Duration Chart
Type | Description |
---|---|
Standard | are closures for which the lanes are closed and reopened at the same times on each day of the closure period. (e.g., lanes are closed from 1pm to 3pm every day from start-date to end-date). |
Long Term | are closures for which the lanes are closed continuously (24 hours/day) from the beginning of the closure period until the end (or indefinitely: only Long Term closures can have indefinite end dates). |
Intermittent | are closures for which some subset (possibly all) of the affected lanes are closed and reopened intermittently at unscheduled times during the closure period (usually because they have to close lanes during those brief periods when large equipment must be moved). |
Facility Chart
Description |
---|
Collector |
Connector |
Conventional Hwy |
Ferry |
HOV |
HOV Connector |
HOV Off Ramp |
HOV On Ramp |
Mainline |
Off Ramp |
On Ramp |
Rest Area |
Surface Street |
Toll Bridge |
Toll Plaza |
Truck Bypass |
Truck Connector |
Tunnels/Tubes |
Lane Type Chart
Lane Type | Abbreviation | Used in District |
---|---|---|
2 Way Left Turn | 2 W LTurn | 4 |
All | All | 1,2,3,4,5,6,7,8,9,10,11,12 |
Auxiliary Lane | Auxiliary | 1,2,3,4,5,6,7,8,9,10,11,12 |
Bike Lane | Bike Lane | 1,2,3,4,5,6,7,8,9,10,11,12 |
Bike Path | Bike Path | 1,2,3,4,5,6,7,8,9,10,11,12 |
Collector | Collector | 1,2,3,4,5,6,8,9,10,11,12 |
Collector 1 | Collector1 | 7 |
Collector 2 | Collector2 | 7 |
Collector 3 | Collector3 | 7 |
Express Lane 1 | Express 1 | 8,12 |
Express Lane 2 | Express 2 | 8,12 |
FasTrak | FasTrak | 1,2,3,4,5,6,7,8,9,10,11,12 |
HOV | HOV | 12 |
Left HOV | Left HOV | 1,2,3,4,5,6,8,9,10,12 |
Left HOV 1 | Left HOV1 | 7 |
Left HOV 2 | Left HOV2 | 7 |
Left HOV 3 | Left HOV3 | 7 |
Left Lane | Left Lane | 10 |
Left Median Shoulder | LMedianShd | 5 |
Left Shoulder | LShoulder | 1,2,3,4,6,7,8,9,10,11,12 |
Left Turn | Left Turn | 4 |
Left Turn Lane | Lf Turn Ln | 10 |
Left Turn Lane 1 | L T Lane 1 | 12 |
Left Turn Lane 2 | L T Lane 2 | 12 |
Left Turn Pocket | L T Pocket | 8,11 |
Lt Turn Lane | Lt Turn Ln | 5,6 |
Median | Median | 1,2,3,4,5,6,7,8,9,10,11,12 |
Right HOV | Right HOV | 1,2,3,4,5,6,7,8,9,10,11,12 |
Right Lane | Right Lane | 10 |
Right Shoulder | RShoulder | 1,2,3,4,5,6,7,8,9,10,11,12 |
Right Turn | Right Turn | 4 |
Right Turn Lane | Rt Turn Ln | 10 |
Right Turn Lane 1 | R T Lane 1 | 12 |
Right Turn Lane 2 | R T Lane 2 | 12 |
Right Turn Pocket | R T Pocket | 8,11 |
Rt Turn Lane | Rt Turn Ln | 5,6 |
Sidewalk | Sidewalk | 1,2,3,4,5,6,7,8,9,10,11,12 |
Two-Way Left Turn Lane | 2-W L Turn | 10 |
Type of Work Chart
Type of Work | Used in District |
---|---|
A.C. Dike | 4 |
AC Paving | 1,3,6,7,8,9,10,11,12 |
AC Paving | 5 |
AC Paving/Overlay | 4 |
Accident | 5 |
Accident Investigation | 1,2,3,4,5,6,7,8,9,11,12 |
Accident Investigations | 10 |
Accident with Closure | 5 |
Aerial Crossing | 4 |
Amtrak Station & Rd Widening | 4 |
Assist CHP/Tow Company | 5 |
Attenuator Repair | 1,2,3,4,5,6,7,8,9,11,12 |
Attenuator/Barrels Repair | 10 |
Blasting | 1,2,3,4,5,6,7,8,9,10,11,12 |
Border Activity | 11 |
Bridge Construction | 4,7 |
Bridge Demolition | 7 |
Bridge Inspection | 1,2,3,4,5,6,7,8,9,10,11,12 |
Bridge Maintenance | 7 |
Bridge Multiple work | 12 |
Bridge Painting | 4,11 |
Bridge Pavement Striping | 12 |
Bridge Rail Repair | 7 |
Bridge Repair | 4 |
Bridge Replacement | 5 |
Bridge Retrofit | 4 |
Bridge Work | 1,2,3,5,6,7,8,9,10,11,12 |
Bridge Work - Temporary Signal | 5 |
Bridge or Ferry Repairs | 4 |
Brush Fire | 6,7,12 |
Building Wall | 1 |
CHP Investigation | 4 |
Call Boxes | 4 |
Channelizer Replacement | 4 |
Chip Seal Operation | 1,2,3,4,5,6,7,8,9,10,11,12 |
Clean Ditches | 3 |
Clear & Grub | 4 |
Cold plane operation | 12 |
Concrete Barrier Work | 11 |
Concrete Pavement | 4 |
Concrete Pour | 1,2,3,4,5,6,8,9,10,11,12 |
Core Drilling | 1,2,3,4,5,6,7,8,9,10,11,12 |
Crack Seal Operation | 1,2,3,4,5,6,7,8,9,10,11,12 |
Curb & Gutter Work | 7 |
Curb/Gutter/Sidewalk | 4 |
Curb/Gutter/Sidewalk Work | 1,2,3,5,6,7,8,9,10,11,12 |
Demolition | 4 |
Demolition Work | 7 |
Downed Tree | 1 |
Drain Cleaning | 7 |
Drain Inspection | 7 |
Drainage Cleaning | 1,2,3,4,5,6,8,9,11,12 |
Drainage Cleaning/Inspection | 10 |
Drainage Inspection | 1,2,3,4,5,6,8,9,11,12 |
Drainage Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Drainage Work (Ramps Only) | 5 |
Driveway Construction | 9 |
Electrical Repair | 4,7 |
Electrical Work | 1,2,3,4,5,6,7,8,9,11,12 |
Emergency Slab Repair | 7 |
Emergency Work | 1,2,3,4,5,6,7,8,9,11,12 |
Emergency Work w/Ramp Closure | 5 |
Emergency Work: 1 Hour Delays | 5 |
Emergency Work: 30 Min Delays | 5 |
Environmental Engineering | 4 |
Equipment Staging | 4 |
Equipment move | 3 |
Equipment moving | 12 |
Erosion/Slope Repair | 8 |
Excavate & Re-Pave | 4 |
FIRE Cleanup/Repairs | 4 |
FLOODING AREA | 12 |
Facility Upgrade | 5 |
Falsework Installation | 1,2,3,4,5,6,7,8,9,10,11,12 |
Falsework Removal | 1,2,3,4,5,6,7,8,9,10,11,12 |
Fence Repair | 7 |
Fence Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Filming Activity | 1,2,3,4,5,6,7,8,9,10,11,12 |
Fire | 1,4,5 |
Fire Emergency | 3 |
Flooded Areas | 12 |
Flooding | 1,4,5 |
Fog Seal Operation | 1,2,3,4,5,6,7,8,9,10,11,12 |
Fracture Critical Bridge Insp. | 9 |
Gas Leak | 5 |
Gas Line Work | 4,5 |
Geotechnical Work | 10 |
Gore Excavation w/Ramps | 5 |
Gore Paving w/Ramp Closures | 5 |
Graffiti Removal | 1,2,4,5,6,7,8,10,11 |
Graffity Removal | 3,9,12 |
Grind and Pave (w/ramps) | 5 |
Grinding | 7 |
Grinding Operation | 1,2,3,4,5,6,8,9,10,11,12 |
Grinding and Paving | 1,2,3,4,5,6,8,9,10,11,12 |
Guardrail Inspection | 5 |
Guardrail Installation | 7 |
Guardrail Repair | 1,2,3,4,5,6,7,8,9,10,11,12 |
Guardrail Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Guardrail Work: 30 Min Delays | 5 |
HWY 37 MAJOR REHAB | 4 |
HazMat Clean-up | 2 |
Hazmat Clean-Up | 8 |
Highway Construction | 1,2,3,4,6,8,9,10,11,12 |
Homeless Encampments | 6 |
Horizontal Boring | 4 |
Hwy Repair Due to Accident | 10 |
Hwy Sensors/Loop Detectors | 4 |
ITS/Various Electrical Works | 10 |
Illegal Encampment Removal | 4 |
Incident Cleanup/Repairs | 1 |
Inclement Weather | 9 |
Inspection | 4 |
Installing Rumble Strip | 3 |
Intermittent Closures | 5 |
Joint Assembly Work | 7 |
K-Rail Installation | 7 |
K-Rail Removal | 7 |
K-rail Installation | 1,2,3,4,5,6,8,9,10,11,12 |
K-rail Removal | 1,2,3,4,5,6,8,9,11,12 |
K-rail Removal/Repair | 10 |
Landscape Work | 1,2,3,4,5,6,7,8,9,11,12 |
Landscape/Irrigation Work | 10 |
Law Enforcement Activity | 5 |
Litter Removal | 1,2,3,4,5,6,7,8,9,10,11,12 |
Loop Installation | 3,7 |
Maintenance Operation | 1,2,3,4,6,8,11,12 |
Median Barrier Installation | 7 |
Median Barrier Repair | 7 |
Median Barrier Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Median Closure | 5 |
Methacrylate Deck Seal Treatme | 12 |
Miscellaneous Work | 1,2,3,4,5,6,8,9,11,12 |
Monitoring Well | 4 |
Mowing | 1,4,5 |
Mowing Operation | 2 |
Mudslide Removal | 7 |
Multiple Bridge work | 12 |
OVERSIGHT-Construction | 3 |
OVERSIGHT-Permits | 3 |
Overhead Sign Work | 7 |
PCC Paver Move | 3 |
Pavement Marker Replacement | 1,2,3,4,5,6,7,8,9,10,11,12 |
Pavement Rehabilitation | 7 |
Pavement Repair | 1,2,3,4,5,6,7,8,9,10,11,12 |
Pavement Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Paving (including ramps) | 5 |
Paving Operation | 1,2,3,4,5,6,7,8,9,10,11,12 |
Permanent Road Closure of Hwy | 7 |
Permit Work | 12 |
Pile Driving | 1,2,3,4,5,6,7,8,9,10,11,12 |
Pole Repair/Replace | 4 |
Police Activity | 6,11 |
Police Investigation | 6 |
Polyester concrete overlays | 12 |
Pot-Holing | 7 |
Pothole Repair | 7 |
Potholing | 1 |
Potholing Utilities | 4 |
Power Outage | 5 |
Pre-Construction Work | 4 |
Pump House Work | 7 |
Railroad Related Work | 7,9 |
Railroad Repair | 10 |
Railroad Work | 5 |
Rairoad Xing | 4 |
Reconstruct Ramp | 5 |
Rest Area Closure | 2 |
Rest Area Maintenance | 7,9 |
Rest Area Renovation | 5 |
Retaining Wall | 4 |
Risk of Mudslide | 5 |
River Overflow/Flood Area | 10 |
Road Maintenance | 7 |
Road Survey | 7 |
Road Work/Median Cross-Over | 5 |
Roadside sign work | 12 |
Roadway Excavation | 1,2,3,4,5,6,7,8,9,10,11,12 |
Roadway Flooding | 6 |
Roadway wash-out/slip-out | 10 |
Rock Fence | 2 |
SFOBB CLOSED | 4 |
SFOBB WB Clsd. HolidayWeekend | 4 |
Salvage | 2 |
Sawcutting Operation | 7 |
Seasonal Closure - Rest Area | 2 |
Seasonal Road Closure | 2 |
Seismic Retrofit | 7 |
Sewer Work | 1,2,3,4,5,6,8,9,10,11,12 |
Shot Blasting | 3 |
Shoulder Reconstruction | 7 |
Shoulder Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Sign Installation | 7 |
Sign Removal | 7 |
Sign Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Sign Work Including Ramps | 5 |
Signalized 1-Way Control | 4 |
Slab Repacement w/Ramp Closure | 5 |
Slab Repair | 5,7 |
Slab Replacement | 1,2,3,4,5,6,7,8,9,10,11,12 |
Slide - Emergency Vehic. Only | 5 |
Slide - Mud/Dirt/Rock | 5 |
Slide - Temporary Signal | 5 |
Slide Removal | 1,2,3,4,5,6,7,8,9,10,11,12 |
Slide Repair | 2 |
Slipout Repair | 1 |
Slope Clearing | 1,2,3,4,5,6,7,8,9,11,12 |
Slope Paving | 7 |
Slope Repair | 5 |
Slope Repair Work | 7 |
Slope Repair/Clearing | 10 |
Snow | 1 |
Snow & Icing Conditions | 6 |
Snow Operations | 3 |
Snow Removal | 3 |
Snow clearing/removal | 10 |
Soundwall Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Special Event | 1,2,3,4,5,6,7,8,9,10,11,12 |
Spill-Accident Clean up | 7 |
Spray Operation | 1,2,3,4,5,6,7,8,9,10,11,12 |
Storm Damage Repairs | 4 |
Storm Event | 5 |
Striping Operation | 1,2,3,4,5,6,7,8,9,10,11,12 |
Striping Operation w/Ramps | 5 |
Striping with ramp closures | 5 |
Survey Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Sweeping Operation | 1,2,3,4,5,6,7,8,9,10,11,12 |
TEST | 8 |
Testing | 4 |
Traffic Detectors/Sensors | 4 |
Traffic Signal Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Tree Removal | 5,7 |
Tree Trimming | 7 |
Tree Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Tree Work (30 Minute Delays) | 5 |
Truck Ingress/Egress | 4 |
Tunnel Washing | 7 |
Urgent Safety Work | 4 |
Utility Potholing | 10 |
Utility Work | 1,2,3,4,5,6,7,8,9,10,11,12 |
Utility Work (Potholing) | 5 |
Vegetation Control | 5 |
Vegetation Fire | 2,9 |
Vegetation Fire Rehab | 2 |
Vegetation Spraying | 1,2,3,4,5,6,7,8,9,10,11,12 |
WINTER WEATHER CLOSURE | 2 |
Wash Out/Slide Repair | 4 |
Water Leak | 5 |
Weather Related Conditions | 7 |
Weeding | 7 |
Wild Fire | 10 |
Wildfire | 9 |
Winter Closure | 9 |
only Striping Operation | 12 |