Duration Chart


Lane Closure System duration field
Type Description
Standard are closures for which the lanes are closed and reopened at the same times on each day of the closure period. (e.g., lanes are closed from 1pm to 3pm every day from start-date to end-date).
Long Term are closures for which the lanes are closed continuously (24 hours/day) from the beginning of the closure period until the end (or indefinitely: only Long Term closures can have indefinite end dates).
Intermittent are closures for which some subset (possibly all) of the affected lanes are closed and reopened intermittently at unscheduled times during the closure period (usually because they have to close lanes during those brief periods when large equipment must be moved).

 

 

Facility Chart


Lane Closure System facility field
Description
Collector
Connector
Conventional Hwy
Ferry
HOV
HOV Connector
HOV Off Ramp
HOV On Ramp
Mainline
Off Ramp
On Ramp
Rest Area
Surface Street
Toll Bridge
Toll Plaza
Truck Bypass
Truck Connector
Tunnels/Tubes

 

 

Lane Type Chart


Lane Closure System lane type field
Lane Type Abbreviation Used in District
2 Way Left Turn 2 W LTurn 4
All All 1,2,3,4,5,6,7,8,9,10,11,12
Auxiliary Lane Auxiliary 1,2,3,4,5,6,7,8,9,10,11,12
Bike Lane Bike Lane 1,2,3,4,5,6,7,8,9,10,11,12
Bike Path Bike Path 1,2,3,4,5,6,7,8,9,10,11,12
Collector Collector 1,2,3,4,5,6,8,9,10,11,12
Collector 1 Collector1 7
Collector 2 Collector2 7
Collector 3 Collector3 7
Express Lane 1 Express 1 8,12
Express Lane 2 Express 2 8,12
FasTrak FasTrak 1,2,3,4,5,6,7,8,9,10,11,12
HOV HOV 12
Left HOV Left HOV 1,2,3,4,5,6,8,9,10,12
Left HOV 1 Left HOV1 7
Left HOV 2 Left HOV2 7
Left HOV 3 Left HOV3 7
Left Lane Left Lane 10
Left Median Shoulder LMedianShd 5
Left Shoulder LShoulder 1,2,3,4,6,7,8,9,10,11,12
Left Turn Left Turn 4
Left Turn Lane Lf Turn Ln 10
Left Turn Lane 1 L T Lane 1 12
Left Turn Lane 2 L T Lane 2 12
Left Turn Pocket L T Pocket 8,11
Lt Turn Lane Lt Turn Ln 5,6
Median Median 1,2,3,4,5,6,7,8,9,10,11,12
Right HOV Right HOV 1,2,3,4,5,6,7,8,9,10,11,12
Right Lane Right Lane 10
Right Shoulder RShoulder 1,2,3,4,5,6,7,8,9,10,11,12
Right Turn Right Turn 4
Right Turn Lane Rt Turn Ln 10
Right Turn Lane 1 R T Lane 1 12
Right Turn Lane 2 R T Lane 2 12
Right Turn Pocket R T Pocket 8,11
Rt Turn Lane Rt Turn Ln 5,6
Sidewalk Sidewalk 1,2,3,4,5,6,7,8,9,10,11,12
Two-Way Left Turn Lane 2-W L Turn 10

 

 

Type of Work Chart


Lane Closure System type of work field
Type of Work Used in District
A.C. Dike 4
AC Paving 1,3,6,7,8,9,10,11,12
AC Paving 5
AC Paving/Overlay 4
Accident 5
Accident Investigation 1,2,3,4,5,6,7,8,9,11,12
Accident Investigations 10
Accident with Closure 5
Aerial Crossing 4
Amtrak Station & Rd Widening 4
Assist CHP/Tow Company 5
Attenuator Repair 1,2,3,4,5,6,7,8,9,11,12
Attenuator/Barrels Repair 10
Blasting 1,2,3,4,5,6,7,8,9,10,11,12
Border Activity 11
Bridge Construction 4,7
Bridge Demolition 7
Bridge Inspection 1,2,3,4,5,6,7,8,9,10,11,12
Bridge Maintenance 7
Bridge Multiple work 12
Bridge Painting 4,11
Bridge Pavement Striping 12
Bridge Rail Repair 7
Bridge Repair 4
Bridge Replacement 5
Bridge Retrofit 4
Bridge Work 1,2,3,5,6,7,8,9,10,11,12
Bridge Work - Temporary Signal 5
Bridge or Ferry Repairs 4
Brush Fire 6,7,12
Building Wall 1
CHP Investigation 4
Call Boxes 4
Channelizer Replacement 4
Chip Seal Operation 1,2,3,4,5,6,7,8,9,10,11,12
Clean Ditches 3
Clear & Grub 4
Cold plane operation 12
Concrete Barrier Work 11
Concrete Pavement 4
Concrete Pour 1,2,3,4,5,6,8,9,10,11,12
Core Drilling 1,2,3,4,5,6,7,8,9,10,11,12
Crack Seal Operation 1,2,3,4,5,6,7,8,9,10,11,12
Curb & Gutter Work 7
Curb/Gutter/Sidewalk 4
Curb/Gutter/Sidewalk Work 1,2,3,5,6,7,8,9,10,11,12
Demolition 4
Demolition Work 7
Downed Tree 1
Drain Cleaning 7
Drain Inspection 7
Drainage Cleaning 1,2,3,4,5,6,8,9,11,12
Drainage Cleaning/Inspection 10
Drainage Inspection 1,2,3,4,5,6,8,9,11,12
Drainage Work 1,2,3,4,5,6,7,8,9,10,11,12
Drainage Work (Ramps Only) 5
Driveway Construction 9
Electrical Repair 4,7
Electrical Work 1,2,3,4,5,6,7,8,9,11,12
Emergency Slab Repair 7
Emergency Work 1,2,3,4,5,6,7,8,9,11,12
Emergency Work w/Ramp Closure 5
Emergency Work: 1 Hour Delays 5
Emergency Work: 30 Min Delays 5
Environmental Engineering 4
Equipment Staging 4
Equipment move 3
Equipment moving 12
Erosion/Slope Repair 8
Excavate & Re-Pave 4
FIRE Cleanup/Repairs 4
FLOODING AREA 12
Facility Upgrade 5
Falsework Installation 1,2,3,4,5,6,7,8,9,10,11,12
Falsework Removal 1,2,3,4,5,6,7,8,9,10,11,12
Fence Repair 7
Fence Work 1,2,3,4,5,6,7,8,9,10,11,12
Filming Activity 1,2,3,4,5,6,7,8,9,10,11,12
Fire 1,4,5
Fire Emergency 3
Flooded Areas 12
Flooding 1,4,5
Fog Seal Operation 1,2,3,4,5,6,7,8,9,10,11,12
Fracture Critical Bridge Insp. 9
Gas Leak 5
Gas Line Work 4,5
Geotechnical Work 10
Gore Excavation w/Ramps 5
Gore Paving w/Ramp Closures 5
Graffiti Removal 1,2,4,5,6,7,8,10,11
Graffity Removal 3,9,12
Grind and Pave (w/ramps) 5
Grinding 7
Grinding Operation 1,2,3,4,5,6,8,9,10,11,12
Grinding and Paving 1,2,3,4,5,6,8,9,10,11,12
Guardrail Inspection 5
Guardrail Installation 7
Guardrail Repair 1,2,3,4,5,6,7,8,9,10,11,12
Guardrail Work 1,2,3,4,5,6,7,8,9,10,11,12
Guardrail Work: 30 Min Delays 5
HWY 37 MAJOR REHAB 4
HazMat Clean-up 2
Hazmat Clean-Up 8
Highway Construction 1,2,3,4,6,8,9,10,11,12
Homeless Encampments 6
Horizontal Boring 4
Hwy Repair Due to Accident 10
Hwy Sensors/Loop Detectors 4
ITS/Various Electrical Works 10
Illegal Encampment Removal 4
Incident Cleanup/Repairs 1
Inclement Weather 9
Inspection 4
Installing Rumble Strip 3
Intermittent Closures 5
Joint Assembly Work 7
K-Rail Installation 7
K-Rail Removal 7
K-rail Installation 1,2,3,4,5,6,8,9,10,11,12
K-rail Removal 1,2,3,4,5,6,8,9,11,12
K-rail Removal/Repair 10
Landscape Work 1,2,3,4,5,6,7,8,9,11,12
Landscape/Irrigation Work 10
Law Enforcement Activity 5
Litter Removal 1,2,3,4,5,6,7,8,9,10,11,12
Loop Installation 3,7
Maintenance Operation 1,2,3,4,6,8,11,12
Median Barrier Installation 7
Median Barrier Repair 7
Median Barrier Work 1,2,3,4,5,6,7,8,9,10,11,12
Median Closure 5
Methacrylate Deck Seal Treatme 12
Miscellaneous Work 1,2,3,4,5,6,8,9,11,12
Monitoring Well 4
Mowing 1,4,5
Mowing Operation 2
Mudslide Removal 7
Multiple Bridge work 12
OVERSIGHT-Construction 3
OVERSIGHT-Permits 3
Overhead Sign Work 7
PCC Paver Move 3
Pavement Marker Replacement 1,2,3,4,5,6,7,8,9,10,11,12
Pavement Rehabilitation 7
Pavement Repair 1,2,3,4,5,6,7,8,9,10,11,12
Pavement Work 1,2,3,4,5,6,7,8,9,10,11,12
Paving (including ramps) 5
Paving Operation 1,2,3,4,5,6,7,8,9,10,11,12
Permanent Road Closure of Hwy 7
Permit Work 12
Pile Driving 1,2,3,4,5,6,7,8,9,10,11,12
Pole Repair/Replace 4
Police Activity 6,11
Police Investigation 6
Polyester concrete overlays 12
Pot-Holing 7
Pothole Repair 7
Potholing 1
Potholing Utilities 4
Power Outage 5
Pre-Construction Work 4
Pump House Work 7
Railroad Related Work 7,9
Railroad Repair 10
Railroad Work 5
Rairoad Xing 4
Reconstruct Ramp 5
Rest Area Closure 2
Rest Area Maintenance 7,9
Rest Area Renovation 5
Retaining Wall 4
Risk of Mudslide 5
River Overflow/Flood Area 10
Road Maintenance 7
Road Survey 7
Road Work/Median Cross-Over 5
Roadside sign work 12
Roadway Excavation 1,2,3,4,5,6,7,8,9,10,11,12
Roadway Flooding 6
Roadway wash-out/slip-out 10
Rock Fence 2
SFOBB CLOSED 4
SFOBB WB Clsd. HolidayWeekend 4
Salvage 2
Sawcutting Operation 7
Seasonal Closure - Rest Area 2
Seasonal Road Closure 2
Seismic Retrofit 7
Sewer Work 1,2,3,4,5,6,8,9,10,11,12
Shot Blasting 3
Shoulder Reconstruction 7
Shoulder Work 1,2,3,4,5,6,7,8,9,10,11,12
Sign Installation 7
Sign Removal 7
Sign Work 1,2,3,4,5,6,7,8,9,10,11,12
Sign Work Including Ramps 5
Signalized 1-Way Control 4
Slab Repacement w/Ramp Closure 5
Slab Repair 5,7
Slab Replacement 1,2,3,4,5,6,7,8,9,10,11,12
Slide - Emergency Vehic. Only 5
Slide - Mud/Dirt/Rock 5
Slide - Temporary Signal 5
Slide Removal 1,2,3,4,5,6,7,8,9,10,11,12
Slide Repair 2
Slipout Repair 1
Slope Clearing 1,2,3,4,5,6,7,8,9,11,12
Slope Paving 7
Slope Repair 5
Slope Repair Work 7
Slope Repair/Clearing 10
Snow 1
Snow & Icing Conditions 6
Snow Operations 3
Snow Removal 3
Snow clearing/removal 10
Soundwall Work 1,2,3,4,5,6,7,8,9,10,11,12
Special Event 1,2,3,4,5,6,7,8,9,10,11,12
Spill-Accident Clean up 7
Spray Operation 1,2,3,4,5,6,7,8,9,10,11,12
Storm Damage Repairs 4
Storm Event 5
Striping Operation 1,2,3,4,5,6,7,8,9,10,11,12
Striping Operation w/Ramps 5
Striping with ramp closures 5
Survey Work 1,2,3,4,5,6,7,8,9,10,11,12
Sweeping Operation 1,2,3,4,5,6,7,8,9,10,11,12
TEST 8
Testing 4
Traffic Detectors/Sensors 4
Traffic Signal Work 1,2,3,4,5,6,7,8,9,10,11,12
Tree Removal 5,7
Tree Trimming 7
Tree Work 1,2,3,4,5,6,7,8,9,10,11,12
Tree Work (30 Minute Delays) 5
Truck Ingress/Egress 4
Tunnel Washing 7
Urgent Safety Work 4
Utility Potholing 10
Utility Work 1,2,3,4,5,6,7,8,9,10,11,12
Utility Work (Potholing) 5
Vegetation Control 5
Vegetation Fire 2,9
Vegetation Fire Rehab 2
Vegetation Spraying 1,2,3,4,5,6,7,8,9,10,11,12
WINTER WEATHER CLOSURE 2
Wash Out/Slide Repair 4
Water Leak 5
Weather Related Conditions 7
Weeding 7
Wild Fire 10
Wildfire 9
Winter Closure 9
only Striping Operation 12