HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C5LA | 18 | 2025-01-15 11:19:00 | 1736968740 | 2025-01-22 02:01:58 | 1737540118 | 2025-01-22 05:59:58 | 1737554398 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C1JA | 30 | 2025-01-14 13:22:02 | 1736889722 | 2025-01-22 08:01:00 | 1737561660 | 2025-01-22 14:59:00 | 1737586740 | N | Orange | Orange | 1 | SB | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 8.21 | | | 33.529402 | -117.772121 | 4.294 | Agate St | Ruby St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 25 | 2025-01-14 13:21:31 | 1736889691 | 2025-01-22 08:01:29 | 1737561689 | 2025-01-22 14:59:29 | 1737586769 | N | Orange | Orange | 1 | SB | | | 10.16 | | | 33.54718 | -117.796847 | 6.244 | Wave St | Ledroit St | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 8 | 2025-01-14 13:16:42 | 1736889402 | 2025-01-22 08:01:39 | 1737561699 | 2025-01-22 14:59:39 | 1737586779 | N | Orange | Orange | 1 | NB | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 10.16 | | | 33.547267 | -117.796819 | 6.244 | Wave St | Ledroit St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | N | | | N | | | N | | | Y C39EA | 3 | 2025-01-13 13:44:56 | 1736804696 | 2025-01-22 08:30:00 | 1737563400 | 2025-01-22 15:30:00 | 1737588600 | N | Orange | Orange | 39 | NB | | | 11.18 | | | 33.810162 | -117.993112 | 11.18 | Cerritos Ave | | | | 11.68 | | | 33.817432 | -117.993184 | 11.68 | Ball Rd | | Conventional Hwy | Lane | Standard | Utility Work | | 1, 2 | 4 | N | | | N | | | N | | | Y C90FA | 28 | 2025-01-13 04:39:16 | 1736771956 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:59:00 | 1737586740 | N | Orange | Orange | 90 | EB | | | 5.331 | | | 33.911032 | -117.885496 | | State College Blvd | | | | 5.331 | | | 33.910988 | -117.885464 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Striping Operation | 1 | 1, 2, 3 | 3 | N | | | N | | | N | | | Y M57NA | 4 | 2025-01-14 20:05:38 | 1736913938 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 13:30:00 | 1737581400 | N | Orange | Orange | 57 | SB | | | 16.39 | | | 33.861116 | -117.877239 | 5.741 | Orangethorpe Ave | | | | 12.54 | | | 33.805881 | -117.880276 | 1.891 | Katella Ave | | Mainline | Moving | Standard | Sweeping Operation | | HOV | 5 | N | | | N | | | N | | | N M91EA | 2 | 2025-01-16 12:24:29 | 1737059069 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:30:00 | 1737585000 | N | Orange | Orange | 91 | WB | | | 5.258 | | | 33.854311 | -117.889555 | 23.671 | State College Blvd | | | R | .01 | | | 33.862114 | -118.041767 | 14.749 | Rte 91 - L.A./OC. County Line | | Mainline | Moving | Standard | Sweeping Operation | | Median, LShoulder, HOV | 4 | N | | | N | | | N | | | N M142HA | 1 | 2025-01-15 10:02:11 | 1736964131 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:01:00 | 1737583260 | N | Orange | Orange | 142 | N/A | | | 4.313 | | NB/SB | 33.925762 | -117.805407 | 3.713 | Ruby st | | | | 4.313 | | | 33.925762 | -117.805407 | 3.713 | Carbon Canyon Rd. - Rte. 142 | | Surface Street | One-Way Traffic | Standard | Drainage Work | | 1 | 1 | N | | | N | | | N | | | Y C1LA | 13 | 2025-01-16 14:10:06 | 1737065406 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:59:00 | 1737586740 | N | Orange | Orange | 1 | SB | | | 5.73 | | | 33.500948 | -117.743359 | 1.814 | 3RD AVE | Closure starts at 5th Ave. | | | 5.5 | | | 33.4994 | -117.741967 | 1.584 | 7th Ave / Circle Dr | Closure ends at 7th Ave. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y C90FA | 33 | 2025-01-13 19:22:31 | 1736824951 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:59:00 | 1737586740 | N | Orange | Orange | 90 | WB | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3 | 3 | N | | | N | | | N | | | Y M91PA | 1 | 2025-01-02 09:30:56 | 1735839056 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 13:30:00 | 1737581400 | N | Orange | Orange | 91 | EB | | | 5.258 | | | 33.854184 | -117.88965 | 23.631 | State College Blvd | | | | 8.812 | | | 33.847323 | -117.832319 | 27.185 | Riverdale ave | | Mainline | Moving | Standard | Sweeping Operation | | HOV | 3 | N | | | N | | | N | | | N C1SA | 18 | 2025-01-13 08:29:04 | 1736785744 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 15:30:00 | 1737588600 | N | Orange | Orange | 1 | SB | | | 18.07 | | | 33.616223 | -117.902259 | | Bayside Dr | | | | 17.43 | | | 33.613221 | -117.894152 | 28.814 | Jamboree Rd | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N M55BA | 1 | 2025-01-14 09:17:42 | 1736875062 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:01:00 | 1737583260 | N | Orange | Orange | 55 | SB | | | 11.79 | | | 33.759867 | -117.831198 | 11.602 | 17th St | | | | 11.79 | | SB | 33.759867 | -117.831198 | 11.602 | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Graffity Removal | 5 | All | 2 | N | | | N | | | N | | | N C90FA | 38 | 2025-01-13 19:29:27 | 1736825367 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:59:00 | 1737586740 | N | Orange | Orange | 90 | EB | | | 6.58 | | | 33.910889 | -117.869691 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.910987 | -117.862862 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, 1, 2, 3 | 3 | N | | | N | | | N | | | Y P22CA | 1 | 2025-01-15 08:57:18 | 1736960238 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:59:00 | 1737586740 | N | Orange | Orange | 22 | N/A | | | 4.81 | | WB | 33.76678 | -117.972673 | | Trask Ave | West of Magnolia St. | | | 4.81 | | | 33.76678 | -117.972673 | | Garden Grove Fwy, Rte. 22 | SR-22 Overpass | Surface Street | Lane | Standard | Permit Work | | 2 | 2 | N | | | N | | | N | | | N C1SA | 3 | 2025-01-13 08:26:48 | 1736785608 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 13:59:00 | 1737583140 | N | Orange | Orange | 1 | NB | | | 17.43 | | | 33.613139 | -117.891514 | | Jamboree Rd | | | | 18.07 | | | 33.616186 | -117.908206 | | Bayside Dr | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N C57MA | 18 | 2025-01-13 19:33:07 | 1736825587 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:59:00 | 1737586740 | N | Orange | Orange | 57 | SB | | | 19.86 | | EB | 33.911135 | -117.886347 | 9.211 | Imperial Hwy, Hwy 90 | | | | 19.86 | | SB | 33.908491 | -117.88291 | 9.402 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C405MC | 4 | 2025-01-16 15:50:48 | 1737071448 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 15:01:00 | 1737586860 | N | Orange | Orange | 405 | NB | | | 13.78 | | | 33.705441 | -117.954355 | 13.55 | Brookhurst St | | | | 14.82 | | | 33.716026 | -117.966943 | 14.59 | Warner Ave | NB 405 Fwy | Mainline | Lane | Standard | Permit Work | | RShoulder | 5 | N | | | N | | | N | | | N C90FA | 43 | 2025-01-13 19:31:25 | 1736825485 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:59:00 | 1737586740 | N | Orange | Orange | 90 | WB | | | 6.58 | | | 33.911212 | -117.858815 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911143 | -117.864477 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3 | 3 | N | | | N | | | N | | | Y C57MA | 13 | 2025-01-13 04:45:22 | 1736772322 | 2025-01-22 09:01:00 | 1737565260 | 2025-01-22 14:59:00 | 1737586740 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Alternating Lanes | Standard | Striping Operation | 1 | L T Lane 1, 1, R T Lane 1 | 3 | N | | | N | | | N | | | N C1SA | 28 | 2025-01-13 08:31:13 | 1736785873 | 2025-01-22 09:01:12 | 1737565272 | 2025-01-22 15:30:12 | 1737588612 | N | Orange | Orange | 1 | NB | | | 24.72 | | | 33.656826 | -118.001371 | 20.814 | MAIN ST (DOWN TOWN) | | | | 25.72 | | | 33.666651 | -118.015045 | 28.814 | 10th st | 17th Street | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1SA | 13 | 2025-01-13 08:28:14 | 1736785694 | 2025-01-22 09:01:12 | 1737565272 | 2025-01-22 15:30:12 | 1737588612 | N | Orange | Orange | 1 | NB | | | 32.72 | | | 33.74105 | -118.095638 | 25.41 | Seal Beach Blvd | | | | 33.72 | | | 33.749903 | -118.105868 | 28.814 | Orange / Los Angeles County Line | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1JA | 3 | 2025-01-14 13:15:20 | 1736889320 | 2025-01-22 09:01:18 | 1737565278 | 2025-01-22 15:59:18 | 1737590358 | N | Orange | Orange | 1 | NB | | | 8.21 | | | 33.529474 | -117.772042 | 4.294 | Agate St | Ruby St | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | N | | | N | | | N | | | Y C1LA | 3 | 2025-01-16 13:38:21 | 1737063501 | 2025-01-22 09:01:18 | 1737565278 | 2025-01-22 14:59:18 | 1737586758 | N | Orange | Orange | 1 | NB | | | 6.47 | | | 33.508465 | -117.750123 | 2.554 | Aliso Way | Closure starts at Camel Pt. | | | 7.35 | | | 33.52085 | -117.761361 | 3.434 | Nyes Pl | Closure ends at Hinkle | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y P39GA | 13 | 2025-01-13 16:50:22 | 1736815822 | 2025-01-22 09:01:19 | 1737565279 | 2025-01-22 14:59:19 | 1737586759 | N | Orange | Orange | 39 | NB | | | 22.66 | | | 33.939034 | -117.934656 | 20.88 | Harbor Blvd | West of Harbor Blvd. | | | 23.2 | | | 33.939055 | -117.933084 | | End County | Harbor Blvd. | Conventional Hwy | Lane | Standard | Permit Work | | L T Lane 2, R T Lane 1 | 2 | N | | | N | | | N | | | N P57EA | 7 | 2025-01-15 14:10:24 | 1736979024 | 2025-01-22 09:01:21 | 1737565281 | 2025-01-22 14:59:21 | 1737586761 | N | Orange | Orange | 57 | SB | | | 17.57 | | | 33.878018 | -117.88121 | 6.921 | Nutwood Ave | | | | 17.57 | | SB | 33.874406 | -117.881097 | 6.921 | Orange Frwy, Rte 57 | E Chapman Ave. | On Ramp | Lane | Standard | Permit Work | | 2 | 2 | N | | | N | | | N | | | N P57EA | 11 | 2025-01-15 14:13:24 | 1736979204 | 2025-01-22 09:01:21 | 1737565281 | 2025-01-22 14:59:21 | 1737586761 | N | Orange | Orange | 57 | N/A | | | 17.57 | | WB | 33.878135 | -117.880635 | 6.879 | Nutwood Ave | | | | 17.57 | | | 33.878135 | -117.880635 | 6.879 | Orange Frwy, Rte 57 | | Surface Street | Lane | Standard | Permit Work | | L T Lane 1 | 2 | N | | | N | | | N | | | N M22AA | 2 | 2025-01-15 10:22:25 | 1736965345 | 2025-01-22 09:01:23 | 1737565283 | 2025-01-22 14:01:23 | 1737583283 | N | Orange | Orange | 22 | WB | | | 9.73 | | | 33.77908 | -117.890873 | | The City Dr | | | | 9.07 | | | 33.776989 | -117.900003 | | Haster St | | Mainline | Lane | Standard | Drainage Work | 5 | HOV | 4 | N | | | N | | | N | | | N C1SA | 8 | 2025-01-13 08:27:26 | 1736785646 | 2025-01-22 09:01:24 | 1737565284 | 2025-01-22 15:30:24 | 1737588624 | N | Orange | Orange | 1 | NB | | | 29.89 | | | 33.728225 | -118.082819 | 22.58 | Warner Ave | Phillips St | | | 32.72 | | | 33.740818 | -118.095271 | 28.814 | Seal Beach Blvd | | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y P39GA | 20 | 2025-01-15 13:37:39 | 1736977059 | 2025-01-22 09:01:37 | 1737565297 | 2025-01-22 14:59:37 | 1737586777 | N | Orange | Orange | 39 | NB | | | 20.17 | | | 33.930897 | -117.967736 | 18.39 | La Habra Blvd | South of La Habra Blvd. (Phase 1) | | | 20.17 | | | 33.93185 | -117.967747 | 18.39 | La Habra Blvd | | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1 | 3 | N | | | N | | | N | | | N P1BA | 3 | 2025-01-13 12:34:50 | 1736800490 | 2025-01-22 09:01:48 | 1737565308 | 2025-01-22 14:59:48 | 1737586788 | N | Orange | Orange | 1 | NB | | | 19.41 | | | 33.616967 | -117.917324 | 15.504 | Tustin Ave | | | | 19.41 | | | 33.617589 | -117.918868 | 15.504 | Tustin Ave | | Conventional Hwy | Lane | Standard | Permit Work | 5 | 3 | 3 | N | | | N | | | N | | | N C1SA | 33 | 2025-01-13 08:31:56 | 1736785916 | 2025-01-22 09:01:55 | 1737565315 | 2025-01-22 15:30:55 | 1737588655 | N | Orange | Orange | 1 | SB | | | 25.72 | | | 33.665092 | -118.013153 | 21.814 | 10th st | 17th street | | | 24.72 | | | 33.656989 | -118.00192 | 28.814 | MAIN ST (DOWN TOWN) | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1LA | 8 | 2025-01-16 13:40:58 | 1737063658 | 2025-01-22 09:01:55 | 1737565315 | 2025-01-22 14:59:55 | 1737586795 | N | Orange | Orange | 1 | SB | | | 6.47 | | | 33.505337 | -117.746863 | 2.554 | Aliso Way | Bluff Dr. is where closure starts | | | 5.73 | | | 33.5049 | -117.746412 | 1.814 | 3RD AVE | Closure ends south of Bluff. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y C1SA | 23 | 2025-01-13 08:29:58 | 1736785798 | 2025-01-22 09:01:57 | 1737565317 | 2025-01-22 15:30:57 | 1737588657 | N | Orange | Orange | 1 | SB | | | 32.72 | | | 33.740761 | -118.095344 | 25.41 | Seal Beach Blvd | | | | 31.5 | | | 33.727877 | -118.082549 | 28.814 | Warner Ave | Phillips St | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y M55BA | 2 | 2025-01-14 09:20:16 | 1736875216 | 2025-01-22 09:15:00 | 1737566100 | 2025-01-22 14:01:00 | 1737583260 | N | Orange | Orange | 55 | SB | | | 11.79 | | | 33.759867 | -117.831198 | 11.602 | 17th St | | | | 10.98 | | | 33.748234 | -117.832382 | 10.792 | Fourth St/ Irvine Blvd | | Mainline | Lane | Standard | Graffity Removal | 0 | 4 | 4 | N | | | N | | | N | | | N C5IC | 14 | 2024-12-26 16:09:10 | 1735258150 | 2025-01-22 20:01:08 | 1737604868 | 2025-01-23 04:59:08 | 1737637148 | N | Orange | Orange | 5 | SB | | | 24.99 | | | 33.690068 | -117.768724 | | Jeffrey Rd | | | | 23.94 | | | 33.675839 | -117.756964 | | Sand Cyn Rd | | Mainline | Lane | Standard | Miscellaneous Work | | 5 | 5 | N | | | N | | | N | | | N C73XA | 29 | 2024-12-26 16:26:13 | 1735259173 | 2025-01-22 20:01:10 | 1737604870 | 2025-01-23 04:59:10 | 1737637150 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C5FC | 13 | 2025-01-14 12:37:41 | 1736887061 | 2025-01-22 20:01:39 | 1737604899 | 2025-01-23 05:59:39 | 1737640779 | N | Orange | Orange | 5 | NB | | | 17.47 | | | 33.604633 | -117.6904 | 89.513 | Alicia Pkwy | | | | 18.69 | | | 33.614705 | -117.707387 | 90.752 | El Toro Rd | | Mainline | Lane | Standard | Landscape Work | | 5, Auxiliary | 5 | N | | | N | | | N | | | N C73XA | 39 | 2024-12-26 16:28:44 | 1735259324 | 2025-01-22 20:01:41 | 1737604901 | 2025-01-23 04:59:41 | 1737637181 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C5LA | 5 | 2025-01-15 11:17:45 | 1736968665 | 2025-01-22 20:01:43 | 1737604903 | 2025-01-23 01:59:43 | 1737626383 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N C73XA | 55 | 2025-01-16 14:04:57 | 1737065097 | 2025-01-22 20:01:55 | 1737604915 | 2025-01-23 04:59:55 | 1737637195 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C73XA | 47 | 2025-01-16 14:03:59 | 1737065039 | 2025-01-22 20:01:56 | 1737604916 | 2025-01-23 04:59:56 | 1737637196 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 62 | 2025-01-15 17:01:34 | 1736989294 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | N/A | | | 7.85 | | WB | 33.708467 | -117.851332 | | Dyer Rd | | | | 7.85 | | | 33.708467 | -117.851332 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C55NA | 27 | 2025-01-14 14:20:36 | 1736893236 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | NB | | | 6.12 | | NB | 33.686378 | -117.864111 | | John Wayne Airport | | | | 6.12 | | NB | 33.686467 | -117.864154 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55NA | 31 | 2025-01-14 14:26:26 | 1736893586 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 66 | 2025-01-15 17:01:45 | 1736989305 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | N/A | | | 7.85 | | EB | 33.708668 | -117.85086 | | Dyer Rd | | | | 7.85 | | | 33.708668 | -117.85086 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C55NA | 39 | 2025-01-16 14:56:02 | 1737068162 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | SB | | | 5.32 | | | 33.679784 | -117.879634 | | Baker St | | | | 4.02 | | | 33.665955 | -117.895056 | | Mesa Dr | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 18 | 2025-01-08 15:51:24 | 1736380284 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | SB | | | 9.44 | | SB | 33.727617 | -117.834717 | | Costa Mesa Frwy, Rte 55 | | | | 9.44 | | SB | 33.72759 | -117.834749 | | Edinger Ave | | Off Ramp | Full | Standard | Sign Work | | All | 2 | N | | | N | | | N | | | N C405IC | 3 | 2025-01-16 17:18:52 | 1737076732 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 74 | 2025-01-16 13:24:41 | 1737062681 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | N/A | | | 7.85 | | SB | 33.709078 | -117.85211 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.709078 | -117.85211 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C55DA | 70 | 2025-01-16 13:24:27 | 1737062667 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | N/A | | | 7.85 | | NB | 33.70902 | -117.852051 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.70902 | -117.852051 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C57BA | 3 | 2024-12-16 15:20:52 | 1734391252 | 2025-01-22 21:01:00 | 1737608460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 57 | NB | | | 20.35 | | | 33.91293 | -117.883077 | 9.616 | Lambert Rd | 2000' SOUTH of Birch St UC | | | 20.35 | | | 33.919888 | -117.880224 | 9.616 | Lambert Rd | 500' NORTH of Birch St UC | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 5, 4, 6 | 6 | N | | | N | | | N | | | Y C73XA | 59 | 2025-01-16 14:07:03 | 1737065223 | 2025-01-22 21:01:01 | 1737608461 | 2025-01-23 03:59:01 | 1737633541 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C73XA | 25 | 2024-12-26 16:26:05 | 1735259165 | 2025-01-22 21:01:02 | 1737608462 | 2025-01-23 04:59:02 | 1737637142 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55DA | 77 | 2025-01-17 15:24:06 | 1737156246 | 2025-01-22 21:01:03 | 1737608463 | 2025-01-23 04:59:03 | 1737637143 | N | Orange | Orange | 55 | N/A | | | 9.44 | | SB | 33.716885 | -117.844043 | | Edinger Ave | Ritchey ST | | | 9.44 | | | 33.716885 | -117.844043 | | Costa Mesa Frwy, Rte 55 | From N of wright st to S of Edinger Ave | Surface Street | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C55DA | 50 | 2025-01-15 16:58:07 | 1736989087 | 2025-01-22 21:01:04 | 1737608464 | 2025-01-23 04:59:04 | 1737637144 | N | Orange | Orange | 55 | SB | | | 6.99 | | SB | 33.699652 | -117.863456 | | Macarthur Blvd | | | | 6.99 | | SB | 33.699652 | -117.863456 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C73XA | 4 | 2024-12-26 13:54:06 | 1735250046 | 2025-01-22 21:01:04 | 1737608464 | 2025-01-23 04:59:04 | 1737637144 | N | Orange | Orange | 73 | SB | | | 26.5 | | SB | 33.679925 | -117.880395 | | Baker St | | | | 26.5 | | SB | 33.679916 | -117.880411 | | RTE. 73 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55DA | 58 | 2025-01-15 17:00:13 | 1736989213 | 2025-01-22 21:01:10 | 1737608470 | 2025-01-23 04:59:10 | 1737637150 | N | Orange | Orange | 55 | NB | | | 6.99 | | WB | 33.697575 | -117.859759 | | Macarthur Blvd | Macarthur Blvd NB on ramp (MA4Line) | | | 6.99 | | NB | 33.697535 | -117.859727 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C73XA | 51 | 2025-01-16 14:04:14 | 1737065054 | 2025-01-22 21:01:11 | 1737608471 | 2025-01-23 03:59:11 | 1737633551 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 54 | 2025-01-15 16:59:18 | 1736989158 | 2025-01-22 21:01:15 | 1737608475 | 2025-01-23 04:59:15 | 1737637155 | N | Orange | Orange | 55 | NB | | | 6.99 | | EB | 33.698204 | -117.861068 | | Macarthur Blvd | Macarthur Blvd NB Loop on ramp (MA5 Line) | | | 6.99 | | NB | 33.698204 | -117.861133 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55NA | 14 | 2024-12-26 14:30:19 | 1735252219 | 2025-01-22 21:01:17 | 1737608477 | 2025-01-23 04:59:17 | 1737637157 | N | Orange | Orange | 55 | SB | | | 4.74 | | SB | 33.6778 | -117.881528 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | SB | 33.67355 | -117.886206 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 36 | 2025-01-14 15:12:20 | 1736896340 | 2025-01-22 21:01:17 | 1737608477 | 2025-01-23 04:59:17 | 1737637157 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55NA | 19 | 2024-12-26 15:30:20 | 1735255820 | 2025-01-22 21:01:18 | 1737608478 | 2025-01-23 04:59:18 | 1737637158 | N | Orange | Orange | 55 | NB | | | 10.98 | | NB | 33.741007 | -117.833684 | 10.792 | Costa Mesa Frwy, Rte 55 | | | | 10.98 | | NB | 33.741007 | -117.833692 | 95.252 | Fourth St/ Irvine Blvd | | Off Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55DA | 24 | 2025-01-14 15:05:22 | 1736895922 | 2025-01-22 21:01:19 | 1737608479 | 2025-01-23 04:59:19 | 1737637159 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C405MA | 7 | 2025-01-14 13:54:21 | 1736891661 | 2025-01-22 21:01:19 | 1737608479 | 2025-01-23 04:59:19 | 1737637159 | N | Orange | Orange | 405 | NB | | | 8.74 | | NB | 33.686947 | -117.865954 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | SB | 33.686912 | -117.865938 | 8.51 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C133ZA | 4 | 2025-01-14 13:56:23 | 1736891783 | 2025-01-22 21:01:20 | 1737608480 | 2025-01-23 04:59:20 | 1737637160 | N | Orange | Orange | 133 | SB | | | 9.565 | | SB | 33.680719 | -117.749618 | 9.579 | Laguna Cyn Frwy, Rte 133 | | | | 9.565 | | NB | 33.680717 | -117.749615 | 9.579 | Santa Ana Frwy, Rte 5 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 80 | 2025-01-17 15:25:27 | 1737156327 | 2025-01-22 21:01:25 | 1737608485 | 2025-01-23 04:59:25 | 1737637165 | N | Orange | Orange | 55 | N/A | | | 6.99 | | EB | 33.698013 | -117.860472 | | Macarthur Blvd | | | | 6.99 | | | 33.698013 | -117.860472 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C405CA | 53 | 2025-01-13 20:18:26 | 1736828306 | 2025-01-22 21:01:26 | 1737608486 | 2025-01-23 04:59:26 | 1737637166 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 4, 5, RShoulder | 5 | N | | | N | | | N | | | N C73XA | 14 | 2024-12-26 14:56:28 | 1735253788 | 2025-01-22 21:01:26 | 1737608486 | 2025-01-23 04:59:26 | 1737637166 | N | Orange | Orange | 73 | NB | | | 26.581 | | NB | 33.670641 | -117.883362 | | RTE. 73 | | | | 26.581 | | SB | 33.670573 | -117.883338 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405MA | 3 | 2025-01-14 12:57:30 | 1736888250 | 2025-01-22 21:01:28 | 1737608488 | 2025-01-23 04:59:28 | 1737637168 | N | Orange | Orange | 405 | SB | | | 8.74 | | SB | 33.687112 | -117.879621 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.687085 | -117.879573 | 8.51 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5IC | 9 | 2024-12-26 15:35:33 | 1735256133 | 2025-01-22 21:01:30 | 1737608490 | 2025-01-23 04:59:30 | 1737637170 | N | Orange | Orange | 5 | NB | | | 30.28 | | NB | 33.739449 | -117.829518 | 102.335 | Santa Ana Fwy, Freeway I-5 | | | | 30.28 | | NB | 33.739369 | -117.829459 | 95.252 | Route 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 35 | 2024-12-26 16:28:35 | 1735259315 | 2025-01-22 21:01:33 | 1737608493 | 2025-01-23 04:59:33 | 1737637173 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55DA | 14 | 2025-01-08 15:50:36 | 1736380236 | 2025-01-22 21:01:34 | 1737608494 | 2025-01-23 04:59:34 | 1737637174 | N | Orange | Orange | 55 | SB | | | 9.96 | | SB | 33.730323 | -117.834116 | | Mcfadden St | | | | 9.96 | | SB | 33.730323 | -117.834116 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Concrete Pour | | All | 2 | N | | | N | | | N | | | N C55NA | 9 | 2024-12-26 14:25:41 | 1735251941 | 2025-01-22 21:01:39 | 1737608499 | 2025-01-23 04:59:39 | 1737637179 | N | Orange | Orange | 55 | NB | | | 4.74 | | NB | 33.67044 | -117.889523 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | NB | 33.670387 | -117.889553 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 9 | 2024-12-26 14:27:44 | 1735252064 | 2025-01-22 21:01:41 | 1737608501 | 2025-01-23 04:59:41 | 1737637181 | N | Orange | Orange | 73 | NB | | | 9.44 | | NB | 33.670498 | -117.889478 | | RTE. 73 | | | | 9.44 | | NB | 33.670481 | -117.889456 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405MA | 11 | 2025-01-14 14:18:45 | 1736893125 | 2025-01-22 21:01:42 | 1737608502 | 2025-01-23 04:59:42 | 1737637182 | N | Orange | Orange | 405 | NB | | | 8.74 | | NB | 33.686966 | -117.865938 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.686946 | -117.865905 | 9.579 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55NA | 4 | 2024-12-26 14:11:45 | 1735251105 | 2025-01-22 21:01:43 | 1737608503 | 2025-01-23 04:59:43 | 1737637183 | N | Orange | Orange | 55 | NB | | | 4.737 | | NB | 33.66815 | -117.892307 | 0 | Costa Mesa Frwy, Rte 55 | | | | 4.737 | | SB | 33.668114 | -117.892308 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5IC | 4 | 2024-12-26 15:09:50 | 1735254590 | 2025-01-22 21:01:48 | 1737608508 | 2025-01-23 04:59:48 | 1737637188 | N | Orange | Orange | 5 | SB | | | 23.19 | | SB | 33.680593 | -117.749709 | 95.189 | Santa Ana Fwy, Freeway I-5 | | | | 23.19 | | NB | 33.68057 | -117.749716 | 95.252 | Route 133 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 83 | 2025-01-17 15:26:52 | 1737156412 | 2025-01-22 21:01:49 | 1737608509 | 2025-01-23 04:59:49 | 1737637189 | N | Orange | Orange | 55 | NB | | | 6.99 | | NB | 33.695964 | -117.863695 | | Costa Mesa Frwy, Rte 55 | | | | 6.99 | | NB | 33.695852 | -117.863721 | | Macarthur Blvd | | Off Ramp | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C405CA | 41 | 2025-01-13 20:16:51 | 1736828211 | 2025-01-22 21:01:51 | 1737608511 | 2025-01-23 05:59:51 | 1737640791 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 4, RShoulder | 4 | N | | | N | | | N | | | N C405CA | 29 | 2025-01-13 20:13:52 | 1736828032 | 2025-01-22 21:01:51 | 1737608511 | 2025-01-23 04:59:51 | 1737637191 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV | 4 | N | | | N | | | N | | | N C5IC | 22 | 2025-01-16 17:28:58 | 1737077338 | 2025-01-22 21:01:55 | 1737608515 | 2025-01-23 04:59:55 | 1737637195 | N | Orange | Orange | 5 | NB | | | 21.304 | | NB | 33.638633 | -117.729853 | 93.303 | Santa Ana Fwy, Freeway I-5 | | | | 21.304 | | NB | 33.638615 | -117.729837 | 93.366 | 405/5 JCT | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 19 | 2024-12-26 15:00:01 | 1735254001 | 2025-01-22 21:01:59 | 1737608519 | 2025-01-23 04:59:59 | 1737637199 | N | Orange | Orange | 73 | SB | | | 26.581 | | SB | 33.668498 | -117.881491 | | RTE. 73 | | | | 26.581 | | SB | 33.668409 | -117.881469 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y P261CA | 1 | 2025-01-07 11:17:42 | 1736277462 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 261 | NB | | | 5.73 | | NB | 33.780595 | -117.75089 | 5.73 | Eastern Trans. Toll Rd, Rte 261 | | | | 5.73 | | NB | 33.780192 | -117.753856 | 5.73 | Santiago Canyon Rd | | Off Ramp | Lane | Standard | Permit Work | | L T Lane 1 | 2 | N | | | N | | | N | | | N C57MA | 9 | 2025-01-02 18:57:20 | 1735873040 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 57 | SB | | | 19.86 | | EB | 33.911135 | -117.886347 | 9.211 | Imperial Hwy, Hwy 90 | | | | 19.86 | | SB | 33.908491 | -117.88291 | 9.126 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C90FA | 9 | 2025-01-02 19:01:49 | 1735873309 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 90 | EB | | | 6.58 | | | 33.910889 | -117.869691 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.910987 | -117.862862 | 9.126 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y P241CA | 2 | 2025-01-07 11:15:21 | 1736277321 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 241 | SB | | | 32.541 | | SB | 33.784572 | -117.747909 | 17.996 | Foothill Toll Rd, Rte 241 | | | | 32.541 | | SB | 33.782052 | -117.748132 | 17.996 | Santiago Cyn Rd | | Off Ramp | Lane | Standard | Permit Work | | R T Lane 2 | 2 | N | | | N | | | N | | | N C90FA | 14 | 2025-01-02 19:05:47 | 1735873547 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 90 | WB | | | 6.58 | | | 33.911212 | -117.858815 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911143 | -117.864477 | 9.126 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C90FA | 19 | 2025-01-02 19:10:02 | 1735873802 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 90 | WB | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C90FA | 24 | 2025-01-02 19:16:12 | 1735874172 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 90 | N/A | | | 6.58 | | NB | 33.911537 | -117.863663 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911537 | -117.863663 | 9.402 | Imperial Hwy, Rte. 90 | | Surface Street | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, RShoulder, Sidewalk | 2 | N | | | N | | | N | | | N C55NA | 35 | 2025-01-14 14:26:39 | 1736893599 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C91WA | 7 | 2025-01-10 14:15:50 | 1736547350 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 91 | EB | | R | .848 | | NB | 33.855978 | -118.028437 | 15.587 | Valley View St | | | R | .848 | | EB | 33.85588 | -118.025948 | 16.581 | Artesia Frwy, Rte 91 | | On Ramp | Full | Standard | Sign Work | | All | 1 | N | | | N | | | N | | | N C91WA | 24 | 2025-01-15 13:00:25 | 1736974825 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 01:59:00 | 1737626340 | N | Orange | Orange | 91 | EB | | R | .848 | | | 33.856519 | -118.028443 | 15.587 | Valley View St | | | R | 1.842 | | | 33.855892 | -118.01147 | 16.581 | Knott Ave | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N C22HA | 5 | 2025-01-08 12:32:54 | 1736368374 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 22 | WB | | R | 12.88 | | | 33.777258 | -117.836318 | 14.451 | Tustin Ave | | | R | 11.83 | | | 33.775412 | -117.84986 | 13.391 | Glassell St / Grand aver | | Mainline | Lane | Standard | Highway Construction | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C22HA | 6 | 2025-01-08 12:33:18 | 1736368398 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 22 | WB | | R | 12.88 | | WB | 33.777749 | -117.835903 | 14.451 | Tustin Ave | | | R | 11.83 | | WB | 33.776737 | -117.840448 | 13.391 | Garden Grove Fwy, Rte. 22 | | On Ramp | Full | Standard | Highway Construction | | All | 2 | N | | | N | | | N | | | N C57BA | 6 | 2025-01-16 15:11:01 | 1737069061 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 57 | NB | | | 20.35 | | | 33.91293 | -117.883077 | 9.616 | Lambert Rd | 2000' SOUTH of Birch St UC | | | 20.35 | | | 33.919888 | -117.880224 | 9.616 | Lambert Rd | 500' NORTH of Birch St UC | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 3, 4, 5, 6 | 6 | N | | | N | | | N | | | Y C405IC | 7 | 2025-01-16 17:19:02 | 1737076742 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4, 3 | 4 | N | | | N | | | N | | | Y C91WA | 6 | 2025-01-10 14:14:04 | 1736547244 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 91 | EB | | R | .848 | | SB | 33.85604 | -118.028448 | 15.587 | Valley View St | | | R | .848 | | EB | 33.855888 | -118.025862 | 16.581 | Artesia Frwy, Rte 91 | | On Ramp | Full | Standard | Sign Work | | All | 1 | N | | | N | | | N | | | N C57MA | 4 | 2025-01-02 18:47:00 | 1735872420 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C90FA | 4 | 2025-01-02 18:52:09 | 1735872729 | 2025-01-22 22:01:00 | 1737612060 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 90 | EB | | | 5.19 | | | 33.911731 | -117.887813 | 8.014 | State College Blvd | | | | 5.331 | | | 33.910978 | -117.885507 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C1JA | 13 | 2025-01-14 13:19:08 | 1736889548 | 2025-01-22 22:01:06 | 1737612066 | 2025-01-23 04:59:06 | 1737637146 | N | Orange | Orange | 1 | NB | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 10.16 | | | 33.547267 | -117.796819 | 6.244 | Wave St | Ledroit St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C5LA | 25 | 2025-01-15 11:24:09 | 1736969049 | 2025-01-22 22:01:07 | 1737612067 | 2025-01-23 05:59:07 | 1737640747 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.76 | Crown Valley Pkwy | | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.842 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C405CA | 45 | 2025-01-13 20:17:10 | 1736828230 | 2025-01-22 22:01:09 | 1737612069 | 2025-01-23 04:59:09 | 1737637149 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C405CA | 33 | 2025-01-13 20:14:10 | 1736828050 | 2025-01-22 22:01:10 | 1737612070 | 2025-01-23 04:59:10 | 1737637150 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N P5FA | 7 | 2025-01-14 07:25:20 | 1736868320 | 2025-01-22 22:01:18 | 1737612078 | 2025-01-23 04:59:18 | 1737637158 | N | Orange | Orange | 5 | N/A | | | 23.94 | | SB | 33.678752 | -117.75716 | | Sand Cyn Rd | | | | 23.94 | | | 33.678752 | -117.75716 | | Santa Ana Fwy, Freeway I-5 | | Surface Street | Lane | Standard | Permit Work | 5 | L T Lane 1 | 3 | N | | | N | | | N | | | N P57EA | 4 | 2025-01-13 16:55:22 | 1736816122 | 2025-01-22 22:01:19 | 1737612079 | 2025-01-23 04:59:19 | 1737637159 | N | Orange | Orange | 57 | N/A | | | 12.54 | | EB | 33.805764 | -117.883051 | 1.849 | Katella Ave | East of Howell Ave. (Stage 1F) | | | 12.54 | | | 33.805764 | -117.883051 | 1.806 | Orange Frwy, Rte 57 | East of Douglass Rd. | Surface Street | Lane | Standard | Permit Work | | 1, 2 | 3 | N | | | N | | | N | | | N C5LA | 33 | 2025-01-15 11:28:27 | 1736969307 | 2025-01-22 22:01:25 | 1737612085 | 2025-01-23 05:59:25 | 1737640765 | N | Orange | Orange | 5 | SB | | | 12.94 | | SB | 33.547257 | -117.673473 | 84.92 | Avery Pkwy | | | | 12.94 | | SB | 33.547257 | -117.673473 | 85.002 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C55DA | 40 | 2025-01-14 15:12:31 | 1736896351 | 2025-01-22 22:01:28 | 1737612088 | 2025-01-23 03:59:28 | 1737633568 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y P5FA | 3 | 2025-01-14 07:24:29 | 1736868269 | 2025-01-22 22:01:28 | 1737612088 | 2025-01-23 04:59:28 | 1737637168 | N | Orange | Orange | 5 | N/A | | | 23.94 | | NB | 33.676518 | -117.759594 | | Sand Cyn Rd | | | | 23.94 | | | 33.676518 | -117.759594 | | Santa Ana Fwy, Freeway I-5 | | Surface Street | Lane | Standard | Permit Work | 5 | 3 | 3 | N | | | N | | | N | | | N P5FA | 11 | 2025-01-14 07:28:31 | 1736868511 | 2025-01-22 22:01:30 | 1737612090 | 2025-01-23 04:59:30 | 1737637170 | N | Orange | Orange | 5 | SB | | | 23.94 | | SB | 33.67841 | -117.759519 | | Santa Ana Fwy, Freeway I-5 | | | | 23.94 | | | 33.677727 | -117.758033 | | Sand Cyn Rd | | Off Ramp | Lane | Standard | Permit Work | 5 | L T Lane 2, R T Lane 2 | 1 | N | | | N | | | N | | | N C55DA | 28 | 2025-01-14 15:05:38 | 1736895938 | 2025-01-22 22:01:36 | 1737612096 | 2025-01-23 03:59:36 | 1737633576 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C1JA | 17 | 2025-01-14 13:19:41 | 1736889581 | 2025-01-22 22:01:39 | 1737612099 | 2025-01-23 04:59:39 | 1737637179 | N | Orange | Orange | 1 | NB | | | 8.21 | | | 33.529474 | -117.772042 | 4.294 | Agate St | Ruby St | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 35 | 2025-01-14 13:22:45 | 1736889765 | 2025-01-22 22:01:43 | 1737612103 | 2025-01-23 07:59:43 | 1737647983 | N | Orange | Orange | 1 | SB | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 8.21 | | | 33.529402 | -117.772121 | 4.294 | Agate St | Ruby St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C405CA | 57 | 2025-01-13 20:18:45 | 1736828325 | 2025-01-22 22:01:44 | 1737612104 | 2025-01-23 04:59:44 | 1737637184 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 3, 4, 5, RShoulder | 5 | N | | | N | | | N | | | Y C57AA | 2 | 2025-01-13 12:07:47 | 1736798867 | 2025-01-22 22:01:45 | 1737612105 | 2025-01-23 04:59:45 | 1737637185 | N | Orange | Orange | 57 | SB | | R | 22.55 | | | 33.945989 | -117.868735 | 11.901 | ORANGE-LA CO LINE | | | | 11.24 | | | 33.787909 | -117.880101 | .591 | Chapman Ave ( city of orange ) | | Mainline | Lane | Standard | Striping Operation | | HOV, 1, 2, 3 | 5 | N | | | N | | | N | | | Y C1JA | 21 | 2025-01-14 13:20:50 | 1736889650 | 2025-01-22 22:01:48 | 1737612108 | 2025-01-23 07:59:48 | 1737647988 | N | Orange | Orange | 1 | SB | | | 10.16 | | | 33.54718 | -117.796847 | 6.244 | Wave St | Ledroit St | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C405CA | 65 | 2025-01-13 20:26:00 | 1736828760 | 2025-01-22 23:01:00 | 1737615660 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 405 | NB | | | 2.88 | | SB | 33.659473 | -117.776333 | 2.65 | Sand Canyon Ave | scd3 | | | 2.88 | | NB | 33.659578 | -117.780573 | 2.65 | San Diego Frwy, Rte 405 | | On Ramp | Full | Standard | Electrical Work | | All | 2 | N | | | N | | | N | | | N C405CA | 68 | 2025-01-13 20:26:45 | 1736828805 | 2025-01-22 23:01:00 | 1737615660 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 405 | NB | | | 5.62 | | SB | 33.671023 | -117.821426 | 5.39 | Culver Dr | cu3 | | | 5.62 | | NB | 33.670646 | -117.825486 | 5.39 | San Diego Frwy, Rte 405 | | On Ramp | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | N C91WA | 25 | 2025-01-15 13:01:01 | 1736974861 | 2025-01-22 23:01:00 | 1737615660 | 2025-01-23 01:59:00 | 1737626340 | N | Orange | Orange | 91 | EB | | R | .848 | | | 33.856519 | -118.028443 | 15.587 | Valley View St | | | R | 1.842 | | | 33.855892 | -118.01147 | 16.581 | Knott Ave | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C5MA | 3 | 2025-01-06 12:13:03 | 1736194383 | 2025-01-22 23:01:01 | 1737615661 | 2025-01-23 04:59:01 | 1737637141 | N | Orange | Orange | 5 | NB | | | 28.25 | | NB | 33.725239 | -117.802745 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5MA | 13 | 2025-01-06 12:19:09 | 1736194749 | 2025-01-22 23:01:07 | 1737615667 | 2025-01-23 04:59:07 | 1737637147 | N | Orange | Orange | 5 | SB | | | 29.61 | | SB | 33.741509 | -117.836571 | 101.602 | Santa Ana Fwy, Freeway I-5 | | | | 29.61 | | | 33.73749 | -117.825956 | 101.602 | Newport Ave | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5FC | 29 | 2025-01-14 12:41:20 | 1736887280 | 2025-01-22 23:01:18 | 1737615678 | 2025-01-23 04:59:18 | 1737637158 | N | Orange | Orange | 5 | NB | | | 17.47 | | WB | 33.606284 | -117.690224 | 89.513 | Alicia Pkwy | AP-6 - WB Alicia Pkwy to NB I-5 Fwy | | | 17.47 | | NB | 33.606677 | -117.693571 | 90.752 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | N C405CA | 37 | 2025-01-13 20:14:24 | 1736828064 | 2025-01-22 23:01:23 | 1737615683 | 2025-01-23 03:59:23 | 1737633563 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C405CA | 49 | 2025-01-13 20:17:25 | 1736828245 | 2025-01-22 23:01:25 | 1737615685 | 2025-01-23 03:59:25 | 1737633565 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C5FC | 25 | 2025-01-14 12:40:36 | 1736887236 | 2025-01-22 23:01:33 | 1737615693 | 2025-01-23 04:59:33 | 1737637173 | N | Orange | Orange | 5 | NB | | | 17.47 | | EB | 33.605205 | -117.690153 | 89.513 | Alicia Pkwy | AP-5: EB Alicia Pkwy to NB I-5 On Ramp | | | 17.47 | | NB | 33.604642 | -117.690389 | 90.752 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | N C55DA | 44 | 2025-01-14 15:12:44 | 1736896364 | 2025-01-22 23:01:42 | 1737615702 | 2025-01-23 02:59:42 | 1737629982 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 32 | 2025-01-14 15:05:55 | 1736895955 | 2025-01-22 23:01:53 | 1737615713 | 2025-01-23 02:59:53 | 1737629993 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C5LA | 9 | 2025-01-15 11:17:56 | 1736968676 | 2025-01-22 23:01:54 | 1737615714 | 2025-01-23 01:59:54 | 1737626394 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C5FC | 21 | 2025-01-14 12:39:57 | 1736887197 | 2025-01-22 23:01:55 | 1737615715 | 2025-01-23 04:59:55 | 1737637195 | N | Orange | Orange | 5 | NB | | | 17.47 | | NB | 33.602551 | -117.68657 | 89.513 | Santa Ana Fwy, Freeway I-5 | AP-4 NB I-5 to Alicia Pkwy Off Ramp | | | 17.47 | | NB | 33.604633 | -117.6904 | 90.752 | Alicia Pkwy | | Off Ramp | Full | Standard | Pavement Repair | | All | 1 | N | | | N | | | N | | | N C5MA | 8 | 2025-01-06 12:15:58 | 1736194558 | 2025-01-22 23:01:56 | 1737615716 | 2025-01-23 04:59:56 | 1737637196 | N | Orange | Orange | 5 | SB | | | 28.25 | | SB | 33.7283 | -117.808281 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5FC | 17 | 2025-01-14 12:38:00 | 1736887080 | 2025-01-22 23:01:58 | 1737615718 | 2025-01-23 04:59:58 | 1737637198 | N | Orange | Orange | 5 | NB | | | 17.47 | | | 33.604633 | -117.6904 | 89.513 | Alicia Pkwy | | | | 18.69 | | | 33.614705 | -117.707387 | 90.752 | El Toro Rd | | Mainline | Lane | Standard | Landscape Work | | 4, 5, Auxiliary | 5 | N | | | N | | | N | | | N C405CA | 61 | 2025-01-13 20:22:52 | 1736828572 | 2025-01-22 23:59:00 | 1737619140 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 405 | NB | | | 1.8 | | NB | 33.651738 | -117.759455 | 1.57 | San Diego Frwy, Rte 405 | | | | 1.8 | | SB | 33.652511 | -117.761089 | 1.57 | Laguna Frwy, Rte 133 | c4 | Connector | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | Y C55NA | 23 | 2025-01-14 13:58:29 | 1736891909 | 2025-01-22 23:59:00 | 1737619140 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 55 | NB | | | 5.99 | | NB | 33.682922 | -117.876241 | | Costa Mesa Frwy, Rte 55 | | | | 5.99 | | SB | 33.682924 | -117.876229 | 9.579 | San Diego Frwy, Rte 405 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405EA | 7 | 2025-01-13 11:18:12 | 1736795892 | 2025-01-22 23:59:10 | 1737619150 | 2025-01-23 04:59:10 | 1737637150 | N | Orange | Orange | 405 | NB | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y C405EA | 4 | 2025-01-13 11:17:22 | 1736795842 | 2025-01-22 23:59:20 | 1737619160 | 2025-01-23 04:59:20 | 1737637160 | N | Orange | Orange | 405 | SB | | | 23.98 | | SB | 33.787777 | -118.095965 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.789498 | -118.088734 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y C91WA | 13 | 2025-01-10 14:24:33 | 1736547873 | 2025-01-23 00:01:31 | 1737619291 | 2025-01-23 01:59:31 | 1737626371 | N | Orange | Orange | 91 | EB | | R | .848 | | | 33.856519 | -118.028443 | 15.587 | Valley View St | | | R | 1.842 | | | 33.855892 | -118.01147 | 16.581 | Knott Ave | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | LShoulder, HOV, 1, 2, 3 | 4 | N | | | N | | | N | | | Y C5LA | 29 | 2025-01-15 11:24:48 | 1736969088 | 2025-01-23 02:01:00 | 1737626460 | 2025-01-23 05:59:00 | 1737640740 | N | Orange | Orange | 5 | SB | | | 12.94 | | SB | 33.55031 | -117.67299 | 84.92 | Santa Ana Fwy, Freeway I-5 | | | | 12.94 | | SB | 33.55031 | -117.67299 | 85.842 | Avery Pkwy | | Off Ramp | Full | Standard | Striping Operation | | All | 4 | N | | | N | | | N | | | N C91WA | 16 | 2025-01-10 14:29:02 | 1736548142 | 2025-01-23 02:01:00 | 1737626460 | 2025-01-23 04:59:00 | 1737637140 | N | Orange | Orange | 91 | EB | | R | .848 | | | 33.856519 | -118.028443 | 15.587 | Valley View St | | | R | 1.842 | | | 33.855892 | -118.01147 | 16.581 | Knott Ave | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 3, 4 | 4 | N | | | N | | | N | | | Y C91WA | 15 | 2025-01-10 14:28:33 | 1736548113 | 2025-01-23 02:01:00 | 1737626460 | 2025-01-23 03:59:00 | 1737633540 | N | Orange | Orange | 91 | EB | | R | .848 | | | 33.856519 | -118.028443 | 15.587 | Valley View St | | | R | 1.842 | | | 33.855892 | -118.01147 | 16.581 | Knott Ave | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C5LA | 37 | 2025-01-15 11:29:15 | 1736969355 | 2025-01-23 02:01:13 | 1737626473 | 2025-01-23 05:59:13 | 1737640753 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.791 | Santa Ana Fwy, Freeway I-5 | | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.002 | Crown Valley Pkwy | | Off Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C5LA | 14 | 2025-01-15 11:18:48 | 1736968728 | 2025-01-23 02:01:46 | 1737626506 | 2025-01-23 04:59:46 | 1737637186 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C57TA | 10 | 2025-01-13 13:19:51 | 1736803191 | 2025-01-23 02:01:48 | 1737626508 | 2025-01-23 04:59:48 | 1737637188 | N | Orange | Orange | 57 | SB | | | 19.86 | | | 33.908607 | -117.882794 | 9.211 | Imperial Hwy, Hwy 90 | Loc 23-24 SB | | | 18.34 | | | 33.901244 | -117.880963 | 4.866 | Yorba linda Blvd | | Mainline | Lane | Standard | Bridge Work | | HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C5LA | 19 | 2025-01-15 11:19:00 | 1736968740 | 2025-01-23 02:01:58 | 1737626518 | 2025-01-23 05:59:58 | 1737640798 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C1SA | 4 | 2025-01-13 08:26:48 | 1736785608 | 2025-01-23 06:01:46 | 1737640906 | 2025-01-23 13:59:46 | 1737669586 | N | Orange | Orange | 1 | NB | | | 17.43 | | | 33.613139 | -117.891514 | | Jamboree Rd | | | | 18.07 | | | 33.616186 | -117.908206 | | Bayside Dr | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N C1JA | 31 | 2025-01-14 13:22:02 | 1736889722 | 2025-01-23 08:01:00 | 1737648060 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 1 | SB | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 8.21 | | | 33.529402 | -117.772121 | 4.294 | Agate St | Ruby St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 26 | 2025-01-14 13:21:31 | 1736889691 | 2025-01-23 08:01:29 | 1737648089 | 2025-01-23 14:59:29 | 1737673169 | N | Orange | Orange | 1 | SB | | | 10.16 | | | 33.54718 | -117.796847 | 6.244 | Wave St | Ledroit St | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 9 | 2025-01-14 13:16:42 | 1736889402 | 2025-01-23 08:01:39 | 1737648099 | 2025-01-23 14:59:39 | 1737673179 | N | Orange | Orange | 1 | NB | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 10.16 | | | 33.547267 | -117.796819 | 6.244 | Wave St | Ledroit St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | N | | | N | | | N | | | Y C39EA | 4 | 2025-01-13 13:45:12 | 1736804712 | 2025-01-23 08:30:00 | 1737649800 | 2025-01-23 15:30:00 | 1737675000 | N | Orange | Orange | 39 | NB | | | 11.18 | | | 33.810162 | -117.993112 | 11.18 | Cerritos Ave | | | | 11.68 | | | 33.817432 | -117.993184 | 11.68 | Ball Rd | | Conventional Hwy | Lane | Standard | Utility Work | | 1, 2 | 4 | N | | | N | | | N | | | Y M22GA | 1 | 2025-01-16 12:30:12 | 1737059412 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:30:00 | 1737671400 | N | Orange | Orange | 22 | EB | | | .92 | | | 33.774383 | -118.038006 | | Valley View St | | | | 9.73 | | | 33.778809 | -117.888987 | | The City Dr | | Mainline | Moving | Standard | Sweeping Operation | | 4, RShoulder | 4 | N | | | N | | | N | | | N C1LA | 14 | 2025-01-16 14:10:06 | 1737065406 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 1 | SB | | | 5.73 | | | 33.500948 | -117.743359 | 1.814 | 3RD AVE | Closure starts at 5th Ave. | | | 5.5 | | | 33.4994 | -117.741967 | 1.584 | 7th Ave / Circle Dr | Closure ends at 7th Ave. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y M91PA | 3 | 2025-01-14 06:44:46 | 1736865886 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 13:30:00 | 1737667800 | N | Orange | Orange | 91 | EB | | | 5.258 | | | 33.854133 | -117.889548 | 23.631 | State College Blvd | | | | 8.812 | | | 33.847363 | -117.83253 | 27.185 | Riverdale ave | | Mainline | Moving | Standard | Sweeping Operation | | HOV | 3 | N | | | N | | | N | | | N C1SA | 19 | 2025-01-13 08:29:04 | 1736785744 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 15:30:00 | 1737675000 | N | Orange | Orange | 1 | SB | | | 18.07 | | | 33.616223 | -117.902259 | | Bayside Dr | | | | 17.43 | | | 33.613221 | -117.894152 | 28.814 | Jamboree Rd | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N X91HA | 1 | 2025-01-15 10:39:40 | 1736966380 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 15:01:00 | 1737673260 | N | Orange | Orange | 91 | WB | | | 17.973 | | | 33.873617 | -117.697429 | | Coal Cyn Rd | | | | 16.404 | | | 33.866839 | -117.711747 | | Gypsum Cyn Rd | | Mainline | Lane | Standard | Guardrail Repair | | 6, RShoulder | 6 | N | | | N | | | N | | | Y C90FA | 39 | 2025-01-13 19:29:39 | 1736825379 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 90 | EB | | | 6.58 | | | 33.910889 | -117.869691 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.910987 | -117.862862 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, 1, 2, 3 | 3 | N | | | N | | | N | | | Y C90FA | 29 | 2025-01-13 04:39:29 | 1736771969 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 90 | EB/WB | | | 5.331 | | | 33.911032 | -117.885496 | | State College Blvd | | | | 5.331 | | | 33.910988 | -117.885464 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Striping Operation | 1 | 1, 2, 3 | 3 | N | | | N | | | N | | | Y C90FA | 34 | 2025-01-13 19:26:21 | 1736825181 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 90 | WB | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3 | 3 | N | | | N | | | N | | | Y P1IA | 3 | 2025-01-15 14:35:09 | 1736980509 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 1 | NB | | | 32.72 | | | 33.740993 | -118.095569 | 28.814 | Seal Beach Blvd | North of Seal Beach Blvd. | | | 33.28 | | | 33.743417 | -118.100223 | 29.374 | Marina Dr | Balboa Dr. | Conventional Hwy | Lane | Standard | Permit Work | | 2 | 2 | N | | | N | | | N | | | Y M55BA | 3 | 2025-01-17 16:06:41 | 1737158801 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:01:00 | 1737669660 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.666676 | -117.89378 | | Mesa Dr | | | R | 4.587 | | | 33.669229 | -117.891041 | 4.417 | BRISTOL ST | | Mainline | Lane | Standard | Sign Work | 0 | 5 | 5 | N | | | N | | | N | | | N C57MA | 19 | 2025-01-13 19:33:20 | 1736825600 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 57 | SB | | | 19.86 | | EB | 33.911135 | -117.886347 | 9.211 | Imperial Hwy, Hwy 90 | | | | 19.86 | | SB | 33.908491 | -117.88291 | 9.402 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N P133GA | 11 | 2025-01-10 13:57:02 | 1736546222 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 133 | NB | | | .962 | | | 33.568066 | -117.763633 | .962 | Canyon Acres Dr | Before Stan Oaks Dr | | | 3.416 | | | 33.571578 | -117.762993 | 3.416 | El Toro Rd | Past Raquel Rd | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1, RShoulder | 1 | N | | | N | | | N | | | N C405MC | 5 | 2025-01-16 15:51:00 | 1737071460 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 15:01:00 | 1737673260 | N | Orange | Orange | 405 | NB | | | 13.78 | | | 33.705441 | -117.954355 | 13.55 | Brookhurst St | | | | 14.82 | | | 33.716026 | -117.966943 | 14.59 | Warner Ave | NB 405 Fwy | Mainline | Lane | Standard | Permit Work | | RShoulder | 5 | N | | | N | | | N | | | N C90FA | 44 | 2025-01-13 19:31:37 | 1736825497 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 90 | WB | | | 6.58 | | | 33.911212 | -117.858815 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911143 | -117.864477 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3 | 3 | N | | | N | | | N | | | Y M22GA | 2 | 2025-01-16 12:31:17 | 1737059477 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:30:00 | 1737671400 | N | Orange | Orange | 22 | WB | | | 9.07 | | | 33.776043 | -117.902228 | | Haster St | | | | .92 | | | 33.774696 | -118.037345 | | Valley View St | | Mainline | Moving | Standard | Sweeping Operation | | RShoulder, 4 | 4 | N | | | N | | | N | | | N P73IA | 2 | 2025-01-16 13:48:11 | 1737064091 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 73 | NB | | | 13.4 | | NB | 33.567424 | -117.697879 | 3.4 | RTE. 73 | | | | 13.4 | | | 33.573555 | -117.7058 | 3.4 | La Paz Rd | | Off Ramp | Full | Standard | Permit Work | 5 | All | 1 | N | | | N | | | N | | | N M91PA | 2 | 2025-01-02 09:37:49 | 1735839469 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 13:30:00 | 1737667800 | N | Orange | Orange | 91 | WB | | | 8.812 | | | 33.847341 | -117.832228 | 27.225 | Riverdale ave | | | | 5.258 | | | 33.854276 | -117.889658 | 23.671 | State College Blvd | | Mainline | Moving | Standard | Sweeping Operation | | HOV | 4 | N | | | N | | | N | | | N C57MA | 14 | 2025-01-13 04:45:35 | 1736772335 | 2025-01-23 09:01:00 | 1737651660 | 2025-01-23 14:59:00 | 1737673140 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Alternating Lanes | Standard | Striping Operation | 1 | L T Lane 1, 1, R T Lane 1 | 3 | N | | | N | | | N | | | N C1SA | 29 | 2025-01-13 08:31:13 | 1736785873 | 2025-01-23 09:01:12 | 1737651672 | 2025-01-23 15:30:12 | 1737675012 | N | Orange | Orange | 1 | NB | | | 24.72 | | | 33.656826 | -118.001371 | 20.814 | MAIN ST (DOWN TOWN) | | | | 25.72 | | | 33.666651 | -118.015045 | 28.814 | 10th st | 17th Street | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1SA | 14 | 2025-01-13 08:28:14 | 1736785694 | 2025-01-23 09:01:12 | 1737651672 | 2025-01-23 15:30:12 | 1737675012 | N | Orange | Orange | 1 | NB | | | 32.72 | | | 33.74105 | -118.095638 | 25.41 | Seal Beach Blvd | | | | 33.72 | | | 33.749903 | -118.105868 | 28.814 | Orange / Los Angeles County Line | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1JA | 4 | 2025-01-14 13:15:20 | 1736889320 | 2025-01-23 09:01:18 | 1737651678 | 2025-01-23 15:59:18 | 1737676758 | N | Orange | Orange | 1 | NB | | | 8.21 | | | 33.529474 | -117.772042 | 4.294 | Agate St | Ruby St | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | N | | | N | | | N | | | Y C1LA | 4 | 2025-01-16 13:38:21 | 1737063501 | 2025-01-23 09:01:18 | 1737651678 | 2025-01-23 14:59:18 | 1737673158 | N | Orange | Orange | 1 | NB | | | 6.47 | | | 33.508465 | -117.750123 | 2.554 | Aliso Way | Closure starts at Camel Pt. | | | 7.35 | | | 33.52085 | -117.761361 | 3.434 | Nyes Pl | Closure ends at Hinkle | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y P39GA | 14 | 2025-01-13 16:50:22 | 1736815822 | 2025-01-23 09:01:19 | 1737651679 | 2025-01-23 14:59:19 | 1737673159 | N | Orange | Orange | 39 | NB | | | 22.66 | | | 33.939034 | -117.934656 | 20.88 | Harbor Blvd | West of Harbor Blvd. | | | 23.2 | | | 33.939055 | -117.933084 | | End County | Harbor Blvd. | Conventional Hwy | Lane | Standard | Permit Work | | L T Lane 2, R T Lane 1 | 2 | N | | | N | | | N | | | N P57EA | 8 | 2025-01-15 14:10:24 | 1736979024 | 2025-01-23 09:01:21 | 1737651681 | 2025-01-23 14:59:21 | 1737673161 | N | Orange | Orange | 57 | SB | | | 17.57 | | | 33.878018 | -117.88121 | 6.921 | Nutwood Ave | | | | 17.57 | | SB | 33.874406 | -117.881097 | 6.921 | Orange Frwy, Rte 57 | E Chapman Ave. | On Ramp | Lane | Standard | Permit Work | | 2 | 2 | N | | | N | | | N | | | N P57EA | 12 | 2025-01-15 14:13:24 | 1736979204 | 2025-01-23 09:01:21 | 1737651681 | 2025-01-23 14:59:21 | 1737673161 | N | Orange | Orange | 57 | N/A | | | 17.57 | | WB | 33.878135 | -117.880635 | 6.879 | Nutwood Ave | | | | 17.57 | | | 33.878135 | -117.880635 | 6.879 | Orange Frwy, Rte 57 | | Surface Street | Lane | Standard | Permit Work | | L T Lane 1 | 2 | N | | | N | | | N | | | N M22AA | 3 | 2025-01-15 10:22:25 | 1736965345 | 2025-01-23 09:01:23 | 1737651683 | 2025-01-23 14:01:23 | 1737669683 | N | Orange | Orange | 22 | WB | | | 9.73 | | | 33.77908 | -117.890873 | | The City Dr | | | | 9.07 | | | 33.776989 | -117.900003 | | Haster St | | Mainline | Lane | Standard | Drainage Work | 5 | HOV | 4 | N | | | N | | | N | | | N C1SA | 9 | 2025-01-13 08:27:26 | 1736785646 | 2025-01-23 09:01:24 | 1737651684 | 2025-01-23 15:30:24 | 1737675024 | N | Orange | Orange | 1 | NB | | | 29.89 | | | 33.728225 | -118.082819 | 22.58 | Warner Ave | Phillips St | | | 32.72 | | | 33.740818 | -118.095271 | 28.814 | Seal Beach Blvd | | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y P405CA | 4 | 2025-01-13 17:00:36 | 1736816436 | 2025-01-23 09:01:33 | 1737651693 | 2025-01-23 14:59:33 | 1737673173 | N | Orange | Orange | 405 | NB | | | 11.45 | | NB | 33.68844 | -117.913119 | 11.22 | San Diego Frwy, Rte 405 | | | | 11.45 | | NB | 33.689242 | -117.919105 | 11.22 | Harbor Blvd | | Off Ramp | Lane | Standard | Permit Work | | RShoulder | 2 | N | | | N | | | N | | | N P133GA | 9 | 2025-01-10 13:49:37 | 1736545777 | 2025-01-23 09:01:35 | 1737651695 | 2025-01-23 14:59:35 | 1737673175 | N | Orange | Orange | 133 | NB | | | 3.416 | | | 33.57939 | -117.761997 | 3.416 | El Toro Rd | Before Willow Canyon Rd | | | 3.416 | | | 33.581912 | -117.761245 | 3.416 | El Toro Rd | | Conventional Hwy | Lane | Standard | Permit Work | | RShoulder | 1 | N | | | N | | | N | | | N P39GA | 21 | 2025-01-15 13:37:39 | 1736977059 | 2025-01-23 09:01:37 | 1737651697 | 2025-01-23 14:59:37 | 1737673177 | N | Orange | Orange | 39 | NB | | | 20.17 | | | 33.930897 | -117.967736 | 18.39 | La Habra Blvd | South of La Habra Blvd. (Phase 1) | | | 20.17 | | | 33.93185 | -117.967747 | 18.39 | La Habra Blvd | | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1 | 3 | N | | | N | | | N | | | N P133GA | 7 | 2025-01-10 13:45:45 | 1736545545 | 2025-01-23 09:01:43 | 1737651703 | 2025-01-23 14:59:43 | 1737673183 | N | Orange | Orange | 133 | NB | | | .962 | | | 33.550308 | -117.779562 | .962 | Canyon Acres Dr | Before Woodland Dr | | | .962 | | | 33.554066 | -117.775374 | .962 | Canyon Acres Dr | | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1, RShoulder | 2 | N | | | N | | | N | | | N P1BA | 4 | 2025-01-13 12:34:50 | 1736800490 | 2025-01-23 09:01:48 | 1737651708 | 2025-01-23 14:59:48 | 1737673188 | N | Orange | Orange | 1 | NB | | | 19.41 | | | 33.616967 | -117.917324 | 15.504 | Tustin Ave | | | | 19.41 | | | 33.617589 | -117.918868 | 15.504 | Tustin Ave | | Conventional Hwy | Lane | Standard | Permit Work | 5 | 3 | 3 | N | | | N | | | N | | | N C1SA | 34 | 2025-01-13 08:31:56 | 1736785916 | 2025-01-23 09:01:55 | 1737651715 | 2025-01-23 15:30:55 | 1737675055 | N | Orange | Orange | 1 | SB | | | 25.72 | | | 33.665092 | -118.013153 | 21.814 | 10th st | 17th street | | | 24.72 | | | 33.656989 | -118.00192 | 28.814 | MAIN ST (DOWN TOWN) | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1LA | 9 | 2025-01-16 13:40:58 | 1737063658 | 2025-01-23 09:01:55 | 1737651715 | 2025-01-23 14:59:55 | 1737673195 | N | Orange | Orange | 1 | SB | | | 6.47 | | | 33.505337 | -117.746863 | 2.554 | Aliso Way | Bluff Dr. is where closure starts | | | 5.73 | | | 33.5049 | -117.746412 | 1.814 | 3RD AVE | Closure ends south of Bluff. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y C1SA | 24 | 2025-01-13 08:29:58 | 1736785798 | 2025-01-23 09:01:57 | 1737651717 | 2025-01-23 15:30:57 | 1737675057 | N | Orange | Orange | 1 | SB | | | 32.72 | | | 33.740761 | -118.095344 | 25.41 | Seal Beach Blvd | | | | 31.5 | | | 33.727877 | -118.082549 | 28.814 | Warner Ave | Phillips St | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y C241GA | 1 | 2025-01-16 18:32:57 | 1737081177 | 2025-01-23 19:01:00 | 1737687660 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 241 | SB | | | 35.8 | | | 33.820278 | -117.717386 | 21.255 | Toll plaza | | | | 32.5 | | | 33.781702 | -117.748195 | 17.955 | Santiago Cyn Rd | | Mainline | Lane | Standard | K-rail Removal | | 3 | 3 | N | | | N | | | N | | | N C5IC | 15 | 2024-12-26 16:09:10 | 1735258150 | 2025-01-23 20:01:08 | 1737691268 | 2025-01-24 04:59:08 | 1737723548 | N | Orange | Orange | 5 | SB | | | 24.99 | | | 33.690068 | -117.768724 | | Jeffrey Rd | | | | 23.94 | | | 33.675839 | -117.756964 | | Sand Cyn Rd | | Mainline | Lane | Standard | Miscellaneous Work | | 5 | 5 | N | | | N | | | N | | | N C73XA | 30 | 2024-12-26 16:26:13 | 1735259173 | 2025-01-23 20:01:10 | 1737691270 | 2025-01-24 04:59:10 | 1737723550 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C5FC | 14 | 2025-01-14 12:37:41 | 1736887061 | 2025-01-23 20:01:39 | 1737691299 | 2025-01-24 05:59:39 | 1737727179 | N | Orange | Orange | 5 | NB | | | 17.47 | | | 33.604633 | -117.6904 | 89.513 | Alicia Pkwy | | | | 18.69 | | | 33.614705 | -117.707387 | 90.752 | El Toro Rd | | Mainline | Lane | Standard | Landscape Work | | 5, Auxiliary | 5 | N | | | N | | | N | | | N C73XA | 40 | 2024-12-26 16:28:44 | 1735259324 | 2025-01-23 20:01:41 | 1737691301 | 2025-01-24 04:59:41 | 1737723581 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C5LA | 6 | 2025-01-15 11:17:45 | 1736968665 | 2025-01-23 20:01:43 | 1737691303 | 2025-01-24 01:59:43 | 1737712783 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N C73XA | 56 | 2025-01-16 14:04:57 | 1737065097 | 2025-01-23 20:01:55 | 1737691315 | 2025-01-24 04:59:55 | 1737723595 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C73XA | 48 | 2025-01-16 14:03:59 | 1737065039 | 2025-01-23 20:01:56 | 1737691316 | 2025-01-24 04:59:56 | 1737723596 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C22PA | 4 | 2024-12-30 08:08:28 | 1735574908 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 22 | EB | | R | .92 | | | 33.77431 | -118.036106 | 2.377 | Valley View St | | | R | 3.45 | | | 33.771155 | -117.994472 | 4.907 | Beach Blvd, Rte 39 | | Mainline | Lane | Standard | K-rail Installation | | HOV, 1 | 3 | N | | | N | | | N | | | N C55DA | 63 | 2025-01-15 17:01:34 | 1736989294 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | N/A | | | 7.85 | | WB | 33.708467 | -117.851332 | | Dyer Rd | | | | 7.85 | | | 33.708467 | -117.851332 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C55NA | 28 | 2025-01-14 14:20:36 | 1736893236 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | NB | | | 6.12 | | NB | 33.686378 | -117.864111 | | John Wayne Airport | | | | 6.12 | | NB | 33.686467 | -117.864154 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55NA | 32 | 2025-01-14 14:26:26 | 1736893586 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 67 | 2025-01-15 17:01:45 | 1736989305 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | N/A | | | 7.85 | | EB | 33.708668 | -117.85086 | | Dyer Rd | | | | 7.85 | | | 33.708668 | -117.85086 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C55NA | 40 | 2025-01-16 14:56:02 | 1737068162 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | SB | | | 5.32 | | | 33.679784 | -117.879634 | | Baker St | | | | 4.02 | | | 33.665955 | -117.895056 | | Mesa Dr | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 19 | 2025-01-08 15:51:24 | 1736380284 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | SB | | | 9.44 | | SB | 33.726386 | -117.835398 | | Costa Mesa Frwy, Rte 55 | | | | 9.44 | | SB | 33.726475 | -117.835318 | | Edinger Ave | | Off Ramp | Full | Standard | Sign Work | | All | 2 | N | | | N | | | N | | | N C405IC | 4 | 2025-01-16 17:18:52 | 1737076732 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 75 | 2025-01-16 13:24:41 | 1737062681 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | N/A | | | 7.85 | | SB | 33.709078 | -117.85211 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.709078 | -117.85211 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C55DA | 71 | 2025-01-16 13:24:27 | 1737062667 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | N/A | | | 7.85 | | NB | 33.70902 | -117.852051 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.70902 | -117.852051 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C241GA | 2 | 2025-01-16 18:40:53 | 1737081653 | 2025-01-23 21:01:00 | 1737694860 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 241 | NB | | | 33.6 | | | 33.792831 | -117.734633 | 19.055 | Santiago Cyn Rd | | | | 35.6 | | | 33.81749 | -117.717898 | 21.055 | Toll plaza | | Mainline | Lane | Standard | K-rail Removal | | 3 | 3 | N | | | N | | | N | | | N C73XA | 60 | 2025-01-16 14:07:03 | 1737065223 | 2025-01-23 21:01:01 | 1737694861 | 2025-01-24 03:59:01 | 1737719941 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C73XA | 26 | 2024-12-26 16:26:05 | 1735259165 | 2025-01-23 21:01:02 | 1737694862 | 2025-01-24 04:59:02 | 1737723542 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55DA | 78 | 2025-01-17 15:24:06 | 1737156246 | 2025-01-23 21:01:03 | 1737694863 | 2025-01-24 04:59:03 | 1737723543 | N | Orange | Orange | 55 | N/A | | | 9.44 | | SB | 33.716885 | -117.844043 | | Edinger Ave | Ritchey ST | | | 9.44 | | | 33.716885 | -117.844043 | | Costa Mesa Frwy, Rte 55 | From N of wright st to S of Edinger Ave | Surface Street | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C55DA | 51 | 2025-01-15 16:58:07 | 1736989087 | 2025-01-23 21:01:04 | 1737694864 | 2025-01-24 04:59:04 | 1737723544 | N | Orange | Orange | 55 | SB | | | 6.99 | | SB | 33.699652 | -117.863456 | | Macarthur Blvd | | | | 6.99 | | SB | 33.699652 | -117.863456 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C73XA | 5 | 2024-12-26 13:54:06 | 1735250046 | 2025-01-23 21:01:04 | 1737694864 | 2025-01-24 04:59:04 | 1737723544 | N | Orange | Orange | 73 | SB | | | 26.5 | | SB | 33.679925 | -117.880395 | | Baker St | | | | 26.5 | | SB | 33.679916 | -117.880411 | | RTE. 73 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55DA | 59 | 2025-01-15 17:00:13 | 1736989213 | 2025-01-23 21:01:10 | 1737694870 | 2025-01-24 04:59:10 | 1737723550 | N | Orange | Orange | 55 | NB | | | 6.99 | | WB | 33.697575 | -117.859759 | | Macarthur Blvd | Macarthur Blvd NB on ramp (MA4Line) | | | 6.99 | | NB | 33.697535 | -117.859727 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C73XA | 52 | 2025-01-16 14:04:14 | 1737065054 | 2025-01-23 21:01:11 | 1737694871 | 2025-01-24 03:59:11 | 1737719951 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 55 | 2025-01-15 16:59:18 | 1736989158 | 2025-01-23 21:01:15 | 1737694875 | 2025-01-24 04:59:15 | 1737723555 | N | Orange | Orange | 55 | NB | | | 6.99 | | EB | 33.698204 | -117.861068 | | Macarthur Blvd | Macarthur Blvd NB Loop on ramp (MA5 Line) | | | 6.99 | | NB | 33.698204 | -117.861133 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55NA | 15 | 2024-12-26 14:30:19 | 1735252219 | 2025-01-23 21:01:17 | 1737694877 | 2025-01-24 04:59:17 | 1737723557 | N | Orange | Orange | 55 | SB | | | 4.74 | | SB | 33.6778 | -117.881528 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | SB | 33.67355 | -117.886206 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 37 | 2025-01-14 15:12:20 | 1736896340 | 2025-01-23 21:01:17 | 1737694877 | 2025-01-24 04:59:17 | 1737723557 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55NA | 20 | 2024-12-26 15:30:20 | 1735255820 | 2025-01-23 21:01:18 | 1737694878 | 2025-01-24 04:59:18 | 1737723558 | N | Orange | Orange | 55 | NB | | | 10.98 | | NB | 33.741007 | -117.833684 | 10.792 | Costa Mesa Frwy, Rte 55 | | | | 10.98 | | NB | 33.741007 | -117.833692 | 95.252 | Fourth St/ Irvine Blvd | | Off Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55DA | 25 | 2025-01-14 15:05:22 | 1736895922 | 2025-01-23 21:01:19 | 1737694879 | 2025-01-24 04:59:19 | 1737723559 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C405MA | 8 | 2025-01-14 13:54:21 | 1736891661 | 2025-01-23 21:01:19 | 1737694879 | 2025-01-24 04:59:19 | 1737723559 | N | Orange | Orange | 405 | NB | | | 8.74 | | NB | 33.686947 | -117.865954 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | SB | 33.686912 | -117.865938 | 8.51 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C133ZA | 5 | 2025-01-14 13:56:23 | 1736891783 | 2025-01-23 21:01:20 | 1737694880 | 2025-01-24 04:59:20 | 1737723560 | N | Orange | Orange | 133 | SB | | | 9.565 | | SB | 33.680719 | -117.749618 | 9.579 | Laguna Cyn Frwy, Rte 133 | | | | 9.565 | | NB | 33.680717 | -117.749615 | 9.579 | Santa Ana Frwy, Rte 5 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 81 | 2025-01-17 15:25:27 | 1737156327 | 2025-01-23 21:01:25 | 1737694885 | 2025-01-24 04:59:25 | 1737723565 | N | Orange | Orange | 55 | N/A | | | 6.99 | | EB | 33.698013 | -117.860472 | | Macarthur Blvd | | | | 6.99 | | | 33.698013 | -117.860472 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C405CA | 54 | 2025-01-13 20:18:26 | 1736828306 | 2025-01-23 21:01:26 | 1737694886 | 2025-01-24 04:59:26 | 1737723566 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 4, 5, RShoulder | 5 | N | | | N | | | N | | | N C73XA | 15 | 2024-12-26 14:56:28 | 1735253788 | 2025-01-23 21:01:26 | 1737694886 | 2025-01-24 04:59:26 | 1737723566 | N | Orange | Orange | 73 | NB | | | 26.581 | | NB | 33.670641 | -117.883362 | | RTE. 73 | | | | 26.581 | | SB | 33.670573 | -117.883338 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405MA | 4 | 2025-01-14 12:57:30 | 1736888250 | 2025-01-23 21:01:28 | 1737694888 | 2025-01-24 04:59:28 | 1737723568 | N | Orange | Orange | 405 | SB | | | 8.74 | | SB | 33.687112 | -117.879621 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.687085 | -117.879573 | 8.51 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5IC | 10 | 2024-12-26 15:35:33 | 1735256133 | 2025-01-23 21:01:30 | 1737694890 | 2025-01-24 04:59:30 | 1737723570 | N | Orange | Orange | 5 | NB | | | 30.28 | | NB | 33.739449 | -117.829518 | 102.335 | Santa Ana Fwy, Freeway I-5 | | | | 30.28 | | NB | 33.739369 | -117.829459 | 95.252 | Route 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 36 | 2024-12-26 16:28:35 | 1735259315 | 2025-01-23 21:01:33 | 1737694893 | 2025-01-24 04:59:33 | 1737723573 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55DA | 15 | 2025-01-08 15:50:36 | 1736380236 | 2025-01-23 21:01:34 | 1737694894 | 2025-01-24 04:59:34 | 1737723574 | N | Orange | Orange | 55 | SB | | | 9.96 | | SB | 33.730323 | -117.834116 | | Mcfadden St | | | | 9.96 | | SB | 33.730323 | -117.834116 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Concrete Pour | | All | 2 | N | | | N | | | N | | | N C405CA | 76 | 2025-01-15 15:44:37 | 1736984677 | 2025-01-23 21:01:35 | 1737694895 | 2025-01-23 23:59:35 | 1737705575 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Highway Construction | | 4, RShoulder | 4 | N | | | N | | | N | | | N C55NA | 10 | 2024-12-26 14:25:41 | 1735251941 | 2025-01-23 21:01:39 | 1737694899 | 2025-01-24 04:59:39 | 1737723579 | N | Orange | Orange | 55 | NB | | | 4.74 | | NB | 33.67044 | -117.889523 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | NB | 33.670387 | -117.889553 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 10 | 2024-12-26 14:27:44 | 1735252064 | 2025-01-23 21:01:41 | 1737694901 | 2025-01-24 04:59:41 | 1737723581 | N | Orange | Orange | 73 | NB | | | 9.44 | | NB | 33.670498 | -117.889478 | | RTE. 73 | | | | 9.44 | | NB | 33.670481 | -117.889456 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405MA | 12 | 2025-01-14 14:18:45 | 1736893125 | 2025-01-23 21:01:42 | 1737694902 | 2025-01-24 04:59:42 | 1737723582 | N | Orange | Orange | 405 | NB | | | 8.74 | | NB | 33.686966 | -117.865938 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.686946 | -117.865905 | 9.579 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55NA | 5 | 2024-12-26 14:11:45 | 1735251105 | 2025-01-23 21:01:43 | 1737694903 | 2025-01-24 04:59:43 | 1737723583 | N | Orange | Orange | 55 | NB | | | 4.737 | | NB | 33.66815 | -117.892307 | 0 | Costa Mesa Frwy, Rte 55 | | | | 4.737 | | SB | 33.668114 | -117.892308 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5IC | 5 | 2024-12-26 15:09:50 | 1735254590 | 2025-01-23 21:01:48 | 1737694908 | 2025-01-24 04:59:48 | 1737723588 | N | Orange | Orange | 5 | SB | | | 23.19 | | SB | 33.680593 | -117.749709 | 95.189 | Santa Ana Fwy, Freeway I-5 | | | | 23.19 | | NB | 33.68057 | -117.749716 | 95.252 | Route 133 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 84 | 2025-01-17 15:26:52 | 1737156412 | 2025-01-23 21:01:49 | 1737694909 | 2025-01-24 04:59:49 | 1737723589 | N | Orange | Orange | 55 | NB | | | 6.99 | | NB | 33.695964 | -117.863695 | | Costa Mesa Frwy, Rte 55 | | | | 6.99 | | NB | 33.695852 | -117.863721 | | Macarthur Blvd | | Off Ramp | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C405CA | 42 | 2025-01-13 20:16:51 | 1736828211 | 2025-01-23 21:01:51 | 1737694911 | 2025-01-24 05:59:51 | 1737727191 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 4, RShoulder | 4 | N | | | N | | | N | | | N C5IC | 23 | 2025-01-16 17:28:58 | 1737077338 | 2025-01-23 21:01:55 | 1737694915 | 2025-01-24 04:59:55 | 1737723595 | N | Orange | Orange | 5 | NB | | | 21.304 | | NB | 33.638633 | -117.729853 | 93.303 | Santa Ana Fwy, Freeway I-5 | | | | 21.304 | | NB | 33.638615 | -117.729837 | 93.366 | 405/5 JCT | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 20 | 2024-12-26 15:00:01 | 1735254001 | 2025-01-23 21:01:59 | 1737694919 | 2025-01-24 04:59:59 | 1737723599 | N | Orange | Orange | 73 | SB | | | 26.581 | | SB | 33.668498 | -117.881491 | | RTE. 73 | | | | 26.581 | | SB | 33.668409 | -117.881469 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C91WA | 20 | 2025-01-10 14:55:30 | 1736549730 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 91 | WB | | R | 1.842 | | | 33.856105 | -118.010181 | 16.581 | Knott Ave | | | R | .848 | | | 33.856946 | -118.028842 | 16.581 | Valley View St | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C91WA | 22 | 2025-01-10 14:59:58 | 1736549998 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 91 | WB | | R | 1.842 | | NB | 33.856396 | -118.011063 | 16.581 | Knott Ave | | | R | 1.842 | | WB | 33.856085 | -118.011457 | 16.581 | Artesia Frwy, Rte 91 | | On Ramp | Full | Standard | Loop Detector and Cabinet Swap | | All | 4 | N | | | N | | | N | | | N C90FA | 10 | 2025-01-02 19:02:02 | 1735873322 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 90 | EB | | | 6.58 | | | 33.910889 | -117.869691 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.910987 | -117.862862 | 9.126 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 2, L T Lane 1, 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C22HA | 8 | 2025-01-08 12:36:38 | 1736368598 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 22 | WB | | R | 12.88 | | WB | 33.777798 | -117.835962 | 14.451 | Tustin Ave | | | R | 11.83 | | WB | 33.776737 | -117.840448 | 13.391 | Garden Grove Fwy, Rte. 22 | | On Ramp | Full | Standard | Highway Construction | | All | 2 | N | | | N | | | N | | | N C22HA | 7 | 2025-01-08 12:35:18 | 1736368518 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 22 | WB | | R | 12.88 | | | 33.777271 | -117.836307 | 14.451 | Tustin Ave | | | R | 11.83 | | | 33.775412 | -117.84986 | 13.391 | Glassell St / Grand aver | | Mainline | Lane | Standard | Highway Construction | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C90FA | 15 | 2025-01-02 19:06:02 | 1735873562 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 90 | WB | | | 6.58 | | | 33.911212 | -117.858815 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911143 | -117.864477 | 9.126 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C57MA | 10 | 2025-01-02 18:57:33 | 1735873053 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 57 | SB | | | 19.86 | | EB | 33.911135 | -117.886347 | 9.211 | Imperial Hwy, Hwy 90 | | | | 19.86 | | SB | 33.908491 | -117.88291 | 9.126 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C90FA | 20 | 2025-01-02 19:10:14 | 1735873814 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 90 | WB | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C90FA | 25 | 2025-01-02 19:16:26 | 1735874186 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 90 | N/A | | | 6.58 | | NB | 33.911537 | -117.863663 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911537 | -117.863663 | 9.402 | Imperial Hwy, Rte. 90 | | Surface Street | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, RShoulder, Sidewalk | 2 | N | | | N | | | N | | | N C55NA | 36 | 2025-01-14 14:26:39 | 1736893599 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C1JA | 22 | 2025-01-14 13:21:08 | 1736889668 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 1 | SB | | | 10.16 | | | 33.54718 | -117.796847 | 6.244 | Wave St | Ledroit St | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 36 | 2025-01-14 13:23:11 | 1736889791 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 1 | SB | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 8.21 | | | 33.529402 | -117.772121 | 4.294 | Agate St | Ruby St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C405IC | 8 | 2025-01-16 17:19:02 | 1737076742 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C22PA | 9 | 2024-12-30 08:09:58 | 1735574998 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 22 | WB | | R | 2.65 | | | 33.774549 | -118.007811 | 4.117 | Knott Ave / Garden Grove Blvd | | | R | .92 | | | 33.77465 | -118.037626 | 4.907 | Valley View St | | Mainline | Lane | Standard | K-rail Installation | | HOV, 1 | 3 | N | | | N | | | N | | | N C91WA | 23 | 2025-01-10 15:02:23 | 1736550143 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 91 | WB | | R | 1.842 | | SB | 33.856624 | -118.011392 | 16.581 | Knott Ave | | | R | 1.842 | | WB | 33.856165 | -118.014354 | 16.581 | Artesia Frwy, Rte 91 | | On Ramp | Full | Standard | Loop Detector and Cabinet Swap | | All | 1 | N | | | N | | | N | | | N C57MA | 5 | 2025-01-02 18:47:12 | 1735872432 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C90FA | 5 | 2025-01-02 18:52:25 | 1735872745 | 2025-01-23 22:01:00 | 1737698460 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 90 | EB | | | 5.19 | | | 33.911731 | -117.887813 | 8.014 | State College Blvd | | | | 5.331 | | | 33.910978 | -117.885507 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C1JA | 14 | 2025-01-14 13:19:08 | 1736889548 | 2025-01-23 22:01:06 | 1737698466 | 2025-01-24 04:59:06 | 1737723546 | N | Orange | Orange | 1 | NB | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 10.16 | | | 33.547267 | -117.796819 | 6.244 | Wave St | Ledroit St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C5LA | 26 | 2025-01-15 11:24:10 | 1736969050 | 2025-01-23 22:01:07 | 1737698467 | 2025-01-24 05:59:07 | 1737727147 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.76 | Crown Valley Pkwy | | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.842 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C405CA | 46 | 2025-01-13 20:17:10 | 1736828230 | 2025-01-23 22:01:09 | 1737698469 | 2025-01-24 04:59:09 | 1737723549 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y P5FA | 8 | 2025-01-14 07:25:20 | 1736868320 | 2025-01-23 22:01:18 | 1737698478 | 2025-01-24 04:59:18 | 1737723558 | N | Orange | Orange | 5 | N/A | | | 23.94 | | SB | 33.678752 | -117.75716 | | Sand Cyn Rd | | | | 23.94 | | | 33.678752 | -117.75716 | | Santa Ana Fwy, Freeway I-5 | | Surface Street | Lane | Standard | Permit Work | 5 | L T Lane 1 | 3 | N | | | N | | | N | | | N P57EA | 5 | 2025-01-13 16:55:22 | 1736816122 | 2025-01-23 22:01:19 | 1737698479 | 2025-01-24 04:59:19 | 1737723559 | N | Orange | Orange | 57 | N/A | | | 12.54 | | EB | 33.805764 | -117.883051 | 1.849 | Katella Ave | East of Howell Ave. (Stage 1F) | | | 12.54 | | | 33.805764 | -117.883051 | 1.806 | Orange Frwy, Rte 57 | East of Douglass Rd. | Surface Street | Lane | Standard | Permit Work | | 1, 2 | 3 | N | | | N | | | N | | | N C5LA | 34 | 2025-01-15 11:28:27 | 1736969307 | 2025-01-23 22:01:25 | 1737698485 | 2025-01-24 05:59:25 | 1737727165 | N | Orange | Orange | 5 | SB | | | 12.94 | | SB | 33.547257 | -117.673473 | 84.92 | Avery Pkwy | | | | 12.94 | | SB | 33.547257 | -117.673473 | 85.002 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C55DA | 41 | 2025-01-14 15:12:31 | 1736896351 | 2025-01-23 22:01:28 | 1737698488 | 2025-01-24 03:59:28 | 1737719968 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y P5FA | 4 | 2025-01-14 07:24:29 | 1736868269 | 2025-01-23 22:01:28 | 1737698488 | 2025-01-24 04:59:28 | 1737723568 | N | Orange | Orange | 5 | N/A | | | 23.94 | | NB | 33.676518 | -117.759594 | | Sand Cyn Rd | | | | 23.94 | | | 33.676518 | -117.759594 | | Santa Ana Fwy, Freeway I-5 | | Surface Street | Lane | Standard | Permit Work | 5 | 3 | 3 | N | | | N | | | N | | | N P5FA | 12 | 2025-01-14 07:28:31 | 1736868511 | 2025-01-23 22:01:30 | 1737698490 | 2025-01-24 04:59:30 | 1737723570 | N | Orange | Orange | 5 | SB | | | 23.94 | | SB | 33.67841 | -117.759519 | | Santa Ana Fwy, Freeway I-5 | | | | 23.94 | | | 33.677727 | -117.758033 | | Sand Cyn Rd | | Off Ramp | Lane | Standard | Permit Work | 5 | L T Lane 2, R T Lane 2 | 1 | N | | | N | | | N | | | N C55DA | 29 | 2025-01-14 15:05:38 | 1736895938 | 2025-01-23 22:01:36 | 1737698496 | 2025-01-24 03:59:36 | 1737719976 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C1JA | 18 | 2025-01-14 13:19:42 | 1736889582 | 2025-01-23 22:01:39 | 1737698499 | 2025-01-24 04:59:39 | 1737723579 | N | Orange | Orange | 1 | NB | | | 8.21 | | | 33.529474 | -117.772042 | 4.294 | Agate St | Ruby St | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C405CA | 58 | 2025-01-13 20:18:45 | 1736828325 | 2025-01-23 22:01:44 | 1737698504 | 2025-01-24 04:59:44 | 1737723584 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 3, 4, 5, RShoulder | 5 | N | | | N | | | N | | | Y C57AA | 3 | 2025-01-13 12:07:47 | 1736798867 | 2025-01-23 22:01:45 | 1737698505 | 2025-01-24 04:59:45 | 1737723585 | N | Orange | Orange | 57 | SB | | R | 22.55 | | | 33.945989 | -117.868735 | 11.901 | ORANGE-LA CO LINE | | | | 11.24 | | | 33.787909 | -117.880101 | .591 | Chapman Ave ( city of orange ) | | Mainline | Lane | Standard | Striping Operation | | HOV, 1, 2, 3 | 5 | N | | | N | | | N | | | Y C405CA | 77 | 2025-01-15 15:44:51 | 1736984691 | 2025-01-23 22:01:48 | 1737698508 | 2025-01-23 23:59:48 | 1737705588 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Highway Construction | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C405CA | 73 | 2025-01-15 05:56:53 | 1736949413 | 2025-01-23 23:01:00 | 1737702060 | 2025-01-23 23:59:00 | 1737705540 | N | Orange | Orange | 405 | SB | | | .95 | | SB | 33.648803 | -117.750489 | .72 | San Diego Frwy, Rte 405 | | | | .95 | | | 33.646927 | -117.746584 | .72 | Irvine Center Dr | icd1 | Off Ramp | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | N C405CA | 69 | 2025-01-13 20:26:45 | 1736828805 | 2025-01-23 23:01:00 | 1737702060 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 405 | NB | | | 5.62 | | SB | 33.671023 | -117.821426 | 5.39 | Culver Dr | cu3 | | | 5.62 | | NB | 33.670646 | -117.825486 | 5.39 | San Diego Frwy, Rte 405 | | On Ramp | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | N C91WA | 21 | 2025-01-10 14:57:02 | 1736549822 | 2025-01-23 23:01:00 | 1737702060 | 2025-01-24 02:59:00 | 1737716340 | N | Orange | Orange | 91 | WB | | R | 1.842 | | | 33.856194 | -118.008014 | 16.581 | Knott Ave | | | R | .848 | | | 33.856946 | -118.028842 | 16.581 | Valley View St | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C5MA | 4 | 2025-01-06 12:13:03 | 1736194383 | 2025-01-23 23:01:01 | 1737702061 | 2025-01-24 04:59:01 | 1737723541 | N | Orange | Orange | 5 | NB | | | 28.25 | | NB | 33.725239 | -117.802745 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C405CA | 78 | 2025-01-15 15:45:05 | 1736984705 | 2025-01-23 23:01:03 | 1737702063 | 2025-01-23 23:59:03 | 1737705543 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Highway Construction | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C5MA | 14 | 2025-01-06 12:19:09 | 1736194749 | 2025-01-23 23:01:07 | 1737702067 | 2025-01-24 04:59:07 | 1737723547 | N | Orange | Orange | 5 | SB | | | 29.61 | | SB | 33.741509 | -117.836571 | 101.602 | Santa Ana Fwy, Freeway I-5 | | | | 29.61 | | | 33.73749 | -117.825956 | 101.602 | Newport Ave | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5FC | 30 | 2025-01-14 12:41:20 | 1736887280 | 2025-01-23 23:01:18 | 1737702078 | 2025-01-24 04:59:18 | 1737723558 | N | Orange | Orange | 5 | NB | | | 17.47 | | WB | 33.606284 | -117.690224 | 89.513 | Alicia Pkwy | AP-6 - WB Alicia Pkwy to NB I-5 Fwy | | | 17.47 | | NB | 33.606677 | -117.693571 | 90.752 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | N C405CA | 50 | 2025-01-13 20:17:25 | 1736828245 | 2025-01-23 23:01:25 | 1737702085 | 2025-01-24 03:59:25 | 1737719965 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C5FC | 26 | 2025-01-14 12:40:36 | 1736887236 | 2025-01-23 23:01:33 | 1737702093 | 2025-01-24 04:59:33 | 1737723573 | N | Orange | Orange | 5 | NB | | | 17.47 | | EB | 33.605205 | -117.690153 | 89.513 | Alicia Pkwy | AP-5: EB Alicia Pkwy to NB I-5 On Ramp | | | 17.47 | | NB | 33.604642 | -117.690389 | 90.752 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | N C55DA | 45 | 2025-01-14 15:12:44 | 1736896364 | 2025-01-23 23:01:42 | 1737702102 | 2025-01-24 02:59:42 | 1737716382 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 33 | 2025-01-14 15:05:55 | 1736895955 | 2025-01-23 23:01:53 | 1737702113 | 2025-01-24 02:59:53 | 1737716393 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C5LA | 10 | 2025-01-15 11:17:56 | 1736968676 | 2025-01-23 23:01:54 | 1737702114 | 2025-01-24 01:59:54 | 1737712794 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C5FC | 22 | 2025-01-14 12:39:57 | 1736887197 | 2025-01-23 23:01:55 | 1737702115 | 2025-01-24 04:59:55 | 1737723595 | N | Orange | Orange | 5 | NB | | | 17.47 | | NB | 33.602551 | -117.68657 | 89.513 | Santa Ana Fwy, Freeway I-5 | AP-4 NB I-5 to Alicia Pkwy Off Ramp | | | 17.47 | | NB | 33.604633 | -117.6904 | 90.752 | Alicia Pkwy | | Off Ramp | Full | Standard | Pavement Repair | | All | 1 | N | | | N | | | N | | | N C5MA | 9 | 2025-01-06 12:15:58 | 1736194558 | 2025-01-23 23:01:56 | 1737702116 | 2025-01-24 04:59:56 | 1737723596 | N | Orange | Orange | 5 | SB | | | 28.25 | | SB | 33.7283 | -117.808281 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5FC | 18 | 2025-01-14 12:38:00 | 1736887080 | 2025-01-23 23:01:58 | 1737702118 | 2025-01-24 04:59:58 | 1737723598 | N | Orange | Orange | 5 | NB | | | 17.47 | | | 33.604633 | -117.6904 | 89.513 | Alicia Pkwy | | | | 18.69 | | | 33.614705 | -117.707387 | 90.752 | El Toro Rd | | Mainline | Lane | Standard | Landscape Work | | 4, 5, Auxiliary | 5 | N | | | N | | | N | | | N C405CA | 80 | 2025-01-15 15:46:48 | 1736984808 | 2025-01-23 23:59:00 | 1737705540 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Highway Construction | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N C405CA | 79 | 2025-01-15 15:46:34 | 1736984794 | 2025-01-23 23:59:00 | 1737705540 | 2025-01-24 03:59:00 | 1737719940 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Highway Construction | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C133UA | 1 | 2025-01-15 15:52:54 | 1736985174 | 2025-01-23 23:59:00 | 1737705540 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 133 | NB | | | 8.376 | | NB | 33.649578 | -117.760576 | 8.39 | Laguna Cyn Frwy, Rte 133 | c8 | | | 8.376 | | SB | 33.650659 | -117.75742 | 8.39 | San Diego Frwy, Rte 405 | | Connector | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | Y C405CA | 62 | 2025-01-13 20:22:52 | 1736828572 | 2025-01-23 23:59:00 | 1737705540 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 405 | NB | | | 1.8 | | NB | 33.651709 | -117.75942 | 1.57 | San Diego Frwy, Rte 405 | | | | 1.8 | | SB | 33.652477 | -117.761105 | 1.57 | Laguna Frwy, Rte 133 | c4 | Connector | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | Y C55NA | 24 | 2025-01-14 13:58:29 | 1736891909 | 2025-01-23 23:59:00 | 1737705540 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 55 | NB | | | 5.99 | | NB | 33.682922 | -117.876241 | | Costa Mesa Frwy, Rte 55 | | | | 5.99 | | SB | 33.682924 | -117.876229 | 9.579 | San Diego Frwy, Rte 405 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405EA | 8 | 2025-01-13 11:18:12 | 1736795892 | 2025-01-23 23:59:10 | 1737705550 | 2025-01-24 04:59:10 | 1737723550 | N | Orange | Orange | 405 | NB | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y C405EA | 5 | 2025-01-13 11:17:22 | 1736795842 | 2025-01-23 23:59:20 | 1737705560 | 2025-01-24 04:59:20 | 1737723560 | N | Orange | Orange | 405 | SB | | | 23.98 | | SB | 33.787777 | -118.095965 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.789498 | -118.088734 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y P73IA | 4 | 2025-01-18 17:10:31 | 1737249031 | 2025-01-24 00:30:00 | 1737707400 | 2025-01-24 04:59:00 | 1737723540 | N | Orange | Orange | 73 | N/A | | R | 26.791 | | NB | 33.672985 | -117.888671 | 16.744 | BRISTOL & Randolph Ave | | | R | 26.791 | | | 33.672985 | -117.888671 | 16.744 | RTE. 73 | | Surface Street | Lane | Standard | Permit Work | 5 | 3 | 3 | N | | | N | | | N | | | N C5LA | 30 | 2025-01-15 11:24:48 | 1736969088 | 2025-01-24 02:01:00 | 1737712860 | 2025-01-24 05:59:00 | 1737727140 | N | Orange | Orange | 5 | SB | | | 12.94 | | SB | 33.55031 | -117.67299 | 84.92 | Santa Ana Fwy, Freeway I-5 | | | | 12.94 | | SB | 33.55031 | -117.67299 | 85.842 | Avery Pkwy | | Off Ramp | Full | Standard | Striping Operation | | All | 4 | N | | | N | | | N | | | N C57TA | 12 | 2025-01-13 13:20:09 | 1736803209 | 2025-01-24 02:01:07 | 1737712867 | 2025-01-24 06:59:07 | 1737730747 | N | Orange | Orange | 57 | SB | | | 19.86 | | | 33.908607 | -117.882794 | 9.211 | Imperial Hwy, Hwy 90 | Loc 23-24 SB | | | 18.34 | | | 33.901244 | -117.880963 | 4.866 | Yorba linda Blvd | | Mainline | Lane | Standard | Bridge Work | | HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C5LA | 38 | 2025-01-15 11:29:15 | 1736969355 | 2025-01-24 02:01:13 | 1737712873 | 2025-01-24 05:59:13 | 1737727153 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.791 | Santa Ana Fwy, Freeway I-5 | | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.002 | Crown Valley Pkwy | | Off Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C5LA | 15 | 2025-01-15 11:18:48 | 1736968728 | 2025-01-24 02:01:46 | 1737712906 | 2025-01-24 04:59:46 | 1737723586 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C57TA | 11 | 2025-01-13 13:19:51 | 1736803191 | 2025-01-24 02:01:48 | 1737712908 | 2025-01-24 04:59:48 | 1737723588 | N | Orange | Orange | 57 | SB | | | 19.86 | | | 33.908607 | -117.882794 | 9.211 | Imperial Hwy, Hwy 90 | Loc 23-24 SB | | | 18.34 | | | 33.901244 | -117.880963 | 4.866 | Yorba linda Blvd | | Mainline | Lane | Standard | Bridge Work | | HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C5LA | 20 | 2025-01-15 11:19:00 | 1736968740 | 2025-01-24 02:01:58 | 1737712918 | 2025-01-24 05:59:58 | 1737727198 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C1SA | 5 | 2025-01-13 08:26:48 | 1736785608 | 2025-01-24 06:01:46 | 1737727306 | 2025-01-24 13:59:46 | 1737755986 | N | Orange | Orange | 1 | NB | | | 17.43 | | | 33.613139 | -117.891514 | | Jamboree Rd | | | | 18.07 | | | 33.616186 | -117.908206 | | Bayside Dr | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N C1JA | 32 | 2025-01-14 13:22:02 | 1736889722 | 2025-01-24 08:01:00 | 1737734460 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 1 | SB | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 8.21 | | | 33.529402 | -117.772121 | 4.294 | Agate St | Ruby St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C1JA | 27 | 2025-01-14 13:21:31 | 1736889691 | 2025-01-24 08:01:29 | 1737734489 | 2025-01-24 14:59:29 | 1737759569 | N | Orange | Orange | 1 | SB | | | 10.16 | | | 33.54718 | -117.796847 | 6.244 | Wave St | Ledroit St | | | 9.42 | | | 33.542748 | -117.785366 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Loop Detector and Cabinet Swap | | 1 | 2 | N | | | N | | | N | | | Y C39EA | 5 | 2025-01-13 13:45:51 | 1736804751 | 2025-01-24 08:30:00 | 1737736200 | 2025-01-24 15:30:00 | 1737761400 | N | Orange | Orange | 39 | NB | | | 11.18 | | | 33.810162 | -117.993112 | 11.18 | Cerritos Ave | | | | 11.68 | | | 33.817432 | -117.993184 | 11.68 | Ball Rd | | Conventional Hwy | Lane | Standard | Utility Work | | 1, 2 | 4 | N | | | N | | | N | | | Y C1SA | 20 | 2025-01-13 08:29:04 | 1736785744 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 15:30:00 | 1737761400 | N | Orange | Orange | 1 | SB | | | 18.07 | | | 33.616223 | -117.902259 | | Bayside Dr | | | | 17.43 | | | 33.613221 | -117.894152 | 28.814 | Jamboree Rd | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N C90FA | 40 | 2025-01-13 19:29:51 | 1736825391 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 90 | EB | | | 6.58 | | | 33.910889 | -117.869691 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.910987 | -117.862862 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, 1, 2, 3 | 3 | N | | | N | | | N | | | Y C90FA | 30 | 2025-01-13 04:39:44 | 1736771984 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 90 | EB/WB | | | 5.331 | | | 33.911032 | -117.885496 | | State College Blvd | | | | 5.331 | | | 33.910988 | -117.885464 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Striping Operation | 1 | 1, 2, 3 | 3 | N | | | N | | | N | | | Y C57MA | 15 | 2025-01-13 04:45:47 | 1736772347 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Alternating Lanes | Standard | Striping Operation | 1 | L T Lane 1, 1, R T Lane 1 | 3 | N | | | N | | | N | | | N C90FA | 35 | 2025-01-13 19:26:33 | 1736825193 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 90 | WB | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3 | 3 | N | | | N | | | N | | | Y C57MA | 20 | 2025-01-13 19:33:32 | 1736825612 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 57 | SB | | | 19.86 | | EB | 33.911135 | -117.886347 | 9.211 | Imperial Hwy, Hwy 90 | | | | 19.86 | | SB | 33.908491 | -117.88291 | 9.402 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C1JA | 10 | 2025-01-14 13:17:30 | 1736889450 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 15:59:00 | 1737763140 | N | Orange | Orange | 1 | NB | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | | | 10.16 | | | 33.547267 | -117.796819 | 6.244 | Wave St | Ledroit St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | N | | | N | | | N | | | Y C405MC | 6 | 2025-01-16 15:51:12 | 1737071472 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 15:01:00 | 1737759660 | N | Orange | Orange | 405 | NB | | | 13.78 | | | 33.705441 | -117.954355 | 13.55 | Brookhurst St | | | | 14.82 | | | 33.716026 | -117.966943 | 14.59 | Warner Ave | NB 405 Fwy | Mainline | Lane | Standard | Permit Work | | RShoulder | 5 | N | | | N | | | N | | | N P133GA | 12 | 2025-01-10 13:57:02 | 1736546222 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 133 | NB | | | .962 | | | 33.568066 | -117.763633 | .962 | Canyon Acres Dr | Before Stan Oaks Dr | | | 3.416 | | | 33.571578 | -117.762993 | 3.416 | El Toro Rd | Past Raquel Rd | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1, RShoulder | 1 | N | | | N | | | N | | | N X5GA | 1 | 2025-01-15 10:47:21 | 1736966841 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 15:01:00 | 1737759660 | N | Orange | Orange | 5 | NB | | | 31.77 | | NB | 33.753134 | -117.848007 | 103.825 | Santa Ana Fwy, Freeway I-5 | | | | 31.77 | | | 33.754334 | -117.851681 | 103.825 | Grand Ave. / Santa Ana Blvd. HOV Ramp | | Off Ramp | Full | Standard | Guardrail Repair | | All | 1 | N | | | N | | | N | | | N C1LA | 5 | 2025-01-16 13:38:40 | 1737063520 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 13:59:00 | 1737755940 | N | Orange | Orange | 1 | NB | | | 6.47 | | | 33.508465 | -117.750123 | 2.554 | Aliso Way | Closure starts at Camel Pt. | | | 7.35 | | | 33.52085 | -117.761361 | 3.434 | Nyes Pl | Closure ends at Hinkle | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y C1LA | 10 | 2025-01-16 13:41:20 | 1737063680 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 13:59:00 | 1737755940 | N | Orange | Orange | 1 | SB | | | 6.47 | | | 33.505337 | -117.746863 | 2.554 | Aliso Way | Bluff Dr. is where closure starts | | | 5.73 | | | 33.5049 | -117.746412 | 1.814 | 3RD AVE | Closure ends south of Bluff. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y C1LA | 15 | 2025-01-16 14:10:34 | 1737065434 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 13:59:00 | 1737755940 | N | Orange | Orange | 1 | SB | | | 5.73 | | | 33.500948 | -117.743359 | 1.814 | 3RD AVE | Closure starts at 5th Ave. | | | 5.5 | | | 33.4994 | -117.741967 | 1.584 | 7th Ave / Circle Dr | Closure ends at 7th Ave. | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | 0 | 2 | 2 | N | | | N | | | N | | | Y P73IA | 3 | 2025-01-16 13:48:22 | 1737064102 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 73 | NB | | | 13.4 | | NB | 33.567424 | -117.697879 | 3.4 | RTE. 73 | | | | 13.4 | | | 33.573555 | -117.7058 | 3.4 | La Paz Rd | | Off Ramp | Full | Standard | Permit Work | 5 | All | 1 | N | | | N | | | N | | | N P39GA | 17 | 2025-01-14 12:23:42 | 1736886222 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 39 | SB | | | 9.67 | | | 33.786448 | -117.993044 | 9.67 | Chapman Ave | South of Chapman Ave. (Sheet 5) | | | 9.17 | | | 33.781088 | -117.992999 | 9.17 | Lampson Ave | North of Lampson Ave. | Conventional Hwy | Lane | Standard | Permit Work | | 4 | 4 | N | | | N | | | N | | | N C90FA | 45 | 2025-01-13 19:31:49 | 1736825509 | 2025-01-24 09:01:00 | 1737738060 | 2025-01-24 14:59:00 | 1737759540 | N | Orange | Orange | 90 | WB | | | 6.58 | | | 33.911212 | -117.858815 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911143 | -117.864477 | 9.402 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3 | 3 | N | | | N | | | N | | | Y C1SA | 30 | 2025-01-13 08:31:13 | 1736785873 | 2025-01-24 09:01:12 | 1737738072 | 2025-01-24 15:30:12 | 1737761412 | N | Orange | Orange | 1 | NB | | | 24.72 | | | 33.656826 | -118.001371 | 20.814 | MAIN ST (DOWN TOWN) | | | | 25.72 | | | 33.666651 | -118.015045 | 28.814 | 10th st | 17th Street | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1SA | 15 | 2025-01-13 08:28:14 | 1736785694 | 2025-01-24 09:01:12 | 1737738072 | 2025-01-24 15:30:12 | 1737761412 | N | Orange | Orange | 1 | NB | | | 32.72 | | | 33.74105 | -118.095638 | 25.41 | Seal Beach Blvd | | | | 33.72 | | | 33.749903 | -118.105868 | 28.814 | Orange / Los Angeles County Line | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1JA | 5 | 2025-01-14 13:15:20 | 1736889320 | 2025-01-24 09:01:18 | 1737738078 | 2025-01-24 15:59:18 | 1737763158 | N | Orange | Orange | 1 | NB | | | 8.21 | | | 33.529474 | -117.772042 | 4.294 | Agate St | Ruby St | | | 9.42 | | | 33.542763 | -117.785358 | 5.504 | Broadway St, Rte 133 | Broadway St | Conventional Hwy | Lane | Standard | Miscellaneous Work | | 2 | 2 | N | | | N | | | N | | | Y P39GA | 15 | 2025-01-13 16:50:22 | 1736815822 | 2025-01-24 09:01:19 | 1737738079 | 2025-01-24 14:59:19 | 1737759559 | N | Orange | Orange | 39 | NB | | | 22.66 | | | 33.939034 | -117.934656 | 20.88 | Harbor Blvd | West of Harbor Blvd. | | | 23.2 | | | 33.939055 | -117.933084 | | End County | Harbor Blvd. | Conventional Hwy | Lane | Standard | Permit Work | | L T Lane 2, R T Lane 1 | 2 | N | | | N | | | N | | | N P57EA | 9 | 2025-01-15 14:10:24 | 1736979024 | 2025-01-24 09:01:21 | 1737738081 | 2025-01-24 14:59:21 | 1737759561 | N | Orange | Orange | 57 | SB | | | 17.57 | | | 33.878018 | -117.88121 | 6.921 | Nutwood Ave | | | | 17.57 | | SB | 33.874406 | -117.881097 | 6.921 | Orange Frwy, Rte 57 | E Chapman Ave. | On Ramp | Lane | Standard | Permit Work | | 2 | 2 | N | | | N | | | N | | | N P57EA | 13 | 2025-01-15 14:13:24 | 1736979204 | 2025-01-24 09:01:21 | 1737738081 | 2025-01-24 14:59:21 | 1737759561 | N | Orange | Orange | 57 | N/A | | | 17.57 | | WB | 33.878135 | -117.880635 | 6.879 | Nutwood Ave | | | | 17.57 | | | 33.878135 | -117.880635 | 6.879 | Orange Frwy, Rte 57 | | Surface Street | Lane | Standard | Permit Work | | L T Lane 1 | 2 | N | | | N | | | N | | | N C1SA | 10 | 2025-01-13 08:27:26 | 1736785646 | 2025-01-24 09:01:24 | 1737738084 | 2025-01-24 15:30:24 | 1737761424 | N | Orange | Orange | 1 | NB | | | 29.89 | | | 33.728225 | -118.082819 | 22.58 | Warner Ave | Phillips St | | | 32.72 | | | 33.740818 | -118.095271 | 28.814 | Seal Beach Blvd | | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y P405CA | 5 | 2025-01-13 17:00:36 | 1736816436 | 2025-01-24 09:01:33 | 1737738093 | 2025-01-24 14:59:33 | 1737759573 | N | Orange | Orange | 405 | NB | | | 11.45 | | NB | 33.68844 | -117.913119 | 11.22 | San Diego Frwy, Rte 405 | | | | 11.45 | | NB | 33.689242 | -117.919105 | 11.22 | Harbor Blvd | | Off Ramp | Lane | Standard | Permit Work | | RShoulder | 2 | N | | | N | | | N | | | N P133GA | 10 | 2025-01-10 13:49:37 | 1736545777 | 2025-01-24 09:01:35 | 1737738095 | 2025-01-24 14:59:35 | 1737759575 | N | Orange | Orange | 133 | NB | | | 3.416 | | | 33.57939 | -117.761997 | 3.416 | El Toro Rd | Before Willow Canyon Rd | | | 3.416 | | | 33.581912 | -117.761245 | 3.416 | El Toro Rd | | Conventional Hwy | Lane | Standard | Permit Work | | RShoulder | 1 | N | | | N | | | N | | | N P39GA | 22 | 2025-01-15 13:37:39 | 1736977059 | 2025-01-24 09:01:37 | 1737738097 | 2025-01-24 14:59:37 | 1737759577 | N | Orange | Orange | 39 | NB | | | 20.17 | | | 33.930897 | -117.967736 | 18.39 | La Habra Blvd | South of La Habra Blvd. (Phase 1) | | | 20.17 | | | 33.93185 | -117.967747 | 18.39 | La Habra Blvd | | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1 | 3 | N | | | N | | | N | | | N P133GA | 8 | 2025-01-10 13:45:45 | 1736545545 | 2025-01-24 09:01:43 | 1737738103 | 2025-01-24 14:59:43 | 1737759583 | N | Orange | Orange | 133 | NB | | | .962 | | | 33.550308 | -117.779562 | .962 | Canyon Acres Dr | Before Woodland Dr | | | .962 | | | 33.554066 | -117.775374 | .962 | Canyon Acres Dr | | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1, RShoulder | 2 | N | | | N | | | N | | | N P1BA | 5 | 2025-01-13 12:34:50 | 1736800490 | 2025-01-24 09:01:48 | 1737738108 | 2025-01-24 14:59:48 | 1737759588 | N | Orange | Orange | 1 | NB | | | 19.41 | | | 33.616967 | -117.917324 | 15.504 | Tustin Ave | | | | 19.41 | | | 33.617589 | -117.918868 | 15.504 | Tustin Ave | | Conventional Hwy | Lane | Standard | Permit Work | 5 | 3 | 3 | N | | | N | | | N | | | N C1SA | 35 | 2025-01-13 08:31:56 | 1736785916 | 2025-01-24 09:01:55 | 1737738115 | 2025-01-24 15:30:55 | 1737761455 | N | Orange | Orange | 1 | SB | | | 25.72 | | | 33.665092 | -118.013153 | 21.814 | 10th st | 17th street | | | 24.72 | | | 33.656989 | -118.00192 | 28.814 | MAIN ST (DOWN TOWN) | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1SA | 25 | 2025-01-13 08:29:58 | 1736785798 | 2025-01-24 09:01:57 | 1737738117 | 2025-01-24 15:30:57 | 1737761457 | N | Orange | Orange | 1 | SB | | | 32.72 | | | 33.740761 | -118.095344 | 25.41 | Seal Beach Blvd | | | | 31.5 | | | 33.727877 | -118.082549 | 28.814 | Warner Ave | Phillips St | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y P5KA | 2 | 2024-12-30 10:01:58 | 1735581718 | 2025-01-24 09:01:57 | 1737738117 | 2025-01-24 11:59:57 | 1737748797 | N | Orange | Orange | 5 | N/A | | | 30.9 | | EB | 33.745498 | -117.84276 | 102.892 | First St and 4th street | West of I-5 Underpass | | | 30.9 | | | 33.745498 | -117.84276 | 102.955 | Santa Ana Fwy, Freeway I-5 | Cabrillo Park Dr. | Surface Street | Lane | Standard | Permit Work | | 2, 3 | 3 | N | | | N | | | N | | | N P5KA | 4 | 2024-12-30 10:02:55 | 1735581775 | 2025-01-24 12:01:53 | 1737748913 | 2025-01-24 14:59:53 | 1737759593 | N | Orange | Orange | 5 | N/A | | | 30.9 | | EB | 33.745498 | -117.84276 | 102.892 | First St and 4th street | West of I-5 Underpass | | | 30.9 | | | 33.745498 | -117.84276 | 102.955 | Santa Ana Fwy, Freeway I-5 | Cabrillo Park Dr. | Surface Street | Lane | Standard | Permit Work | | 1 | 3 | N | | | N | | | N | | | N C5FC | 3 | 2025-01-14 12:38:41 | 1736887121 | 2025-01-24 20:01:00 | 1737777660 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 5 | SB | | | 18.69 | | | 33.61451 | -117.707636 | 90.67 | El Toro Rd | | | | 17.47 | | | 33.60441 | -117.690481 | 90.752 | Alicia Pkwy | | Mainline | Lane | Standard | Miscellaneous Work | | 5, Auxiliary | 5 | N | | | N | | | N | | | N C5LA | 1 | 2025-01-15 11:20:03 | 1736968803 | 2025-01-24 20:01:00 | 1737777660 | 2025-01-25 02:59:00 | 1737802740 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N C241GA | 1 | 2025-01-16 18:33:40 | 1737081220 | 2025-01-24 20:01:00 | 1737777660 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 241 | SB | | | 35.8 | | | 33.820278 | -117.717386 | 21.255 | Toll plaza | | | | 32.5 | | | 33.781702 | -117.748195 | 17.955 | Santiago Cyn Rd | | Mainline | Lane | Standard | K-rail Removal | | 3 | 3 | N | | | N | | | N | | | N C5IC | 3 | 2024-12-26 16:09:10 | 1735258150 | 2025-01-24 20:01:08 | 1737777668 | 2025-01-25 04:59:08 | 1737809948 | N | Orange | Orange | 5 | SB | | | 24.99 | | | 33.690068 | -117.768724 | | Jeffrey Rd | | | | 23.94 | | | 33.675839 | -117.756964 | | Sand Cyn Rd | | Mainline | Lane | Standard | Miscellaneous Work | | 5 | 5 | N | | | N | | | N | | | N C73XA | 6 | 2024-12-26 16:26:13 | 1735259173 | 2025-01-24 20:01:10 | 1737777670 | 2025-01-25 04:59:10 | 1737809950 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C5FC | 1 | 2025-01-14 12:37:41 | 1736887061 | 2025-01-24 20:01:39 | 1737777699 | 2025-01-25 05:59:39 | 1737813579 | N | Orange | Orange | 5 | NB | | | 17.47 | | | 33.604633 | -117.6904 | 89.513 | Alicia Pkwy | | | | 18.69 | | | 33.614705 | -117.707387 | 90.752 | El Toro Rd | | Mainline | Lane | Standard | Landscape Work | | 5, Auxiliary | 5 | N | | | N | | | N | | | N C73XA | 8 | 2024-12-26 16:28:44 | 1735259324 | 2025-01-24 20:01:41 | 1737777701 | 2025-01-25 04:59:41 | 1737809981 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3 | 3 | N | | | N | | | N | | | N C73XA | 12 | 2025-01-16 14:04:57 | 1737065097 | 2025-01-24 20:01:55 | 1737777715 | 2025-01-25 04:59:55 | 1737809995 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C73XA | 10 | 2025-01-16 14:03:59 | 1737065039 | 2025-01-24 20:01:56 | 1737777716 | 2025-01-25 04:59:56 | 1737809996 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55NA | 2 | 2024-12-26 14:25:41 | 1735251941 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 55 | NB | | | 4.74 | | NB | 33.67044 | -117.889523 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | NB | 33.670387 | -117.889553 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55NA | 3 | 2024-12-26 14:30:19 | 1735252219 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 55 | SB | | | 4.74 | | SB | 33.6778 | -117.881528 | | Costa Mesa Frwy, Rte 55 | | | | 4.74 | | SB | 33.67355 | -117.886206 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55NA | 4 | 2024-12-26 15:30:20 | 1735255820 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 55 | NB | | | 10.98 | | NB | 33.741007 | -117.833684 | 10.792 | Costa Mesa Frwy, Rte 55 | | | | 10.98 | | NB | 33.741007 | -117.833692 | 95.252 | Fourth St/ Irvine Blvd | | Off Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C91WA | 3 | 2025-01-10 15:08:19 | 1736550499 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 03:59:00 | 1737806340 | N | Orange | Orange | 91 | WB | | R | 1.842 | | | 33.856194 | -118.008014 | 16.581 | Knott Ave | | | R | .848 | | | 33.856946 | -118.028842 | 16.581 | Valley View St | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N C5IC | 1 | 2024-12-26 15:09:50 | 1735254590 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 5 | SB | | | 23.19 | | SB | 33.680593 | -117.749709 | 95.189 | Santa Ana Fwy, Freeway I-5 | | | | 23.19 | | NB | 33.68057 | -117.749716 | 95.252 | Route 133 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 4 | 2024-12-26 15:00:01 | 1735254001 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 73 | SB | | | 26.581 | | SB | 33.668498 | -117.881491 | | RTE. 73 | | | | 26.581 | | SB | 33.668409 | -117.881469 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405MA | 1 | 2025-01-14 12:57:42 | 1736888262 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 405 | SB | | | 8.74 | | SB | 33.687112 | -117.879621 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.687085 | -117.879573 | 8.51 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 3 | 2024-12-26 14:56:28 | 1735253788 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 73 | NB | | | 26.581 | | NB | 33.670641 | -117.883362 | | RTE. 73 | | | | 26.581 | | SB | 33.670573 | -117.883338 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5IC | 2 | 2024-12-26 15:35:33 | 1735256133 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 5 | NB | | | 30.28 | | NB | 33.739449 | -117.829518 | 102.335 | Santa Ana Fwy, Freeway I-5 | | | | 30.28 | | NB | 33.739369 | -117.829459 | 95.252 | Route 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405CA | 7 | 2025-01-13 20:18:26 | 1736828306 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 4, 5, RShoulder | 5 | N | | | N | | | N | | | N C133ZA | 1 | 2025-01-14 13:56:35 | 1736891795 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 133 | SB | | | 9.565 | | SB | 33.680719 | -117.749618 | 9.579 | Laguna Cyn Frwy, Rte 133 | | | | 9.565 | | NB | 33.680717 | -117.749615 | 9.579 | Santa Ana Frwy, Rte 5 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55DA | 12 | 2025-01-15 17:01:34 | 1736989294 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 55 | N/A | | | 7.85 | | WB | 33.708467 | -117.851332 | | Dyer Rd | | | | 7.85 | | | 33.708467 | -117.851332 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C405CA | 4 | 2025-01-13 20:16:51 | 1736828211 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 4, RShoulder | 4 | N | | | N | | | N | | | N C55NA | 6 | 2025-01-14 14:20:51 | 1736893251 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 55 | NB | | | 6.12 | | NB | 33.686378 | -117.864111 | | John Wayne Airport | | | | 6.12 | | NB | 33.686467 | -117.864154 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55NA | 7 | 2025-01-14 14:26:26 | 1736893586 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C405CA | 1 | 2025-01-13 20:13:52 | 1736828032 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV | 4 | N | | | N | | | N | | | N C55DA | 13 | 2025-01-15 17:01:45 | 1736989305 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 55 | N/A | | | 7.85 | | EB | 33.708668 | -117.85086 | | Dyer Rd | | | | 7.85 | | | 33.708668 | -117.85086 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Electrical Work | | All | 3 | N | | | N | | | N | | | N C55NA | 9 | 2025-01-16 14:56:02 | 1737068162 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 55 | SB | | | 5.32 | | | 33.679784 | -117.879634 | | Baker St | | | | 4.02 | | | 33.665955 | -117.895056 | | Mesa Dr | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 2 | 2025-01-08 15:51:24 | 1736380284 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 55 | SB | | | 9.44 | | SB | 33.727573 | -117.83477 | | Costa Mesa Frwy, Rte 55 | | | | 9.44 | | SB | 33.727573 | -117.834749 | | Edinger Ave | | Off Ramp | Full | Standard | Sign Work | | All | 2 | N | | | N | | | N | | | N C405MA | 2 | 2025-01-14 14:19:00 | 1736893140 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 405 | NB | | | 8.74 | | NB | 33.686966 | -117.865938 | 8.51 | San Diego Frwy, Rte 405 | | | | 8.74 | | NB | 33.686946 | -117.865905 | 9.579 | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C405IC | 1 | 2025-01-16 17:18:52 | 1737076732 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 15 | 2025-01-16 13:24:41 | 1737062681 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 55 | N/A | | | 7.85 | | SB | 33.709078 | -117.85211 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.709078 | -117.85211 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C55DA | 14 | 2025-01-16 13:24:27 | 1737062667 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 55 | N/A | | | 7.85 | | NB | 33.70902 | -117.852051 | | Dyer Rd | Grand Ave Closed Between Dyer and Brookhollow Drive | | | 7.85 | | | 33.70902 | -117.852051 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Lane | Standard | Electrical Work | | 1 | 2 | N | | | N | | | N | | | N C73XA | 1 | 2024-12-26 13:54:06 | 1735250046 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 73 | SB | | | 26.5 | | SB | 33.679925 | -117.880395 | | Baker St | | | | 26.5 | | SB | 33.679916 | -117.880411 | | RTE. 73 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C73XA | 2 | 2024-12-26 14:27:44 | 1735252064 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 73 | NB | | | 9.44 | | NB | 33.670498 | -117.889478 | | RTE. 73 | | | | 9.44 | | NB | 33.670481 | -117.889456 | | Costa Mesa Frwy, Rte 55 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5IC | 4 | 2025-01-16 17:29:13 | 1737077353 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 5 | NB | | | 21.304 | | NB | 33.638633 | -117.729853 | 93.303 | Santa Ana Fwy, Freeway I-5 | | | | 21.304 | | NB | 33.638615 | -117.729837 | 93.366 | 405/5 JCT | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C55NA | 1 | 2024-12-26 14:11:45 | 1735251105 | 2025-01-24 21:01:00 | 1737781260 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 55 | NB | | | 4.737 | | NB | 33.66815 | -117.892307 | 0 | Costa Mesa Frwy, Rte 55 | | | | 4.737 | | SB | 33.668114 | -117.892308 | | Corona Del Mar Frwy, Rte 73 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C73XA | 13 | 2025-01-16 14:07:03 | 1737065223 | 2025-01-24 21:01:01 | 1737781261 | 2025-01-25 03:59:01 | 1737806341 | N | Orange | Orange | 73 | SB | | | 26.5 | | | 33.672294 | -117.885533 | | Baker St | | | | 25.58 | | | 33.661846 | -117.874611 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C73XA | 5 | 2024-12-26 16:26:05 | 1735259165 | 2025-01-24 21:01:02 | 1737781262 | 2025-01-25 04:59:02 | 1737809942 | N | Orange | Orange | 73 | SB | | | 25.58 | | | 33.662141 | -117.874981 | | CAMPUS DR | | | | 26.5 | | | 33.672303 | -117.885463 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55DA | 16 | 2025-01-17 15:24:06 | 1737156246 | 2025-01-24 21:01:03 | 1737781263 | 2025-01-25 04:59:03 | 1737809943 | N | Orange | Orange | 55 | N/A | | | 9.44 | | SB | 33.716885 | -117.844043 | | Edinger Ave | Ritchey ST | | | 9.44 | | | 33.716885 | -117.844043 | | Costa Mesa Frwy, Rte 55 | From N of wright st to S of Edinger Ave | Surface Street | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C55DA | 9 | 2025-01-15 16:58:07 | 1736989087 | 2025-01-24 21:01:04 | 1737781264 | 2025-01-25 04:59:04 | 1737809944 | N | Orange | Orange | 55 | SB | | | 6.99 | | SB | 33.699652 | -117.863456 | | Macarthur Blvd | | | | 6.99 | | SB | 33.699652 | -117.863456 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C55DA | 11 | 2025-01-15 17:00:13 | 1736989213 | 2025-01-24 21:01:10 | 1737781270 | 2025-01-25 04:59:10 | 1737809950 | N | Orange | Orange | 55 | NB | | | 6.99 | | WB | 33.697575 | -117.859759 | | Macarthur Blvd | Macarthur Blvd NB on ramp (MA4Line) | | | 6.99 | | NB | 33.697535 | -117.859727 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C73XA | 11 | 2025-01-16 14:04:14 | 1737065054 | 2025-01-24 21:01:11 | 1737781271 | 2025-01-25 03:59:11 | 1737806351 | N | Orange | Orange | 73 | NB | | | 25.58 | | | 33.662261 | -117.874419 | | CAMPUS DR | | | | 26.5 | | | 33.672371 | -117.884985 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 10 | 2025-01-15 16:59:18 | 1736989158 | 2025-01-24 21:01:15 | 1737781275 | 2025-01-25 04:59:15 | 1737809955 | N | Orange | Orange | 55 | NB | | | 6.99 | | EB | 33.698204 | -117.861068 | | Macarthur Blvd | Macarthur Blvd NB Loop on ramp (MA5 Line) | | | 6.99 | | NB | 33.698204 | -117.861133 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C55DA | 6 | 2025-01-14 15:12:20 | 1736896340 | 2025-01-24 21:01:17 | 1737781277 | 2025-01-25 04:59:17 | 1737809957 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 3 | 2025-01-14 15:05:22 | 1736895922 | 2025-01-24 21:01:19 | 1737781279 | 2025-01-25 04:59:19 | 1737809959 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 4 | 4 | N | | | N | | | N | | | N C55DA | 17 | 2025-01-17 15:25:27 | 1737156327 | 2025-01-24 21:01:25 | 1737781285 | 2025-01-25 04:59:25 | 1737809965 | N | Orange | Orange | 55 | N/A | | | 6.99 | | EB | 33.698013 | -117.860472 | | Macarthur Blvd | | | | 6.99 | | | 33.698013 | -117.860472 | | Costa Mesa Frwy, Rte 55 | | Surface Street | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C73XA | 7 | 2024-12-26 16:28:35 | 1735259315 | 2025-01-24 21:01:33 | 1737781293 | 2025-01-25 04:59:33 | 1737809973 | N | Orange | Orange | 73 | NB | | | 26.5 | | | 33.672335 | -117.884942 | | Baker St | | | | 25.58 | | | 33.662725 | -117.875117 | | CAMPUS DR | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3 | 3 | N | | | N | | | N | | | Y C55DA | 1 | 2025-01-08 15:50:36 | 1736380236 | 2025-01-24 21:01:34 | 1737781294 | 2025-01-25 04:59:34 | 1737809974 | N | Orange | Orange | 55 | SB | | | 9.96 | | SB | 33.730323 | -117.834116 | | Mcfadden St | | | | 9.96 | | SB | 33.730323 | -117.834116 | | Costa Mesa Frwy, Rte 55 | | On Ramp | Full | Standard | Concrete Pour | | All | 2 | N | | | N | | | N | | | N C55DA | 18 | 2025-01-17 15:26:52 | 1737156412 | 2025-01-24 21:01:49 | 1737781309 | 2025-01-25 04:59:49 | 1737809989 | N | Orange | Orange | 55 | NB | | | 6.99 | | NB | 33.695964 | -117.863695 | | Costa Mesa Frwy, Rte 55 | | | | 6.99 | | NB | 33.695852 | -117.863721 | | Macarthur Blvd | | Off Ramp | Full | Standard | Paving Operation | | All | 2 | N | | | N | | | N | | | N C90FA | 2 | 2025-01-02 19:02:14 | 1735873334 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 90 | EB | | | 6.58 | | | 33.910889 | -117.869691 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.910987 | -117.862862 | 9.126 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C5LA | 5 | 2025-01-15 11:24:23 | 1736969063 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.76 | Crown Valley Pkwy | | | | 13.78 | | SB | 33.559216 | -117.673146 | 85.842 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C22HA | 2 | 2025-01-08 12:37:50 | 1736368670 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 22 | WB | | R | 12.88 | | WB | 33.777691 | -117.835919 | 14.451 | Tustin Ave | | | R | 11.83 | | WB | 33.776737 | -117.840448 | 13.391 | Garden Grove Fwy, Rte. 22 | | On Ramp | Full | Standard | Highway Construction | | All | 2 | N | | | N | | | N | | | N C57MA | 2 | 2025-01-02 18:57:45 | 1735873065 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 57 | SB | | | 19.86 | | EB | 33.911135 | -117.886347 | 9.211 | Imperial Hwy, Hwy 90 | | | | 19.86 | | SB | 33.908491 | -117.88291 | 9.126 | Orange Frwy, Rte 57 | | On Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C405CA | 8 | 2025-01-13 20:18:45 | 1736828325 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 405 | NB | | | 5.62 | | | 33.669637 | -117.822794 | 5.39 | Culver Dr | | | | 7.8 | | | 33.68278 | -117.856768 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Highway Construction | | 3, 4, 5, RShoulder | 5 | N | | | N | | | N | | | Y C22PA | 5 | 2024-12-30 08:09:07 | 1735574947 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 22 | EB | | R | .92 | | | 33.77431 | -118.036106 | 2.377 | Valley View St | | | R | 3.45 | | | 33.771155 | -117.994472 | 4.907 | Beach Blvd, Rte 39 | | Mainline | Lane | Standard | K-rail Installation | | HOV, 1 | 3 | N | | | N | | | N | | | N C91WA | 1 | 2025-01-10 15:00:48 | 1736550048 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 91 | WB | | R | 1.842 | | NB | 33.856396 | -118.011063 | 16.581 | Knott Ave | | | R | 1.842 | | WB | 33.856085 | -118.011457 | 16.581 | Artesia Frwy, Rte 91 | | On Ramp | Full | Standard | Loop Detector and Cabinet Swap | | All | 4 | N | | | N | | | N | | | N C91WA | 2 | 2025-01-10 15:02:54 | 1736550174 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 91 | WB | | R | 1.842 | | SB | 33.856624 | -118.011392 | 16.581 | Knott Ave | | | R | 1.842 | | WB | 33.856147 | -118.014322 | 16.581 | Artesia Frwy, Rte 91 | | On Ramp | Full | Standard | Loop Detector and Cabinet Swap | | All | 1 | N | | | N | | | N | | | N C405CA | 5 | 2025-01-13 20:17:10 | 1736828230 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C90FA | 3 | 2025-01-02 19:06:14 | 1735873574 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 90 | WB | | | 6.58 | | | 33.911212 | -117.858815 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911143 | -117.864477 | 9.126 | Kraemer Blvd | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C90FA | 4 | 2025-01-02 19:10:27 | 1735873827 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 90 | WB | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | | | 5.331 | | | 33.911086 | -117.885485 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C90FA | 5 | 2025-01-02 19:16:38 | 1735874198 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 90 | N/A | | | 6.58 | | NB | 33.911537 | -117.863663 | 9.402 | Kraemer Blvd | | | | 6.58 | | | 33.911537 | -117.863663 | 9.402 | Imperial Hwy, Rte. 90 | | Surface Street | Alternating Lanes | Standard | Electrical Work | 1 | L T Lane 1, L T Lane 2, 1, 2, RShoulder, Sidewalk | 2 | N | | | N | | | N | | | N C55NA | 8 | 2025-01-14 14:26:39 | 1736893599 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 55 | NB | | | 4.02 | | | 33.66541 | -117.895136 | | Mesa Dr | | | | 5.32 | | | 33.67962 | -117.87943 | | Baker St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C405CA | 2 | 2025-01-13 20:14:10 | 1736828050 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV, 1 | 4 | N | | | N | | | N | | | N C22HA | 1 | 2025-01-08 12:37:27 | 1736368647 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 22 | WB | | R | 12.88 | | | 33.777249 | -117.836323 | 14.451 | Tustin Ave | | | R | 11.83 | | | 33.775412 | -117.84986 | 13.391 | Glassell St / Grand aver | | Mainline | Lane | Standard | Highway Construction | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C5LA | 7 | 2025-01-15 11:28:38 | 1736969318 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 5 | SB | | | 12.94 | | SB | 33.547257 | -117.673473 | 84.92 | Avery Pkwy | | | | 12.94 | | SB | 33.547257 | -117.673473 | 85.002 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C405IC | 2 | 2025-01-16 17:19:02 | 1737076742 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 405 | SB | | | 9.51 | | | 33.687211 | -117.885074 | 9.28 | Bristol St | | | | 7.8 | | | 33.682511 | -117.856806 | 7.57 | MacArthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C22PA | 10 | 2024-12-30 08:10:24 | 1735575024 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 06:59:00 | 1737817140 | N | Orange | Orange | 22 | WB | | R | 2.65 | | | 33.774549 | -118.007811 | 4.117 | Knott Ave / Garden Grove Blvd | | | R | .92 | | | 33.77465 | -118.037626 | 4.907 | Valley View St | | Mainline | Lane | Standard | K-rail Installation | | HOV, 1 | 3 | N | | | N | | | N | | | N C241GA | 2 | 2025-01-16 18:41:17 | 1737081677 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 241 | NB | | | 33.6 | | | 33.792831 | -117.734633 | 19.055 | Santiago Cyn Rd | | | | 35.6 | | | 33.81749 | -117.717898 | 21.055 | Toll plaza | | Mainline | Lane | Standard | K-rail Removal | | 3 | 3 | N | | | N | | | N | | | N C57MA | 1 | 2025-01-02 18:47:24 | 1735872444 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Full | Standard | Electrical Work | 1 | All | 1 | N | | | N | | | N | | | N C90FA | 1 | 2025-01-02 18:52:44 | 1735872764 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 90 | EB | | | 5.19 | | | 33.911731 | -117.887813 | 8.014 | State College Blvd | | | | 5.331 | | | 33.910978 | -117.885507 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Electrical Work | 1 | 1, 2, 3, RShoulder, Sidewalk | 3 | N | | | N | | | N | | | Y C57TA | 1 | 2025-01-13 13:18:09 | 1736803089 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 57 | NB | | | 15.6 | | NB | 33.845533 | -117.875874 | 4.866 | Orange Frwy, Rte 57 | loc 20 n57-e91 conn | | | 15.6 | | | 33.847922 | -117.87221 | 4.866 | Riverside Frwy, Rte 91 | la palma ave uc | Connector | Full | Standard | Bridge Work | | All | 2 | N | | | N | | | N | | | Y C91WA | 4 | 2025-01-10 15:08:49 | 1736550529 | 2025-01-24 22:01:00 | 1737784860 | 2025-01-25 03:59:00 | 1737806340 | N | Orange | Orange | 91 | WB | | R | 1.842 | | | 33.856194 | -118.008014 | 16.581 | Knott Ave | | | R | .848 | | | 33.856946 | -118.028842 | 16.581 | Valley View St | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | HOV, LShoulder, 1, 2 | 4 | N | | | N | | | N | | | Y C55DA | 7 | 2025-01-14 15:12:31 | 1736896351 | 2025-01-24 22:01:28 | 1737784888 | 2025-01-25 03:59:28 | 1737806368 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 4 | 2025-01-14 15:05:38 | 1736895938 | 2025-01-24 22:01:36 | 1737784896 | 2025-01-25 03:59:36 | 1737806376 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 3, 4 | 4 | N | | | N | | | N | | | Y C5LA | 2 | 2025-01-15 11:20:13 | 1736968813 | 2025-01-24 23:01:00 | 1737788460 | 2025-01-25 02:59:00 | 1737802740 | N | Orange | Orange | 5 | SB | | | 13.78 | | | 33.563274 | -117.67282 | 85.791 | Crown Valley Pkwy | | | | 12.49 | | | 33.540506 | -117.674159 | 84.552 | RTE. 73 | | Mainline | Lane | Standard | Striping Operation | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C57AA | 1 | 2025-01-13 12:08:08 | 1736798888 | 2025-01-24 23:01:00 | 1737788460 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 57 | SB | | | 14.78 | | | 33.8379 | -117.876235 | 4.131 | Lincoln Ave | | | | 11.24 | | | 33.787909 | -117.880101 | .591 | Chapman Ave ( city of orange ) | | Mainline | Lane | Standard | Striping Operation | | HOV, 1, 2, 3 | 5 | N | | | N | | | N | | | Y C5FC | 8 | 2025-01-14 12:42:04 | 1736887324 | 2025-01-24 23:01:00 | 1737788460 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 5 | SB | | | 17.47 | | SB | 33.606966 | -117.695373 | 89.45 | Santa Ana Fwy, Freeway I-5 | AP-1: SB I-5 & Alicia Pkwy Off Ramp | | | 17.47 | | SB | 33.60441 | -117.690481 | 90.752 | Alicia Pkwy | | Off Ramp | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | N C405CA | 10 | 2025-01-13 20:26:45 | 1736828805 | 2025-01-24 23:01:00 | 1737788460 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 405 | NB | | | 5.62 | | SB | 33.671023 | -117.821426 | 5.39 | Culver Dr | cu3 | | | 5.62 | | NB | 33.670646 | -117.825486 | 5.39 | San Diego Frwy, Rte 405 | | On Ramp | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | N C405CA | 6 | 2025-01-13 20:17:25 | 1736828245 | 2025-01-24 23:01:00 | 1737788460 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 405 | NB | | | 2.88 | | | 33.657908 | -117.777907 | 2.65 | Sand Canyon Ave | scd | | | 5.62 | | | 33.669519 | -117.822483 | 5.39 | Culver Dr | cu | Mainline | Lane | Standard | Roadway Excavation | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C405CA | 3 | 2025-01-13 20:14:24 | 1736828064 | 2025-01-24 23:01:00 | 1737788460 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 405 | SB | | | 3.95 | | | 33.663258 | -117.795159 | 3.72 | University Dr | je | | | .23 | | | 33.643982 | -117.735563 | 0 | Santa Ana Frwy, Rte 5 | | Mainline | Lane | Standard | Roadway Excavation | | LShoulder, HOV, 1, 2 | 4 | N | | | N | | | N | | | Y C5FC | 7 | 2025-01-14 12:41:20 | 1736887280 | 2025-01-24 23:01:18 | 1737788478 | 2025-01-25 04:59:18 | 1737809958 | N | Orange | Orange | 5 | NB | | | 17.47 | | WB | 33.606284 | -117.690224 | 89.513 | Alicia Pkwy | AP-6 - WB Alicia Pkwy to NB I-5 Fwy | | | 17.47 | | NB | 33.606677 | -117.693571 | 90.752 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | N C55NA | 5 | 2025-01-14 13:58:29 | 1736891909 | 2025-01-24 23:01:26 | 1737788486 | 2025-01-25 04:59:26 | 1737809966 | N | Orange | Orange | 55 | NB | | | 5.99 | | NB | 33.682922 | -117.876241 | | Costa Mesa Frwy, Rte 55 | | | | 5.99 | | SB | 33.682924 | -117.876229 | 9.579 | San Diego Frwy, Rte 405 | | Connector | Full | Standard | Miscellaneous Work | | All | 2 | N | | | N | | | N | | | Y C5FC | 6 | 2025-01-14 12:40:36 | 1736887236 | 2025-01-24 23:01:33 | 1737788493 | 2025-01-25 04:59:33 | 1737809973 | N | Orange | Orange | 5 | NB | | | 17.47 | | EB | 33.605205 | -117.690153 | 89.513 | Alicia Pkwy | AP-5: EB Alicia Pkwy to NB I-5 On Ramp | | | 17.47 | | NB | 33.604642 | -117.690389 | 90.752 | Santa Ana Fwy, Freeway I-5 | | On Ramp | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | N C55DA | 8 | 2025-01-14 15:12:44 | 1736896364 | 2025-01-24 23:01:42 | 1737788502 | 2025-01-25 02:59:42 | 1737802782 | N | Orange | Orange | 55 | SB | | | 9.96 | | | 33.733718 | -117.834036 | | Mcfadden St | | | | 6.99 | | | 33.698653 | -117.86189 | 10.112 | Macarthur Blvd | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C55DA | 5 | 2025-01-14 15:05:55 | 1736895955 | 2025-01-24 23:01:53 | 1737788513 | 2025-01-25 02:59:53 | 1737802793 | N | Orange | Orange | 55 | NB | | | 6.3 | | | 33.690829 | -117.868815 | | Macarthur Blvd | | | | 10.3 | | | 33.738471 | -117.833698 | 10.112 | Mcfadden St | | Mainline | Lane | Standard | Miscellaneous Work | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C5FC | 5 | 2025-01-14 12:39:57 | 1736887197 | 2025-01-24 23:01:55 | 1737788515 | 2025-01-25 04:59:55 | 1737809995 | N | Orange | Orange | 5 | NB | | | 17.47 | | NB | 33.602551 | -117.68657 | 89.513 | Santa Ana Fwy, Freeway I-5 | AP-4 NB I-5 to Alicia Pkwy Off Ramp | | | 17.47 | | NB | 33.604633 | -117.6904 | 90.752 | Alicia Pkwy | | Off Ramp | Full | Standard | Pavement Repair | | All | 1 | N | | | N | | | N | | | N C5FC | 2 | 2025-01-14 12:38:00 | 1736887080 | 2025-01-24 23:01:58 | 1737788518 | 2025-01-25 04:59:58 | 1737809998 | N | Orange | Orange | 5 | NB | | | 17.47 | | | 33.604633 | -117.6904 | 89.513 | Alicia Pkwy | | | | 18.69 | | | 33.614705 | -117.707387 | 90.752 | El Toro Rd | | Mainline | Lane | Standard | Landscape Work | | 4, 5, Auxiliary | 5 | N | | | N | | | N | | | N C405EA | 1 | 2025-01-13 11:17:41 | 1736795861 | 2025-01-24 23:59:00 | 1737791940 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 405 | SB | | | 23.98 | | SB | 33.787777 | -118.095965 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.789498 | -118.088734 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y C405CA | 9 | 2025-01-13 20:22:52 | 1736828572 | 2025-01-24 23:59:00 | 1737791940 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 405 | NB | | | 1.8 | | NB | 33.65171 | -117.759424 | 1.57 | San Diego Frwy, Rte 405 | | | | 1.8 | | SB | 33.652522 | -117.761098 | 1.57 | Laguna Frwy, Rte 133 | c4 | Connector | Full | Standard | Highway Construction | | All | 1 | N | | | N | | | N | | | Y C405EA | 2 | 2025-01-13 11:18:24 | 1736795904 | 2025-01-24 23:59:00 | 1737791940 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 405 | NB | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Diego Frwy, Rte 405 | | | | 23.98 | | NB | 33.78362 | -118.09118 | 23.75 | San Gabriel River Frwy, Rte 605 | | Connector | Full | Standard | Landscape Work | | All | 2 | N | | | N | | | N | | | Y C5MA | 5 | 2025-01-06 12:13:45 | 1736194425 | 2025-01-25 00:01:00 | 1737792060 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 5 | NB | | | 28.25 | | NB | 33.725239 | -117.802745 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5MA | 10 | 2025-01-06 12:16:40 | 1736194600 | 2025-01-25 00:01:00 | 1737792060 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 5 | SB | | | 28.25 | | SB | 33.7283 | -117.808281 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5MA | 22 | 2025-01-06 12:19:48 | 1736194788 | 2025-01-25 00:01:00 | 1737792060 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 5 | SB | | | 29.61 | | SB | 33.741509 | -117.836571 | 101.602 | Santa Ana Fwy, Freeway I-5 | | | | 29.61 | | | 33.73749 | -117.825956 | 101.602 | Newport Ave | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C91WA | 5 | 2025-01-10 15:09:47 | 1736550587 | 2025-01-25 02:01:00 | 1737799260 | 2025-01-25 03:59:00 | 1737806340 | N | Orange | Orange | 91 | WB | | R | 1.842 | | | 33.856194 | -118.008014 | 16.581 | Knott Ave | | | R | .848 | | | 33.856946 | -118.028842 | 16.581 | Valley View St | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | LShoulder, HOV, 1, 2, 3 | 4 | N | | | N | | | N | | | Y C5LA | 8 | 2025-01-15 11:29:28 | 1736969368 | 2025-01-25 03:01:00 | 1737802860 | 2025-01-25 07:59:00 | 1737820740 | N | Orange | Orange | 5 | SB | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.791 | Santa Ana Fwy, Freeway I-5 | | | | 13.78 | | SB | 33.561625 | -117.67304 | 85.002 | Crown Valley Pkwy | | Off Ramp | Full | Standard | Striping Operation | | All | 2 | N | | | N | | | N | | | N C91WA | 7 | 2025-01-10 15:12:16 | 1736550736 | 2025-01-25 04:01:00 | 1737806460 | 2025-01-25 05:59:00 | 1737813540 | N | Orange | Orange | 91 | WB | | R | 1.842 | | | 33.856194 | -118.008014 | 16.581 | Knott Ave | | | R | .848 | | | 33.856946 | -118.028842 | 16.581 | Valley View St | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y C91WA | 6 | 2025-01-10 15:11:36 | 1736550696 | 2025-01-25 04:01:00 | 1737806460 | 2025-01-25 04:59:00 | 1737809940 | N | Orange | Orange | 91 | WB | | R | 1.842 | | | 33.856194 | -118.008014 | 16.581 | Knott Ave | | | R | .848 | | | 33.856946 | -118.028842 | 16.581 | Valley View St | | Mainline | Lane | Standard | Loop Detector and Cabinet Swap | | 2, 3, 4, RShoulder | 4 | N | | | N | | | N | | | Y P5KA | 1 | 2024-12-30 10:01:58 | 1735581718 | 2025-01-25 09:01:57 | 1737824517 | 2025-01-25 11:59:57 | 1737835197 | N | Orange | Orange | 5 | N/A | | | 30.9 | | EB | 33.745498 | -117.84276 | 102.892 | First St and 4th street | West of I-5 Underpass | | | 30.9 | | | 33.745498 | -117.84276 | 102.955 | Santa Ana Fwy, Freeway I-5 | Cabrillo Park Dr. | Surface Street | Lane | Standard | Permit Work | | 2, 3 | 3 | N | | | N | | | N | | | N P5KA | 2 | 2024-12-30 10:02:55 | 1735581775 | 2025-01-25 12:01:53 | 1737835313 | 2025-01-25 14:59:53 | 1737845993 | N | Orange | Orange | 5 | N/A | | | 30.9 | | EB | 33.745498 | -117.84276 | 102.892 | First St and 4th street | West of I-5 Underpass | | | 30.9 | | | 33.745498 | -117.84276 | 102.955 | Santa Ana Fwy, Freeway I-5 | Cabrillo Park Dr. | Surface Street | Lane | Standard | Permit Work | | 1 | 3 | N | | | N | | | N | | | N C1SA | 1 | 2025-01-20 11:10:27 | 1737400227 | 2025-01-27 06:01:25 | 1737986485 | 2025-01-27 13:59:25 | 1738015165 | N | Orange | Orange | 1 | NB | | | 17.43 | | | 33.613139 | -117.891514 | | Jamboree Rd | | | | 18.07 | | | 33.616186 | -117.908206 | | Bayside Dr | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N P39GA | 1 | 2025-01-15 13:41:23 | 1736977283 | 2025-01-27 09:01:00 | 1737997260 | 2025-01-27 14:59:00 | 1738018740 | N | Orange | Orange | 39 | NB | | | 20.17 | | | 33.930897 | -117.967736 | 18.39 | La Habra Blvd | South of La Habra Blvd. (Phase 1) | | | 20.17 | | | 33.93185 | -117.967747 | 18.39 | La Habra Blvd | | Conventional Hwy | Lane | Standard | Permit Work | | R T Lane 1 | 3 | N | | | N | | | N | | | N C57MA | 3 | 2025-01-13 04:45:59 | 1736772359 | 2025-01-27 09:01:00 | 1737997260 | 2025-01-27 14:59:00 | 1738018740 | N | Orange | Orange | 57 | SB | | | 19.86 | | SB | 33.91422 | -117.882944 | 9.211 | Orange Frwy, Rte 57 | | | | 19.86 | | EB/WB | 33.911118 | -117.885455 | 9.126 | Imperial Hwy, Hwy 90 | | Off Ramp | Alternating Lanes | Standard | Striping Operation | 1 | L T Lane 1, 1, R T Lane 1 | 3 | N | | | N | | | N | | | N M73FA | 1 | 2025-01-15 08:03:14 | 1736956994 | 2025-01-27 09:01:00 | 1737997260 | 2025-01-27 14:01:00 | 1738015260 | N | Orange | Orange | 73 | N/A | | | 24.78 | | EB | 33.654029 | -117.866013 | 14.78 | Jamboree Rd | | | | 24.78 | | N/A | 33.654029 | -117.866013 | 14.78 | RTE. 73 | | Surface Street | Lane | Standard | Bridge Work | 0 | 4, R T Lane 2 | 4 | N | | | N | | | N | | | N P73IA | 1 | 2025-01-16 12:53:57 | 1737060837 | 2025-01-27 09:01:00 | 1737997260 | 2025-01-27 14:59:00 | 1738018740 | N | Orange | Orange | 73 | N/A | | | 26.5 | | WB | 33.680165 | -117.887986 | | Baker St | | | | 26.5 | | | 33.680165 | -117.887986 | | RTE. 73 | | Surface Street | Lane | Standard | Permit Work | 5 | 1 | 2 | N | | | N | | | N | | | N P74AA | 2 | 2025-01-17 11:59:47 | 1737143987 | 2025-01-27 09:01:00 | 1737997260 | 2025-01-27 14:59:00 | 1738018740 | N | Orange | Orange | 74 | WB | | | 1.711 | | | 33.513929 | -117.636368 | 1.711 | SHD TR LN /AVA SIEGAA | | | | .241 | | | 33.504589 | -117.652976 | .241 | RANCHO VIEJO RD | | Conventional Hwy | Lane | Standard | Permit Work | 5 | RShoulder | 2 | N | | | N | | | N | | | N P74AA | 1 | 2025-01-17 11:58:15 | 1737143895 | 2025-01-27 09:01:00 | 1737997260 | 2025-01-27 14:59:00 | 1738018740 | N | Orange | Orange | 74 | EB | | | .241 | | | 33.503583 | -117.654628 | .241 | RANCHO VIEJO RD | | | | 1.711 | | | 33.514768 | -117.633434 | 1.711 | SHD TR LN /AVA SIEGAA | | Conventional Hwy | Lane | Standard | Permit Work | 5 | RShoulder, 2 | 2 | N | | | N | | | N | | | Y C90FA | 6 | 2025-01-13 04:41:00 | 1736772060 | 2025-01-27 09:01:00 | 1737997260 | 2025-01-27 14:59:00 | 1738018740 | N | Orange | Orange | 90 | EB/WB | | | 5.331 | | | 33.911032 | -117.885496 | | State College Blvd | | | | 5.331 | | | 33.910988 | -117.885464 | | Orange Frwy, Rte 57 | | Conventional Hwy | Alternating Lanes | Standard | Striping Operation | 1 | 1, 2, 3 | 3 | N | | | N | | | N | | | Y P405CA | 1 | 2025-01-17 16:37:08 | 1737160628 | 2025-01-27 09:01:06 | 1737997266 | 2025-01-27 14:59:06 | 1738018746 | N | Orange | Orange | 405 | NB | | | 11.45 | | NB | 33.68844 | -117.913119 | 11.22 | San Diego Frwy, Rte 405 | | | | 11.45 | | NB | 33.689242 | -117.919105 | 11.22 | Harbor Blvd | | Off Ramp | Lane | Standard | Permit Work | | RShoulder | 2 | N | | | N | | | N | | | N C1SA | 6 | 2025-01-20 11:11:09 | 1737400269 | 2025-01-27 09:01:07 | 1737997267 | 2025-01-27 15:30:07 | 1738020607 | N | Orange | Orange | 1 | NB | | | 29.89 | | | 33.728225 | -118.082819 | 22.58 | Warner Ave | Phillips St | | | 32.72 | | | 33.740818 | -118.095271 | 28.814 | Seal Beach Blvd | | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y C1SA | 21 | 2025-01-20 11:13:14 | 1737400394 | 2025-01-27 09:01:12 | 1737997272 | 2025-01-27 15:30:12 | 1738020612 | N | Orange | Orange | 1 | SB | | | 32.72 | | | 33.740761 | -118.095344 | 25.41 | Seal Beach Blvd | | | | 31.5 | | | 33.727877 | -118.082549 | 28.814 | Warner Ave | Phillips St | Conventional Hwy | Lane | Standard | K-rail Installation | | 2 | 2 | N | | | N | | | N | | | Y P55DA | 1 | 2025-01-17 16:31:31 | 1737160291 | 2025-01-27 09:01:28 | 1737997288 | 2025-01-27 14:59:28 | 1738018768 | N | Orange | Orange | 55 | SB | | | 5.51 | | SB | 33.683822 | -117.876539 | | Costa Mesa Frwy, Rte 55 | | | | 5.51 | | | 33.681972 | -117.877574 | | Paularino Ave | | Off Ramp | Lane | Standard | Permit Work | | R T Lane 1 | 2 | N | | | N | | | N | | | N C1SA | 16 | 2025-01-20 11:12:31 | 1737400351 | 2025-01-27 09:01:29 | 1737997289 | 2025-01-27 15:30:29 | 1738020629 | N | Orange | Orange | 1 | SB | | | 18.07 | | | 33.616223 | -117.902259 | | Bayside Dr | | | | 17.43 | | | 33.613221 | -117.894152 | 28.814 | Jamboree Rd | | Conventional Hwy | Lane | Standard | Electrical Work | | 3 | 3 | N | | | N | | | N | | | N C1SA | 36 | 2025-01-20 11:16:34 | 1737400594 | 2025-01-27 09:01:32 | 1737997292 | 2025-01-27 15:30:32 | 1738020632 | N | Orange | Orange | 1 | SB | | | 25.72 | | | 33.665092 | -118.013153 | 21.814 | 10th st | 17th street | | | 24.72 | | | 33.656989 | -118.00192 | 28.814 | MAIN ST (DOWN TOWN) | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y P133GA | 1 | 2025-01-10 16:32:39 | 1736555559 | 2025-01-27 09:01:36 | 1737997296 | 2025-01-27 14:59:36 | 1738018776 | N | Orange | Orange | 133 | SB | | | .962 | | | 33.560562 | -117.772714 | .962 | Canyon Acres Dr | | | | .962 | | | 33.555517 | -117.774663 | .962 | Canyon Acres Dr | | Conventional Hwy | Lane | Standard | Permit Work | | 1 | 1 | N | | | N | | | N | | | Y C1SA | 11 | 2025-01-20 11:11:48 | 1737400308 | 2025-01-27 09:01:46 | 1737997306 | 2025-01-27 15:30:46 | 1738020646 | N | Orange | Orange | 1 | NB | | | 32.72 | | | 33.74105 | -118.095638 | 25.41 | Seal Beach Blvd | | | | 33.72 | | | 33.749903 | -118.105868 | 28.814 | Orange / Los Angeles County Line | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1SA | 26 | 2025-01-20 11:14:51 | 1737400491 | 2025-01-27 09:01:49 | 1737997309 | 2025-01-27 15:30:49 | 1738020649 | N | Orange | Orange | 1 | SB | | | 33.72 | | | 33.750305 | -118.106073 | | Orange / Los Angeles County Line | | | | 32.72 | | | 33.741128 | -118.096191 | 28.814 | Seal Beach Blvd | | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C1SA | 31 | 2025-01-20 11:15:52 | 1737400552 | 2025-01-27 09:01:50 | 1737997310 | 2025-01-27 15:30:50 | 1738020650 | N | Orange | Orange | 1 | NB | | | 24.72 | | | 33.656826 | -118.001371 | 20.814 | MAIN ST (DOWN TOWN) | | | | 25.72 | | | 33.666651 | -118.015045 | 28.814 | 10th st | 17th Street | Conventional Hwy | Lane | Standard | Curb/Gutter/Sidewalk Work | | 2 | 2 | N | | | N | | | N | | | Y C22PA | 1 | 2024-12-30 08:08:38 | 1735574918 | 2025-01-27 21:01:00 | 1738040460 | 2025-01-28 04:59:00 | 1738069140 | N | Orange | Orange | 22 | EB | | R | .92 | | | 33.77431 | -118.036106 | 2.377 | Valley View St | | | R | 3.45 | | | 33.771155 | -117.994472 | 4.907 | Beach Blvd, Rte 39 | | Mainline | Lane | Standard | K-rail Installation | | HOV, 1 | 3 | N | | | N | | | N | | | N C22HA | 3 | 2025-01-08 12:38:29 | 1736368709 | 2025-01-27 22:01:00 | 1738044060 | 2025-01-28 04:59:00 | 1738069140 | N | Orange | Orange | 22 | WB | | R | 12.88 | | | 33.777258 | -117.836312 | 14.451 | Tustin Ave | | | R | 11.83 | | | 33.775412 | -117.84986 | 13.391 | Glassell St / Grand aver | | Mainline | Lane | Standard | Highway Construction | | 2, 3, 4 | 4 | N | | | N | | | N | | | Y C22HA | 4 | 2025-01-08 12:40:17 | 1736368817 | 2025-01-27 22:01:00 | 1738044060 | 2025-01-28 04:59:00 | 1738069140 | N | Orange | Orange | 22 | WB | | R | 12.88 | | WB | 33.777744 | -117.835898 | 14.451 | Tustin Ave | | | R | 11.83 | | WB | 33.776737 | -117.840448 | 13.391 | Garden Grove Fwy, Rte. 22 | | On Ramp | Full | Standard | Highway Construction | | All | 2 | N | | | N | | | N | | | N C22PA | 6 | 2024-12-30 08:10:06 | 1735575006 | 2025-01-27 22:01:00 | 1738044060 | 2025-01-28 04:59:00 | 1738069140 | N | Orange | Orange | 22 | WB | | R | 2.65 | | | 33.774549 | -118.007811 | 4.117 | Knott Ave / Garden Grove Blvd | | | R | .92 | | | 33.77465 | -118.037626 | 4.907 | Valley View St | | Mainline | Lane | Standard | K-rail Installation | | HOV, 1 | 3 | N | | | N | | | N | | | N C5MA | 6 | 2025-01-06 12:16:06 | 1736194566 | 2025-01-27 23:01:04 | 1738047664 | 2025-01-28 04:59:04 | 1738069144 | N | Orange | Orange | 5 | SB | | | 28.25 | | SB | 33.7283 | -117.808281 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N C5MA | 1 | 2025-01-06 12:13:12 | 1736194392 | 2025-01-27 23:01:10 | 1738047670 | 2025-01-28 04:59:10 | 1738069150 | N | Orange | Orange | 5 | NB | | | 28.25 | | NB | 33.725239 | -117.802745 | 100.305 | Santa Ana Fwy, Freeway I-5 | | | | 28.25 | | | 33.725739 | -117.803808 | 100.305 | Tustin Ranch Rd | | Off Ramp | Full | Standard | Electrical Work | | All | 1 | N | | | N | | | N | | | N